Study on Safety and Efficient Mining Scheme for Low Grade Nickel Ore Under Complex Mining Conditions

Baohui TAN1(),Yongding WANG2,Zhigui ZHANG1,Weiguo LONG2,Bin LI1,Jianyuan HE2,Zhen GONG2   

  1. 1.School of Environment and Resources, Southwest University of Science and Technology, Mianyang 621010, Sichuan, China
    2.Longshou Mine, Jinchuan Group Co. , Ltd. , Jinchang 737100, Gansu, China
  • Received:2022-10-16 Revised:2022-11-22 Online:2023-02-28 Published:2023-03-27

Abstract:

In the upper middle section of West No.2 mining area of Longshou mine,it is necessary to adopt the non-pilar sublevel caving method within the range of ore body with a height of less than 70 m to achieve safe,efficient and low loss mining of low grade ore resources,the ore mining conditions are very complex.In view of these key technical problems,the research was carried out one by one.Firstly,a technical scheme for the formation of overburden by inducing caving of large volume cemented backfill was proposed.At the same time,the mechanical properties,structural characteristics and caving ability of cemented backfill were studied,the results show that backfill has good collapsibility.Secondly,the fragmentation degree of cemented backfill was studied by means of field investigation and physical experiment.The results show that although the strength of cemented backfill is small,it will not produce a large amount of powder after the initial caving and secondary crushing during ore drawing,and the average block size of cemented backfill is greater than the average block size of the ore falling from the fan-shaped blasthole.Therefore,the caving cemented backfill will not lead to the premature dilution of the ore.Subsequently,a combined ore drawing scheme was proposed for the only four stoping sections in the caving stope,and the effectiveness of the scheme was studied by physical ore drawing experiments.The experimental results show that the ore recovery rate of the scheme can reach 85.4%,while the dilution rate is only 6.5%.Finally,the above research results were applied to the field production practice,and the roof cementation backfill was successfully induced to fall naturally to form a covering layer with a thickness of about 30 m.While ensuring the ore recovery rate in the stope,the dilution rate is controlled within 10%,so that the stope productivity is increased by 30%,the mining cost is reduced by 28%,and the safe,efficient,low loss,and low-cost mining of low-grade ore in the West No.2 mining area was realized under complex mining conditions.

Key words: low grade nickel ore, restricted mining space, non-pilar sublevel caving mining method, overburden formation, caved block size, dilution and loss control

CLC Number: 

  • TD853

Fig.1

Schematic diagram of stope distribution in West No.2 mining area"

Fig.2

Schematic diagram of overburden formation scheme by induced caving of large volume backfill"

Table 1

Key physical and mechanical parameters of cemented backfill in West No.2 mining area"

参数名称数值参数名称数值
密度/(kg·m-32 200抗剪强度/MPa2
抗压强度/MPa4.8内摩擦角/(°)36
抗拉强度/MPa0.5弹性模量/GPa7.2

Fig.3

Structural characteristics of downward horizontal layered cemented backfill"

Fig.4

Stress diagram of cemented backfill layered beam"

Fig.5

Investigation site,site condition and image vectorization results of fragmentation of caved cemented backfill"

Table 2

Initial caving block composition of cemented backfill"

块体

尺寸/m

块度

分级

各测点块度分布情况/%

平均值

/%

5行调查点6行调查点7行调查点
>0.6大块53201429
0.3~0.6中块19353630
0.1~0.3次中块11362223
<0.1小块16102818

Fig.6

Experimental process of caving cemented backfill crushing"

Fig.7

Simulation experiment process of secondary crushing of caving cemented backfill"

Table 3

Experimental results of secondary crushing of caving cemented backfill"

块度分级块体尺寸/cm占比/%次级块度平均值/%初始冒落块度平均值/%差值/%
第1次试验第2次试验
大块>0.619.617.218.429.0-10.6
中块0.6~0.328.231.930.130.0-0.1
次中块0.3~0.125.926.226.023.0+3.0
小块<0.126.324.725.518.0+7.5

Table 4

Block composition of caving ore in fan-type medium-deep hole"

块度

分级

尺寸/m扇形炮孔崩落矿石块度组成比例/%崩落矿石块度平均值/%充填体初始冒落块度/%充填体次级块度/%
锦宁矿业大顶山矿区镜铁山矿桦树沟矿区傲牛矿业毛公铁矿
大块>0.6006.32.129.018.4
中块0.6~0.312.6015.39.330.030.1
次中块0.3~0.142.345.135.641.023.026.0
小块<0.145.154.942.847.618.025.5

