img

Wechat

Adv. Search

Gold Science and Technology ›› 2016, Vol. 24 ›› Issue (5): 1-6.doi: 10.11872/j.issn.1005-2518.2016.05.001

    Next Articles

Synthetic Judgement for Filling Scheme Optimization Based on AHP and TPOSIS Methods

WANG Xinmin,FAN Biao,ZHANG Deming,LI Shuai   

  1. School of Resources and Safety Engineering,Central South University,Changsha    410083,Hunan,China
  • Received:2016-05-05 Revised:2016-06-12 Online:2016-10-28 Published:2016-12-27
  • Supported by:

    中南大学“创新驱动计划”项目“智能化清洁化现代矿业工程理论与技术”(编号:2015CX005)资助

Abstract:

In order to make a synthetic assessment about filling schemes optimization,the synthetic assessment index system of filling scheme was established according to the analytic hierarchy process(AHP) and TOPSIS methods.Based on the four filling schemes optimization in a metal mine,considering the economic,technical,security and etc,which influenced the evaluation indexes(filling difficulty level,roof-contacted filling level,settlement of filling body,strength of filling body,etc) of filling schemes,the influence factor indexes of the filling schemes were transformed into multi-factor decision matrix;the weight of the influence factors matrix were gotten according to the AHP method,and then,the AHP-TOPSIS multi-factor decision model was established with the fundamental theory of TOPSIS,and the synthetic superior degree of the four filling schemes were obtained.The research results show that the synthetic superior degree of filling schemes are 36.2%,85.2%,57.6%,32.0%,respectively,according to the method,and thus determine the second scheme(consolidated filling method) is the optimal one.The optimization scheme is consistent with an actual mining,filling effect is good.Practical application shows that the decision model provides a new method to the filling schemes optimization.

Key words: filling schemes, analytic hierarchy process, TOPSIS methods, comprehensive evaluation system model, evaluation indexes

CLC Number: 

  • TD853

[1] 王新民,古德生,张钦礼.深井矿山充填理论与管道输送技术[M].长沙:中南大学出版社,2010:1-6.
[2] 杨波,杨任教,王富林.基于ANSYS/FLOTRAN的高浓度全尾砂胶结充填管道输送数值模拟研究[J].黄金科学技术,2015,23(15):60-65.
[3] 许家林,轩大洋,朱卫兵.充填采煤技术现状与展望[J].采矿技术,2011,11(3):24-30.
[4] 牟振山,刘学胜,李和平,等.注浆胶结矿柱充填工艺在河西金矿的研究[J].黄金科学技术,2006,14(3):23-25.
[5] 王新民,赵建文,张钦礼.露天转地下最佳开采模式[J].中南大学学报(自然科学版),2012,43(4):1435-1439.
[6] 王新民,秦健春,张钦礼.基于AHP-TOPSIS评判模型的姑山驻留矿采矿方法优选[J].中南大学学报(自然科学版),2013,44(3):1132-1137.
[7] 王新民,赵彬,张钦礼.基于层次分析法和模糊数学的采矿方法选择[J].中南大学学报(自然科学版),2008,39(5):875-880.
[8] 谷新建,柴红保.应用突变评价理论选择采矿方法[J].中国安全科学学报,2004,7(7):13-15.
[9] 赵彬,王新民,史良贵,等.基于BP神经网络的爆破参数优选[J].矿冶工程,2009,29(4):24-27.
[10] 陈婷婷,宋永发.基于AHP-TOPSIS的地铁车站施工方案比选[J].工程管理学报,2012,26(5):33-36.
[11] 龚剑,胡乃联,崔翔.基于AHP-TOPSIS评判模型的岩爆倾向性预测[J].岩石力学与工程学报,2012,33(7):1443-1448.
[12] Dagdeviren M,Yavuz S,Kilinc N.Weapon selection using the AHP and TOPSIS methods under fuzzy environment[J].Expert Systems with Application,2009,36(4):143-8151.
[13] 杨皓翔,梁川,侯小波.改进的TOPSIS模型在地下水水质评价中的应用[J].南水北调与水利科技,2012,10(5):51-55.
[14] 王新民,李洁慧,张钦礼.基于FAHP的采场结构参数优化研究[J].中国矿业大学学报,2010,39(2):163-168.
[15] 黄贯虹,方刚.系统工程方法与应用[M].广州:暨南大学出版社,2005:45-48.
[16] 于秀金,张皓斐.一种将AHF和TOPSIS融合的决策方法[J].电脑信息与技术,2010,18(6):28-31.
[17] 许玖平,吴巍.多属性决策的理论与方法[M].北京:清华大学出版社,2006.
[18] 谢本贤,陈沅江,史秀志.深部岩体工程围岩质量评价的IRMR法研究[J].中南大学学报(自然科学版),2007,38(5):987-992.
[19] 张钦礼,肖崇春,陈秋松,等.某矿山最佳充填站站址方案选择[J].科技导报,2013,31(19):39-44.

