Study on Optimization of Structural Parameters of Hexagonal Mining Method with Large Cross-section

Qinli ZHANG1(),Chaoyu JIANG1(),Xiang GAO1,Bin LIU2   

  1. 1.School of Resources and Safety Engineering,Central South University,Changsha 410083,Hunan,China
    2.Jinchuan Group Co. , Ltd. ,Jinchang 737100,Gansu,China
  • Received:2019-06-28 Revised:2019-09-26 Online:2020-02-29 Published:2020-02-26
  • Contact: Chaoyu JIANG E-mail:zhangqinlicn@126.com;13278883353@163.com

Abstract:

The reasonable selection of stope structural parameters is a key process in mining design,which has an important influence on stope stability,blasting drilling depth,explosive consumption,mining efficiency and stress state of surrounding rock.Reasonable stope structural parameters are conducive to improve the stress conditions during route mining,reduce the stress and strain values of surrounding rock around the stope, reduce the support workload and improve the mining efficiency under the condition of ensuring safe mining.Based on the lean ore resources mining in the Xiyi mining area of Longshou Mine,Jinchuan Group,we use bionic principle to design the mining route with honeycomb hexagonal structure,so as to improve the surrounding rock stress conditions,improve the stope stability and effectively control the crustalstress.Xiyi mining area is located between 17 and 34 rows in the west mining area of Longshou Mine,Jinchuan Group,and between level of 1 220 m and 1 520 m.Adopt the general hexagonal section mining method for mining,with the section specification of 4 m*6 m*5 m (top and bottom width * waist width* height) practice has proved that,the adaptability of the section specification and borehole layout to the broken ore body in Xiyi lean mine is poor.Aiming at the problems of low drilling depth rate,irregular cross-section outline,low mechanization degree and high explosive consumption in the process of general hexagonal approach mining in Xiyi lean mining area of Longshou Mine,this study adopted empirical analogy method and proposed a hexagonal approach mining method with large cross-section size of 4 m*8 m*8 m (top and bottom width*waist width*height).Based on FLAC3D software,the excavation and filling process of the test roadway were simulated numerically and analyzed.The maximum principal stress appears in the top plate of the route,the minimum principal stress lies in the bottom plate and the lower side of the route,and the stress concentration phenomenon appears in the upper part between the two access roads.And then field tests were carried out according to the designed mining technology to study the feasibility of the large cross-section hexagonal roadway mining method in the Xiyi lean mining area of Longshou Mine.Research indicates:Comparing ordinary hexagonal mining method,when the large cross-section hexagonal approach is adopted to mine the resources of Xiyi lean ore mining area,the stope roof and floor,and side rock are under better stress conditions,the roof and floor deformation is small,and there is no connection between the two approaches. In the lower inverted trapezoid mining,the step blasting driving method is adopted,which increases the free surface in the vertical direction and reduces the rock clamping effect during blasting.The average footage increased from 2.4 m to 3.2 m,increase by 33.3%.The explosive unit consumption is reduced from 0.2 kg/t to 0.15 kg/t,and the explosive consumption is reduced by 25%.Due to the reasonable arrangement of blastholes and the design of initiation sequence,the explosive energy is released in turn during blasting,and the damage of blasting vibration to the side wall and bottom plate is less.This improves contour integrity,maximum over-excavation reduced by 97 cm,maximum under-excavation reduced by 10 cm.At the same time,it is also conducive to the formation of the next layered hexagonal route. Due to the large working space of large section hexagonal drift mining method,Boomer double arm drilling jumbo is designed to drill,which greatly improves the drilling efficiency and safety.And rock drilling efficiency increased from 1.25 m/min to 2.10 m/min. It proves the feasibility of the large-section hexagonal approach in the mining process of the Xiyi lean mining area of Longshou Mine,and realize the requirements for safety and efficiency in the mining process.

Key words: large section, hexagonal approach, numerical simulation, structural parameters, blasting parameters

CLC Number: 

  • TD862

Fig.1

Second stratified mining sketch of 1 448 m sectional 20-line and 22-line"

Fig.2

Schematic diagram of mining method for large cross-section hexagonal approach"

Fig.3

Blasting design and section diagram inlet"

Table 1

Basic mechanical parameters of related ore and rock"

矿岩类别弹性模量/GPa抗拉强度/MPa泊松比容重γ/(kN·m-3黏结力/MPa内摩擦角/(°)
矿体62.02.000.2229.90.5640.0
围岩60.01.960.2427.50.5339.0
充填体6.80.850.1517.20.5538.0

Fig.4

Simulation model and route number"

Fig.5

Nephogram of simulation process"