Fig.8

Ore-drawing model design drawing and physical 3D model"

Table 5

Ore-drawing control modes of three groups of test schemes"

分段编号试验方案1试验方案2试验方案3(本研究方案)
分段1总量控制出矿(40%)总量控制出矿(40%)总量控制出矿(40%)
分段2总量控制出矿(80%)总量控制出矿(80%)总量控制出矿(80%)
分段3截止品位方式出矿低贫化方式出矿低贫化方式出矿
分段4截止品位方式出矿截止品位方式出矿低贫化方式出矿

Table 6

Ore recovery indexes of three groups of test schemes"

方案序号矿石回收率/%废石混入率/%
试验方案187.615.5
试验方案286.510.8
试验方案385.46.5

Fig.9

Caving cemented backfill released in the first mining section and microseismic monitoring results of caving"

Fig.10

Fan-shaped blasthole layout and blasting fragmentation effect"

Table 7

Ore recovery indexes of each mining sublevel"

分段编号分段矿石回收率/%分段废石混入率/%
1 595 m284.5
1 580 m(9线以东)85.88.6
1 580 m(9线以西)37.75.2
1 565 m1038.5
Cao Jianli, Ren Fengyu,2013.Research of dispersions bedding’s safety thickness in processing deposits with induced caving[J].Metal Mine,42(3):45-48.
Dong Feng, Zheng Chengying, Min Zhongpeng,2018.Experimental research on safe and efficient extraction of moderately inclined low-grade ore body under complex mining conditions[J].Gold,39(12):27-31.
Gao Pengju, Zhou Li,2019.Optimized selection and application of mining method in South Huangshan copper-nickel mine[J].Gold,40(6):35-39.
Hu Haibo,2015.Optimization of mining method for gently inclined,thick,large and difficult-to-mine orebody with low grade[J].Mining Research and Development,35(8):9-11.
Huang Xingyi,2011.Research on overburden layer thickness of no-pillar sublevel caving in Jianshan iron mine[J].Nonferrous Metals Design,38(3):6-10.
Jiang Lichun, Chen Peng, Wu Aixiang,2019.Roof self-stabilizing arching effect of goaf based on different roof-contacted filling rate[J].The Chinese Journal of Nonferrous Metals,29(1):187-193.
Li Haigang, Liu Jingde, Wan Chuanchuan,2018.High-efficient mining technology of eastern lean difficult-excavated tungsten ore body[J].Nonferrous Metals(Mining Section),70(2):1-4,14.
Li Nan, Ren Fengyu, Zhao Yunfeng,et al,2010.Study on the formation of overburden layer during the transition from open pit to underground mining in Xiaowanggou iron mine[J].Metal Mine,39(12):9-11.
Lin Lü,2011.The Application of Photography-Image Processing in the Analysis of Rock Fragmentation[D].Wuhan:Wuhan University of Technology.
Luo Jia, Liu Xiaosheng, Zhou Aimin,2016.Study on selection of roof caving method for high sublevel caving stope[J].Mining Research and Development,36(10):6-10.
Qi Zhiping, Zhang Xiaoyan,2022.On the risk management of China’s enterprise futures market from the Lunni incident[J].Tsinghua Financial Review,(5):52-56.
Ren Fengyu, Han Zhiyong, Zhao Enping,et al,2007.Induced caving technique and it’s application in Beiminghe iron mine[J].Mining Research and Development,27(1):17-19.
Ren Fengyu, Kang Peisheng,1998.Ore/rock size effects on the ore drawing control in sublevel caving[J].China Mining Magazine,7(6):25-27.
