img

Wechat

Adv. Search

Gold Science and Technology ›› 2016, Vol. 24 ›› Issue (2): 76-82.doi: 10.11872/j.issn.1005-2518.2016.02.076

Previous Articles     Next Articles

Research on Instability Control of Horizontal Pillar Roof in Granular Medium

WANG Xiaojun,DENG Shuqiang,LI Yongxin,ZHUO Yulong,FENG Xiao   

  1. School of Resources and Environment Engineering,Jiangxi University of Science and Technology,Ganzhou    341000,Jiangxi,China
  • Received:2015-07-13 Revised:2015-10-20 Online:2016-04-28 Published:2016-05-30

Abstract:

The key factors which influence stability of access road roof in access back-filling of horizontal pillar in loose medium are coping thickness and roof-contacted area.In order to solve these security risks and achieve the maximum amount of ore recovery,the deformation characteristics and failure mode of backfill roof have been studied by similar material simulation of three methods roof structure of pile groups,sole beam and arch beam based on -240 m horizonal pillar in Fenghuangshan mine.The result indicates that sole beam has the maximum critical roof safety thickness and arch beam has the minimum one,instability of sole beam and pile groups is caused by snipping subsidence from both sides and instability of arch beam is caused by folded damage in the middle.Stability of roof of access road can be improved by effective instability control technique,roof instability usually happens during accelerating creep stage,pile-arch beam structure is put forward as an effective instability control technique.

Key words: horizonal pillar, instability control technique, roof structure, instability mode, similar model, horizonal pillar, instability control technique, roof structure, instability mode, similar model

CLC Number: 

  • TD853

[1] 马崇武,慕青松,徐有基,等.金川二矿区1 150 m中段水平矿柱的屈服破坏过程[J].岩土工程学报,2008,30(3):361-365.
[2] 马崇武,慕青松.金川二矿区垂直矿柱的屈服破坏过程[J].岩土工程学报,2013,35(增):459-463.
[3] 戴兴国,方鑫,陈增剑,等.良山铁矿全尾砂胶结充填参数的合理选择[J].黄金科学技术,2015,23(1):74-79.
[4] 韩斌,吴爱祥,王贻明,等.低强度粗骨料超细全尾砂自流胶结充填配合比优化及应用[J].中南大学学报(自然科学版),2012,43(6):2357-2362.
[5] 王新民,胡一波,王石,等.超细全尾砂充填配比优化正交试验研究[J].黄金科学技术,2015,23(3):45-49.
[6] 韩斌,王贤来,肖卫国.基于多元非线性回归的井下采场充填体强度预测及评价[J].采矿与安全工程学报,    2012,29(5):714-718.
[7] 赵传卿,胡乃联.胶结充填对采场稳定性的影响[J].辽宁工程技术大学学报(自然科学版),2008,27(1):13-16.
[8] 路仁江,刘鹏金,娄伟华.高水固结充填采矿法工艺创新与应用[J].黄金科学技术,2011,19(1):51-54.
[9] 杨纪光.下向进路假底胶结充填采矿法在焦家金矿的应       用[J].黄金科学技术,2011,19(5):33-36.
[10] 王晓军,冯萧,赵奎,等.多因素组合影响阶段矿柱上采顶板临界厚度研究[J].岩土力学,2013,34(12):3505-3512.
[11] 唐治,潘一山,朱小景,等.直墙拱形巷道围岩应力场分析[J].土木建筑与环境工程,2015,37(3):79-85.
[12] 康红普,吴建星.锚杆托板的力学性能与支护效果分析[J].煤炭学报,2012,37(1):8-16.
[13] 赵奎,王晓军,刘洪兴,等.布筋尾砂胶结充填体顶板力学性状试验研究[J].岩土力学,2011,32(1):9-14.
[14] 安龙,徐帅,李元辉,等.基于多方法联合的崩落法崩矿步距优化[J].岩石力学与工程学报,2013,32(4):754-759.
[15] 王进学,王家臣,董卫军,等.矿体地下连续开采顶板崩落相似模拟试验[J].辽宁工程技术大学学报(自然科学版),2006,25(2):172-175.
[16] 张明建,郜进海,魏世义,等.倾斜岩层平巷围岩破坏特征的相似模拟试验研究[J].岩石力学与工程学报,2010,29(增):3259-3264.
[17] 杨俊杰.相似理论与结构模型实验[M].武汉:武汉理工大学出版社,2005.
[18] 顾大钊.相似材料和相似模型[M].徐州:中国矿业大学出版社,1995.