[1] Aoqi FAN, Wanlu WANG, Shujian LI, Bin ZHANG, Yinghui LIU, Hao WU. Evaluation of Rock Mass Quality of Phosphorite Mines by Topology Based on Optimal Combination Weight [J]. Gold Science and Technology, 2024, 32(1): 132-143.
[2] Longxin DENG, Jianhong CHEN. Optimization of Mining Method with Subjective and Objective Combination Weight TOPSIS Based on Game Theory [J]. Gold Science and Technology, 2022, 30(2): 282-290.
[3] Lipeng WANG,Fang YAN,Zijun LI,Fang WANG. Dynamic Status Evaluation of Main Fans of Mine at High Altitude Region [J]. Gold Science and Technology, 2020, 28(6): 930-939.
[4] Meng WANG, Xiuzhi SHI, Shu ZHANG. Evaluation Research on Safety Guarantee Conditions of Underground Metal Mines Oriented to Optimizing Production Capacity [J]. Gold Science and Technology, 2020, 28(5): 753-760.
[5] Chaomin CHEN,Chengbiao LENG,Guohui SI. Comprehensive Metallogenic Prediction Based on GIS and Analytic Hierarchy Process:A Case Study of Kumishi Region in Xinjiang [J]. Gold Science and Technology, 2020, 28(2): 213-227.
[6] Shi WANG,Yong SHI,Wanyin WANG. Comprehensive Safety Evaluation of Tailings Reservoir Based on Fuzzy Multivariate Contact Model [J]. Gold Science and Technology, 2019, 27(6): 903-911.
[7] Ning MA,Nailian HU,Guoqing LI,Duiming GUO,Jie HOU. Evaluation of Human-Machine Effectiveness of Plateau Mine Based on Fuzzy Analytic Hierarchy Process [J]. Gold Science and Technology, 2019, 27(6): 871-878.
[8] LU Furan, CHEN Jianhong. Rockburst Prediction Method Based on AHP and Entropy Weight TOPSIS Model [J]. Gold Science and Technology, 2018, 26(3): 365-371.
[9] DENG Gao,WANG Ximei,YANG Shan. Study of Energy Saving and Environmental Protection Strategy for Iron and Steel Enterprise Based on SWOT- FAHP [J]. Gold Science and Technology, 2017, 25(6): 99-107.
[10] CHEN Yi,CHEN Jianhong. Mining Method Optimization Based on Game Theory and Relative Entropy TOPSIS [J]. Gold Science and Technology, 2017, 25(6): 75-82.
[11] YIN Tubing,WANG Pin,ZHANG Minglu. Analysis and Evaluation of Safety in Underground Metal Mine based on AHP and Fuzzy Evaluation Method [J]. Gold Science and Technology, 2015, 23(3): 60-66.
[12] WAN Xiaoheng,WANG Xinmin,ZHU Yangya,JIANG Zhiliang,CHEN Qiusong. Optimization of the Stope Structural Parameters Based on Empowerment Combination TOPSIS [J]. Gold Science and Technology, 2014, 22(5): 69-73.
Viewed
Full text


Abstract

Cited

  Shared   
  Discussed   
No Suggested Reading articles found!