Sun Guoquan, Fu Zhanyu, Sun Jiangxian,et al,2011.Pillar recovery and covering layer formation technique during transferring from open stope into caving method[J].Metal Mine,40(1):5-7,11.
Sun Mingzhi,2014.The High Efficient Mining Technology of Heishan Iron Deposit During the Period of Open-pit Transferring to Under Ground Mining[D].Shenyang:Northeastern University.
Sun Wenyong, Chen Xingming, Tan Baohui,et al,2013.Reasons and countermeasures of ore loss and depletion in complex orebody conditions [J].Journal of Liaoning Technical University(Natural Science),32(10):1339-1343.
Wang Zhenmin, Li Zhenlong, Li Shuai,et al,2021.Application of mechanized upward slicing and filling method in mining low grade,gently inclined and multilayer parallel gold veins[J].China Mining Magazine,30(11):87-93.
Xue Xiaomeng, Mo Dongxu, Luo Jia,2020.Application of large-diameter and deep-hole caving process in the mining of low-grade and thick deposits[J].Mining Research and Development,40(4):8-11.
Yang Limei,2011.Induced caving technique and its application in roof breaking for non-pillar sublevel caving[J].Gansu Metallurgy,33(4):33-34,57.
Zhang Guolian, Qiu Jingping, Song Shouzhi,2004.Study on relationship between recovery index and sublevel number in pillarless sublevel caving[J].Metal Mine,33(4):14-16,19.
Zhang Zhigui, Liu Xingguo, Yu Guoli,2007.Non-dilution Draw for Sublevel Caving:Non-dilution Draw Method and Its Application in Mines[M].Shenyang: Northeastern University Press.
曹建立,任凤玉,2013.诱导冒落法处理时采空区散体垫层的安全厚度[J].金属矿山,42(3):45-48.
董峰,郑成英,闵忠鹏,2018.复杂开采条件缓倾斜低品位矿体安全高效回采试验研究[J].黄金,39(12):27-31.
高鹏举,周礼,2019.黄山南铜镍矿采矿方法优化选择及应用[J].黄金,40(6):35-39.
胡海波,2015.低品位厚大缓倾斜难采矿体采矿方法优化研究[J].矿业研究与开发,35(8):9-11.
黄兴益,2011.尖山铁矿无底柱分段崩落法覆盖层厚度的研究[J].有色金属设计,38(3):6-10.
姜立春,陈鹏,吴爱祥,2019.基于不同充填接顶率的采空区顶板拱架自稳效应[J].中国有色金属学报,29(1):187-193.
李海港,刘经德,万串串,2018.某低品位难采钨矿高效开采技术研究[J].有色金属(矿山部分),70(2):1-4,14.
李楠,任凤玉,赵云峰,等,2010.小汪沟铁矿露天转地下覆盖层形成方法研究[J].金属矿山,39(12):9-11.
罗佳,柳小胜,周爱民,2016.高分段无底柱崩落法放顶方法选择研究[J].矿业研究与开发,36(10): 6-10.
吕林,2011.图像处理技术在岩体块度分析中的应用[D].武汉:武汉理工大学.
齐稚平,张晓燕,2022.从伦镍事件看我国企业期货市场风险管理[J].清华金融评论,(5):52-56.
任凤玉,韩智勇,赵恩平,等,2007.诱导冒落技术及其在北洺河铁矿的应用[J].矿业研究与开发,27(1):17-19.
任凤玉,康培生,1998.无底柱分段崩落法出矿控制点与矿岩块度关系的实验研究[J].中国矿业,7(6):25-27.
孙国权,付占宇,孙江先,等,2011.空场法转崩落法开采时的矿柱回采及覆盖层形成技术[J].金属矿山,40(1): 5-7,11.
孙明志,2014.黑山铁矿露天转地下高效开采技术研究[D].沈阳:东北大学.
孙文勇,陈星明,谭宝会,等,2013.复杂矿体条件矿石损失贫化原因及对策[J].辽宁工程技术大学学报(自然科学版),32(10):1339-1343.
王振闽,李振龙,李帅,等,2021.机械化上向水平分层充填法在低品位缓倾斜多层金矿脉开采中的应用[J].中国矿业,30(11):87-93.
薛小蒙,莫东旭,罗佳,等,2020.大直径深孔落矿工艺在低品位厚大矿床开采中的应用[J].矿业研究与开发,40(4):8-11.
杨丽梅,2011.诱导冒落技术在无底柱分段崩落法放顶中的应用[J].甘肃冶金,33(4):33-34,57.
张国联,邱景平,宋守志,2004.无底柱分段崩落法回收指标与分段数关系研究[J].金属矿山,33(4):14-16,19.
张志贵,刘兴国,于国立,2007.无底柱分段崩落法无贫化放矿:无贫化放矿理论及其在矿山的实践[M].沈阳: 东北大学出版社.
[1] Jielin LI,Jingyao WANG,Yigai XIAO,Xiaoshuang LI. Research on Meso-mechanical Properties of Rock Under Different Stress Paths Based on Discrete Element Method [J]. Gold Science and Technology, 2023, 31(1): 102-112.
[2] Qing YANG,Shijiao YANG,Ranyue ZHANG. Flocculation Sedimentation Test of Ultrafine Tailings Based on Turbidity of Supernatant Liquid [J]. Gold Science and Technology, 2022, 30(6): 948-957.