Table 2

Cyclic feed data of two mining schemes(m)"

采矿方案各循环进尺平均进尺
123456789101112
大断面正梯形2.5232332222332.5
大断面倒梯形3.54544.553.544---4.2
普通断面22.12.22.42.82.42.12.62.52.32.42.62.4

Fig.6

Schematic diagram of measuring point"

Fig.7

Measurement results and design section error diagram"

Fig.8

Site drawing of route section"

Table 3

Average drilling efficiency records for each cycle(m/min)"

采矿方案各循环凿岩效率平均
123456789101112
大断面正梯形1.61.92.01.92.31.82.32.42.12.01.92.02.02
大断面倒梯形1.92.52.32.02.42.52.32.42.4---2.29
普通断面1.11.21.21.51.41.21.31.01.11.01.41.61.25

Fig.9

Site drawing of route drilling"

Table 4

Record of average explosive unit consumption in each cycle(kg/t)"

采矿方案各循环炸药单耗平均
123456789101112
大断面正梯形0.240.240.230.250.210.190.210.250.110.240.150.150.19
大断面倒梯形0.090.090.080.060.110.110.060.070.08---0.08
普通断面0.190.220.210.210.290.160.210.260.180.270.230.210.20
1 程健,张钦礼,薛希龙,等.基于AHP和TOPSIS法的采场结构参数优化研究[J].矿冶工程,2014,34(1):1-5.
Cheng Jian,Zhang Qinli,Xue Xilong,et al.Optimization of stope structure parameters based on AHP and TOPSIS method[J].Mining and Metallurgical Engineering,2014,34(1):1-5.
2 孙辉,王在泉,张黎明.六边形进路开采稳定性影响因素分析[J].矿业研究与开发,2015,35(12):13-16.
Sun Hui,Wang Zaiquan,Zhang Liming. Analysis of influence factors on stability under hexagonal stope mining[J]. Mining Research and Development,2015,35(12):13-16.
3 方传峰,王晋淼,李剡兵.基于PFC2D-DFN的自然崩落法数值模拟研究[J].黄金科学技术,2019,27(2):189-198.
Fang Chuanfeng,Wang Jinmiao,Li Shanbing. Numerical simulation research of natural caving method based on PFC2D-DFN[J].Gold Science and Technology,2019,27(2):189-198.
4 刘新强.莱新铁矿六边形采场结构的可行性分析[J].辽宁工程技术大学学报(自然科学版),2010,29(1):28-31.
Liu Xinqiang. Analysis on stability of hexagonal mining room in Laixin ore mine[J].Journal of Liaoning Technical University(Natural Science),2010,29(1):28-31.
5 严体.龙首矿下向进路式充填法采场结构参数研究[D].昆明:昆明理工大学,2006.
Yan Ti.Study on Stope Structural Parameters of Downward Entry Filling Method in Longshou Mine[D].Kunming:Kunming University of Science and Technology,2006.
6 乔登攀,严体,陈俊智.龙首矿下向分层充填采矿法六角形进路规格优化[J].云南冶金,2007(1):10-14,27.
Qiao Dengpan,Yan Ti,Chen Junzhi.Stope construction parameters optimization of underhand cutting and filling method in hexagon stope in Longshou mine[J].Yunnan Metallurgy,2007(1):10-14,27.
7 程海勇,乔登攀.金川龙首矿充填采矿与地表沉降规律探讨[J].金属矿山,2012,41(11):32-35.
Cheng Haiyong,Qiao Dengpan.Discussion on filling mining of Longshou mine in Jinchuan and the laws of surface subsidence[J]. Metal Mine,2012,41(11):32-35.
8 韩冰. 提高龙首矿下向六角形进路式采矿爆破效率研究[D]. 昆明:昆明理工大学,2010.
Han Bing.Test and Study on Increasing the Blasting Effiency of Underhand Cutting and Filling Method in Hexagon Stope in Longshou Mine[D].Kunming:Kunming University of Science and Technology,2010.
9 王永定.六角形采矿方法进路断面参数优化[C]//中国矿业科技文汇.北京:冶金工业出版社,2014:160-161.
Wang Yongding.Parameter optimization of hexagonal mining approach section [C]//China Mining Science and Technology Collection.Beijing:Metallurgical Industry Press,2014:160-161.
10 李国平.下沟矿二次动压巷道高预应力支护技术研究[D].西安:西安科技大学,2015.
Li Guoping.Research on Two Dynamic Pressure Roadway High Prestrssed Supporting Technology of Xiagou Mine[D]. Xi’an :Xi’an University of Science and Technology,2015.
11 邬金,李元辉,司呈斌,等.深埋厚大矿体采场结构参数优化[J].金属矿山,2014,32(11):11-15.
Wu Jin,Li Yuanhui,Si Chengbin,et al.Optimization of structure parameters in deep & large-sized orebody[J]. Metal Mine,2014,32(11):11-15.
12 周科平,朱和玲,高峰.采矿环境再造地下人工结构稳定性综合方法研究与应用[J].岩石力学与工程学报,2012,31(7):1429-1436.
Zhou Keping,Zhu Heling,Gao Feng. Research on stability of reconstructed underground artificial structure in mining environment by comprehensive method and application[J].Chinese Journal of Rock Mechanics and Engineering,2012,31(7):1429-1436.
13 朱青凌,尚振华.基于有限差分的某铁矿采场稳定性研究[J].矿业研究与开发,2018,38(11):35-39.
Zhu Qingling,Shang Zhenhua.Study on stope stability of an iron mine based on finite difference program[J]. Mining Research and Development,2018,38(11):35-39.
14 田敏,胡崴.基于FLAC3D的某铁矿采场结构参数优选[J].现代矿业,2018,34(2):69-70,73.
Tian Min,Hu Wei.Optimum selection of stope structural parameters of an iron mine based on FLAC3D[J].Modern Mining,2018,34(2):69-70,73.
15 缪国卫,程文文,刘冬生,等.基于FLAC3D的井下采场结构参数优化研究[J].黄金,2015,36(3):29-36.