[1] SHI Caixing, GUO Lijie, LI Wenchen, ZHANG Dan. Study on Filling Cementitious Materials Based on Lead-Zinc Smelting Slag and Its Application [J]. Gold Science and Technology, 2018, 26(2): 160-169.
[2] LIU Dingyi, WANG Liguan, CHEN Xin, ZHONG Deyun, XU Zhiqiang. Study on Multi Objective Optimization and Application of Medium and Long Term Plan for Underground Mine [J]. Gold Science and Technology, 2018, 26(2): 228-233.
[3] LIN Ge, GONG Fengqiang. Research on Evaluation Index of Red Sandstone Instability Under Different Stress [J]. Gold Science and Technology, 2018, 26(2): 195-202.
[4] CAO Shirong,HAN Jianwen,LI Yongxin,WANG Xiaojun,FENG Xiao,ZHUO Yulong. Damage Analysis of Solid Waste Rock Cemented Filling Body Based on Acoustic Emission Probability Density Function [J]. Gold Science and Technology, 2017, 25(6): 92-98.
[5] DING Jianfeng. Research on the Ore Bunker Treatment of a Gold Mine [J]. Gold Science and Technology, 2017, 25(4): 52-57.
[6] LI Zongnan,GUO Lijie,YU Bin,SHI Caixing. Shearing Thinning Behavior of High Concentration Slurry Based on Bingham Model [J]. Gold Science and Technology, 2017, 25(4): 33-38.
[7] BAI Zhaoyang,WANG Guowei,ZHANG Peng,LIU Shuanping. Research on Pillaring Blasting Location Under Level Gob Group Conditions [J]. Gold Science and Technology, 2017, 25(4): 81-86.
[8] XU Huaihao,LI Jinyou. Application Practice of Increasing Production and Reducing Consumption in Grinding System of Dayingezhuang Gold Mine [J]. Gold Science and Technology, 2017, 25(3): 116-120.
[9] WANG Xinmin,RONG Shuai,ZHAO Maoyang,ZHANG Qinli . Concentration Equipment Optimization Based on Variable Weight Theory and TOPSIS [J]. Gold Science and Technology, 2017, 25(3): 77-83.
[10] LIU Zhixiang,GONG Yongchao,LI Xibing. Study on the Backfilling Material Properties Based on Fractal Theory and BP Neural Network [J]. Gold Science and Technology, 2017, 25(2): 38-44.
[11] HU Jianhua,YANG Chun,ZHOU Bingren,ZHOU Keping,ZHANG Shaoguo. Simulation of Fracture Propagation and Optimization of Parameters for Smooth Blasting of Coping in Roadway [J]. Gold Science and Technology, 2017, 25(2): 45-53.
[12] JIA Mintao,WANG Qunfang,WU Lengjun. Research Status and Prospect of Thermal Environmental Control Technology Under Deep Mining [J]. Gold Science and Technology, 2017, 25(2): 83-88.
[13] XIAO Weijing,CHEN Chen,LI Yongxin,WANG Xiaojun,CAO Shirong,HAN Jianwen. Creep Experiment and Model of Deep Limestone Under Step Loading [J]. Gold Science and Technology, 2017, 25(2): 76-82.
[14] CAO Shirong,HAN Jianwen,XIAO Weijing,ZHUO Yulong,WANG Xiaojun,FENG Xiao. Study on Stress-Strain Relationship of Cemented Backfilling with Different Aggregate Content [J]. Gold Science and Technology, 2017, 25(1): 93-98.
[15] LAN Zhipeng,WANG Xinmin,WANG Hongjiang,CHEN Qiusong. Experiment Research on Slurry Setting Time’s Effect on High-sulphur Backfill’s Compressive Strength [J]. Gold Science and Technology, 2016, 24(5): 13-18.
Viewed
Full text


Abstract

Cited

  Shared   
  Discussed   
No Suggested Reading articles found!