img

Wechat

Adv. Search

Gold Science and Technology ›› 2019, Vol. 27 ›› Issue (4): 621-628.doi: 10.11872/j.issn.1005-2518.2019.04.621

• Mining Technology and Mine Management • Previous Articles     Next Articles

Digital and Fine Management Practice of Open-pit Mining and Stripping Construction

Bingbing ZHANG1(),Hong YU2,Zhonglei ZHANG3,Zhanjun LI1,Xiaorong CUI1()   

  1. 1. Hongda Blasting Co. ,Ltd. ,Guangzhou 510623,Guangdong,China
    2. Guangdong Province Dabaoshan Mining Co. ,Ltd. ,Shaoguan 512000,Guangdong,China
    3. Darch Construction Group Co. ,Ltd. ,Zhoushan 316021,Zhejiang,China
  • Received:2019-06-21 Revised:2019-07-18 Online:2019-08-31 Published:2019-08-19
  • Contact: Xiaorong CUI E-mail:15252017425@163.com;smile66_cui@163.com

Abstract:

Dabaoshan polymetallic mine has a complex environment and high requirements for ore blending.Underground mining was used early.In the later stage,in order to improve mining efficiency and reduce safety hazards,open-pit mining was used.However,this led to the legacy of more untreated mined areas,and bring a big challenge to production work.Hongda Blasting Co.,Ltd. takes the Dabaoshan Project Department as its pilot unit and fully considers its role as a mine construction enterprise in the construction of digital mines.From the perspective of practicability and investment costs,digital mines suitable for mining construction enterprises was conducted.Based on the application of various advanced mining software,adhered to the actual needs of mine construction,the UAV aerial survey,DIMINE software and truck dispatching system were used as technical support,from the data acquisition,processing and application of open-pit mine,a digital mine construction framework that could be applied in various construction management stages was constructed.Firstly,the detailed terrain and 3D models of topography were obtained by the UAV aerial survey technology.The production status and the distribution of hazard sources were clearly understood,and the macroscopic survey of open-pit mine was realized.Then DIMINE software was used in the whole life cycle of open-pit mine for production planning,daily technical submission,engineering quantity settlement and blasting automation design,which realized the three-dimensional production planning and design of mines,ensuring the scientific exploitation of resources and reduced the depletion and loss of ore.At the same time,the truck dispatching system was used to carry out the mining and real-time dispatching management,which ensured the orderly mining construction and the effective execution of the mining instructions,so as to avoid the enforced idleness due to poor organization of work.The combination of UAV aerial survey,DIMINE software and truck dispatching system has realized the organic unification of mine status investigation,safety hazard identification,production planning and design,scientific mining,real-time supervision,etc.,ensuring safe production of the Dabaoshan open-pit mine.Practice showed that compared with traditional mine construction enterprises,Hongda’s digital mine pilot work has better realized mine integrated design and integration services in mining planning and design,construction and dispatching,and on-site supervision,which has significantly improved the refined construction the management level,it could provide a certain reference for the construction of digital mines in mining construction enterprises.

Key words: mining construction enterprise, digital mine, UAV aerial survey technology, DIMINE software, truck dispatching system, fine construction

CLC Number: 

  • TD67

Fig.1

Construction framework of digital mining"

Fig.2

Aerial survey route"

Fig.3

Aerial survey achievements"

Fig.4

Production planning and design"

Fig.5

Blasting design of goaf"

Fig.6

Real-time dispatch command"