[3] Huayou SU,Yongding WANG,Baohui TAN,Weiguo LONG,Ning YANG,Zhigui ZHANG,Xingming CHEN. Study on Induced Caving Mechanism and Development Process of Large Area Cemented Backfill [J]. Gold Science and Technology, 2022, 30(5): 713-723.
[4] Xianfeng XU,Pengfei XING,Suihong WANG,Yong WANG. Rock Mass Quality Evaluation and Application Based on Game Theory and G1-EW-TOPSIS Method [J]. Gold Science and Technology, 2022, 30(5): 704-712.
[5] Kui ZHAO,Zhouchao LIU,Peng ZENG,Cong GONG. Experimental Study on Energy Damage Evolution Characteristics of Filling Specimens with Different Sizes Under Uniaxial Compression [J]. Gold Science and Technology, 2022, 30(4): 540-549.
[6] Liangyin GUO,Wanfei JIANG,Zhaofa SONG,Xiaoguang LIU,Jinchao ZHANG. Large Diameter Long Hole Cutoff Slot Blasting Method for Sublevel Open Stoping with Delayed Filling in Xincheng Gold Mine [J]. Gold Science and Technology, 2022, 30(4): 585-593.
[7] Ziyang ZHANG,Ping CAO,Zhizhen LIU,Feng XIAO. Study on Creep Characteristics and Nonlinear Creep Model of Argillaceous Siltstone [J]. Gold Science and Technology, 2022, 30(3): 449-459.
[8] Yongliang FAN, Jiqiang CUI, Yuankun ZHANG, Feng LI, Chunyun HUANG, Yuantong GU, Jianyuan HE. Influence of Mixed Coarse Aggregate Ratio on Strength and Fluidity of Filling Slurry [J]. Gold Science and Technology, 2022, 30(2): 263-271.
[9] Feng GAO,Haoquan AI,Yaodong LIANG,Zengwu LUO,Xin XIONG,Keping ZHOU,Gen YANG. Optimization of Proportioning of Waste Rock and Tailings Mixed Filling Materials Based on NSGA-II Algorithm [J]. Gold Science and Technology, 2022, 30(1): 46-53.
[10] Zhaoyu LI,Wei SUN,Shengyou ZHANG,Jinxin LI. Study on the Effect of Physical Properties of Full Tailings on Flocculation and Sedimentation Performance [J]. Gold Science and Technology, 2022, 30(1): 64-71.
[11] Hongwei ZHANG,Fuxing ZHANG,Sheng SUN,Zhengcheng GUO. Research and Application of High-efficiency Drift Backfill Mining Method in Gently Inclined Broken Orebody [J]. Gold Science and Technology, 2021, 29(6): 899-907.
[12] Xiaodong FAN,Xiang LI,Ming TAO,Tubing YIN,Xibing LI. Study on Mode and Mode Fracture Characteristics of Granite Under Different Thermal Shock Process [J]. Gold Science and Technology, 2021, 29(6): 834-842.
[13] Meidao ZHANG,Yunzhang RAO,Wenfeng XU,Wentao WANG. Orthogonal Experiment on Optimization of Filling Ratio of Full Tailings Paste [J]. Gold Science and Technology, 2021, 29(5): 740-748.
[14] Zhenghua TAN,Yang WEN,Liguan WANG,Guotai LI. Optimization Method for Preparation of Underground Mining Plan Based on Critical Chain [J]. Gold Science and Technology, 2021, 29(4): 602-611.
[15] Shaobo JIN,Kewei LIU,Jin HUANG,Shaohu JIN. Study on Damage Constitutive Model of Backfill Under Uniaxial Compression Loading [J]. Gold Science and Technology, 2021, 29(4): 555-563.
Viewed
Full text


Abstract

Cited

  Shared   
  Discussed   
No Suggested Reading articles found!