Miao Guowei,Cheng Wenwen,Liu Dongsheng,et al. Research on the optimization of underground structure parameters by FLAC3D[J]. Gold,2015,36(3):29-36.
16 黄鹏.煤岩蠕变损伤机理及工作面临空区段煤柱稳定性研究[D].徐州:中国矿业大学,2018.
Huang Peng.Study on the Creep Damage Mechanism of Coal Petrography and Gob-side Coal Pillar Stability[D]. Xuzhou:China University of Mining and Technology,2018.
17 王磊.固体密实充填开采岩层移动机理及变形预测研究[D].徐州:中国矿业大学,2012.
Wang Lei.Study on Strata Movement Mechanism and Deformation Prediction of Coal Mining with Solid Waste Compacted Filling[D].Xuzhou:China University of Mining and Technology,2012.
18 刘宝琛,颜荣贵.破裂岩石力学模型探讨[J].岩土工程学报,1981,3(4):81-92.
Liu Baochen,Yan Ronggui.Mechanical models of fractured rock[J]. Chinese Journal of Geotechnical Engineering,1981,3(4):81-92.
19 闫永富,杜文秀.巴润矿山特殊形状爆区爆破设计优化[J].包钢科技,2019,45(1):12-15.
Yan Yongfu,Du Wenxiu.Optimization of blasting design for special-shaped blast area of Barun mine[J]. Science and Technology of Baotou Steel,2019,45(1):12-15.
20 师百垒,戴俊,武宇,等.隧道无掏槽齐发崩落爆破应用研究[J].公路,2016,61(11):261-265.
Shi Bailei,Dai Jun,Wu Yu,et al. Research on application of non-undercutting simultaneous break blasting for tunneling[J]. Highway,2016,61(11):261-265.
[1] Long TIAN, Zhiyong ZHOU, Jianhong CHEN. Numerical Simulation of Temperature Distribution in Mining Area of High Temperature Mine with Auxiliary Ventilation [J]. Gold Science and Technology, 2020, 28(1): 61-69.
[2] Yuan GAO,Qingfa CHEN,Tenglong JIANG. Research on Three-Dimensional Numerical Model Construction Method and Cemented Filling Treatment of Complex Cavities in Daxin Manganese Mine [J]. Gold Science and Technology, 2019, 27(6): 851-861.
[3] Jun TIAN, Jianpo LIU, Yong YANG, Changyin ZHANG. Study on the Failure Law of Backfill Induced by Blasting Disturbance During Cut and Fill Mining Process [J]. Gold Science and Technology, 2019, 27(5): 687-695.
[4] Enxiang SONG, Qiang LI, Jing ZHANG, Kang PENG. Research and Application of Artificial False Bottom in Mining of Orebody in Alteration Zone [J]. Gold Science and Technology, 2019, 27(5): 722-730.
[5] Shijiao YANG,Zhihui WANG. Numerical Simulation on Stability of Shallow-buried Goaf Group with Overlying Highway [J]. Gold Science and Technology, 2019, 27(4): 505-512.
[6] Qiyue LI,Xinhao ZHAO,Xin’ao WEI,Jing ZHENG,Jianqiu ZHANG. Study and Application of Contour Control Blasting Technology for Large Section Tunnel [J]. Gold Science and Technology, 2019, 27(3): 350-357.
[7] Rui LIANG,Ruili YU,Wenhai ZHOU,Xiaobin HUANG,Jianyong WANG,Zhengyu XIONG. Application of Air Interval Charge Blasting Model in Mining Room [J]. Gold Science and Technology, 2019, 27(3): 358-367.
[8] Shikang QIN,Qingfa CHEN,Tingchang YIN. Connotation Differences and Research Progress of the Freeze-Thaw Damages of Rock and Rock Mass [J]. Gold Science and Technology, 2019, 27(3): 385-397.
[9] Feng LIU,Zhaokun WANG,Fengshan MA,Bo WANG,Jianbo WANG,Chunlei DONG. Current Situation and Prospect of Destressing Techniques in Deep Mine [J]. Gold Science and Technology, 2019, 27(3): 425-432.
[10] Chun WANG,Cheng WANG,Zuqiang XIONG,Luping CHENG,Huaibin WANG. Deformation Characteristics of the Surrounding Rock in Deep Mining Roadway Under Dynamic Disturbance [J]. Gold Science and Technology, 2019, 27(2): 232-240.
[11] Chuanfeng FANG,Jinmiao WANG,Shanbing LI,Mingtao JIA. Numerical Simulation Research of Natural Caving Method Based on PFC2D-DFN [J]. Gold Science and Technology, 2019, 27(2): 189-198.
[12] Nao LV,Haibo WANG. Numerical Simulation of Collapse Disaster Before and After Weakening of Thick and Hard Roof [J]. Gold Science and Technology, 2019, 27(2): 257-264.
[13] Conglu WANG,Tong LI. Analysis of Influence of Deep Mine’s Linear Heat Source on Effective Ventilation Based on Ventsim Software [J]. Gold Science and Technology, 2019, 27(2): 271-277.
[14] Xiang LI,Zhen HUAI,Xibing LI,Zhuoyao ZHANG. Study on Fracture Characteristics and Mechanical Properties of Brittle Rock Based on Crack Propagation Model [J]. Gold Science and Technology, 2019, 27(1): 41-51.
[15] Chong CHEN,Xibing LI,Fan FENG. Numerical Study on Damage Zones of the Induced Roadway Surrounding Rock [J]. Gold Science and Technology, 2018, 26(6): 771-779.
Viewed
Full text