1 古德生,周科平 .现代金属矿业的发展主题[J].金属矿山,2012,41(7):1-8.
Gu Desheng , Zhou Keping .Development theme of the modern metal mining[J].Metal Mine,2012,41(7):1-8.
2 章林 .我国金属矿山露天采矿技术进展及发展趋势[J].金属矿山,2016,45(7):20-25.
Zhang Lin .Technical progress and development trend of open pit mining in metal mines of China[J].Metal Mine,2016,45(7):20-25.
3 王金华,汪有刚,傅俊皓 .数字矿山关键技术研究与示范[J].煤炭学报,2016,41(6):1323-1331.
Wang Jinhua , Wang Yougang , Fu Junhao .Crucial technology research and demonstration of digital mines[J].Journal of China Coal Society,2016,41(6):1323-1331.
4 姜昭晖 .有色矿山数字化建设探析[J].黄金,2018,39(3):1-3.
Jiang Zhaohui .Exploratory research on the digital construction of nonferrous metal mines[J].Gold,2018,39(3):1-3.
5 施富强 .矿山数字化建设战略与战术研究[J].爆破,2013,30(2):37-40.
Shi Fuqiang .Research on strategy and tactics of construction of mine digitization[J].Blasting,2013,30(2):37-40.
6 王李管,陈鑫 .数字矿山技术进展[J].中国有色金属学报,2016,26(8):1693-1710.
Wang Liguan , Chen Xin .Advancing technologies for digital mine[J].The Chinese Journal of Nonferrous Metals,2016,26(8):1693-1710.
7 肖雅静,孟国营 .梧桐庄矿数字化矿山工程建设与创新[J].煤炭科学技术,2016,44(7):129-134.
Xiao Yajing , Meng Guoying .Construction and innovation on digitalized mine engineering of Wutongzhuang mine[J].Coal Science and Technology,2016,44(7):129-134.
8 孙徐培 .神华新街能源公司数字化矿区建设[D].呼和浩特:内蒙古大学,2014.
Sun Xupei .Construction of Digital Mining Area of Shenhua New Street Energy Company[D].Hohhot: Inner Mongolia University,2014.
9 边博,王常海,赵华 .数字化矿山平台在太平煤矿的应用[J].煤炭技术,2012,31(4):125-126.
Bian Bo , Wang Changhui , Zhao Hua .Application of digital mine platform in Taiping coal mine[J].Coal Technology,2012,31(4):125-126.
10 郑志琴,郭忠林 .承包开采模式下矿山安全管理存在的问题及对策[J].采矿技术,2008,8(4):99-102.
Zheng Zhiqin , Guo Zhonglin .Problems and countermeasures of mine safety management under contracted mining mode[J].Mining Technology,2008,8(4):99-102.
11 任星 .露天矿山开采总承包模式与应用的安全问题[D].绵阳:西南科技大学,2016.
Ren Xing .Open-pit Mining General Contracting Mode and Application Security Problems[D].Mianyang:Southwest University of Science and Technology,2016.
12 宫明山,陈荣健 .浅谈露天矿山采矿整体承包模式管理经验[J].矿业工程,2015,13(5):1-3.
Gong Mingshan , Chen Rongjian .Discussion on production management experience of open-pit mining in overall outsourcing mode[J].Mining Engineering,2015,13(5):1-3.
13 连民杰 .创新矿山管理模式促进矿山可持续发展[J].采矿技术,2010,10(3):129-131.
Lian Minjie .Innovative mine management mode promotes sustainable development of mines[J].Mining Technology,2010,10(3):129-131.
14 李长青,曹明兰,李亚东,等 .低空无人机航测露天矿三维重构方法与试验[J].测绘通报,2018(3):89-92.
Li Changqing , Cao Minglan , Li Yadong ,et al .3D reconstruction method and experiment of aerial survey of low-altitude UAV for open-pit mine[J].Bulletin of Surveying and Mapping,2018(3):89-92.
15 隋涛,肖武,王党朝,等 .基于无人机摄影测量的露天矿排土场三维模型构建[J].金属矿山,2018,47(5):135-142.
Sui Tao, Xiao Wu , Wang Dangchao ,et al .Establishment of the 3D model of open-pit mine dump based on UAV photogrammetry[J].Metal Mine,2018,47(5):135-142.
16 蒋京名,王李管 .DIMINE矿业软件推动我国数字化矿山发展[J].中国矿业,2009,18(10):90-92.
Jiang Jingming , Wang Liguan .DIMINE mining software promote the development of China’s digital mine[J].China Mining Magazine,2009,18(10):90-92.
17 肖英才,王李管,朱明海,等 .基于DIMINE软件的爆破设计[J].现代矿业,2011,27(1):26-29.
Xiao Yingcai , Wang Liguan , Zhu Minghai ,et al .Blasting design based on DIMINE software[J].Modern Mining,2011,27(1):26-29.
18 王洋,赵明生 .基于Dmine的数字化矿山生产配矿研究[J].金属矿山,2013,42(8):101-103.
Wang Yang , Zhao Mingsheng .Research of production and ore-matching in digital mine based on Dmine[J].Metal Mine,2013,42(8):101-103.
19 杨志勇 .抚顺西露天矿 GPS 卡车调度系统技术改造[J].露天采矿技术,2017,32(5):65-67.
Yang Zhiyong .Technical innovation of GPS truck dispatching system in Fushun West open-pit mine[J].Opencast Mining Technology,2017,32(5):65-67.
20 柴森霖,白润才,刘光伟,等 .基于改进遗传算法的露天矿运输路径优化[J].重庆大学学报(自然科学版),2018,41(2):87-95.
Chai Senlin , Bai Runcai , Liu Guangwei ,et al .Open-pit path optimization based on improved genetic algorithm[J].Journal of Chongqing University(Natural Science Edition),2018,41(2):87-95.
21 宫春刚 .基于GPS的卡车调度计量系统研究[J].露天采矿技术,2017,32(11):64-67.
Gong Chungang .Study on the measurement system of truck dispatching based on GPS[J].Opencast Mining Technology,2017,32(11):64-67.
[1] YIN Kaizhou,YANG Zhaolin,XU Bin. Management System Innovation for 3D Mining Software Popularization and Application in Mining Enterprises in China [J]. Gold Science and Technology, 2018, 26(1): 98-104.
[2] WEI Kailin,WANG Zhenjun,BAN Junkui,WANG Yuankui,YANG Hong,WU Zhiming. The Application of Surpac Software in Sanshandao Gold Mine [J]. J4, 2011, 19(5): 72-75.
[3] BAI Bi-Xin, WANG Shan-Gong, AN Zhi-Hai. Research and Application of Underground Mining Exploiting 3D Visualization System in Xinhui Gold Mine [J]. J4, 2011, 19(1): 55-57.
Viewed
Full text


Abstract

Cited

  Shared   
  Discussed   
[1] YANG Meng-Rong, MAO Chang-Xian. Uncertainty Evaluation of Arsenic and Antimony in Chemical Prospecting Sa-mple by Atomic Fluorescence Spectrometry[J]. J4, 2010, 18(3): 68 -71 .
[2] LI Bin, JU Hai-Xiang, YANG Mu, DU Gao-Feng, HUI Ji-Kang, WANG Tian-Guo. [J]. J4, 2010, 18(4): 17 -21 .
[3] LU Meng-Fu, HU Shou-Quan. [J]. J4, 2010, 18(4): 62 -64 .
[4] LIU Yu-Meng, LIU Nan, ZHANG Jie, SONG Yu-Bei, GONG Long-Ji, WANG Gang, LIU Xiao, ZHANG Hai-Fang. Study on Structure Characteristics and Ore-prospecting Direction of Yinggezhuang Gold Deposit[J]. J4, 2010, 18(6): 26 -29 .
[5] GENG A-Jiao, DUAN Jian-Hua. Analysis on the Ore-controlling Factors and Prospecting of Manzhanggang Gold Mine[J]. J4, 2010, 18(6): 34 -37 .
[6] ZHANG Yan, SHANG Qian. Research Progress of Gold Deposits of Ductile Shear Zone——Taking Ailaoshan Gold Zone as an Example[J]. J4, 2011, 19(1): 11 -15 .
[7] CHEN Li-Zi, CAO Dong-Hong, YANG De-Mei. Element Geochemical Characteristics of Guloushan Ore Section in Jinlongshan Gold Mine,Shaanxi Province[J]. J4, 2011, 19(1): 28 -33 .
[8] LU Yang-Chuan, LI Wei, FAN Dun-Jie, LIU Gang, CHAO Yin-Yin, ZHANG Dai. Recognition of Piedmont Potassic Zone in the Hadamengou Gold Deposit,In-ner Mongolia[J]. J4, 2011, 19(1): 42 -44 .
[9] LU Ren-Jiang, LIU Feng-Jin, LOU Wei-Hua-. Technology Innovation and Application on High Water Consolidation of Fill Mining Method[J]. J4, 2011, 19(1): 51 -54 .
[10] HUANG J ianjun, XIAO Wenjin, GAO Junhui. The Gold Deposit Metallogeny Character istics and Foreca st in Ea stern Area of North China[J]. J4, 2008, 16(1): 19 -23 .