Abstract

Cited

  Shared   
  Discussed   
[1] YAN Jie, QIN Ze-Li, XIE Wen-Bing, CA Bang-Yong. [J]. J4, 2010, 18(4): 22 -26 .
[2] SONG He-Min, FENG Chi-Li, DING Xian-Hua. Geological-Geochemical Charicteristics and Prospecting Direction of Jiaojiekou Mining Area, North Part of Taihang Mountain[J]. J4, 2010, 18(3): 54 -58 .
[3] LI Chu-Fang, XU Yong-An, CHAO Yin-Yin, WANG Mei-Juan, ZHANG Dai, LIU Jun, SUN Liang-Liang. Looking for Strata Bound Type Gold Deposit in Liaodong Metallogenic Belt[J]. J4, 2010, 18(3): 59 -62 .
[4] HU Qin-Xia, LI Jian-Zhong, YU Guang-Meng, XIE Yan-Fang, ZHANG Ku-Xiao. Discussion on Gold Ore Point of Bailongjiang Metallogenic Belt[J]. J4, 2010, 18(3): 51 -53 .
[5] CHEN Hua-Dun. [J]. J4, 2010, 18(4): 50 -53 .
[6] YANG Meng-Rong, MAO Chang-Xian. Uncertainty Evaluation of Arsenic and Antimony in Chemical Prospecting Sa-mple by Atomic Fluorescence Spectrometry[J]. J4, 2010, 18(3): 68 -71 .
[7] SU Jian-Hua, LIU Shu-Lin. Study of Gold Extraction from Tail Solution with High Acid Content and Low Concentration[J]. J4, 2010, 18(3): 72 -75 .
[8] WANG Da-Beng, SONG Bing-Jian, HUI Ku-Meng. The Application of High Power IP Method for Searching Concealed Metallic Mine in Beishuiquan,Liaoning Province[J]. J4, 2010, 18(3): 76 -78 .
[9] LIU Qing-Guang, GAO Hai-Feng, HUANG Suo-Yang. The Application of PDA in Geology Department of Jiaojia Gold Mine[J]. J4, 2010, 18(3): 79 -82 .
[10] HUANG Jun, WU Jiafu, LU RuKuai , XIA Liyuan. [J]. J4, 2010, 18(4): 1 -5 .