Testing on Medium Length Hole Blasting Technique of Compound Barrel Straight Cutting in Tunnel Excavating

YANG Yuping,HU Dejiong   

  1. School of Resources and Safety Engineering,Central South University,Changsha    410083,Hunan,China
  • Received:2015-07-07 Revised:2015-08-19 Online:2015-12-28 Published:2016-02-25

Abstract:

Due to the problems of low working efficiency,short cyclic footage,and high excavation cost of per meter roadway in traditional roadway excavation techniques such as air leg rock drill machine drilling and short hole blasting used in underground mines,in order to solve a series of mentioned issues,a new tunnel excavation technique,that is,medium length hole blasting technique of compound barrel straight cutting of equal diameter empty hole in tunnel excavating was well proposed in the present work.Meanwhile,corresponding blasting parameters of the technique were designed.Based on the YT-24 air leg rock drill machine drilling,short hole blasting,DF20-2BD drill jumbo drilling and short hole blasting,DF20-2BD drill jumbo drilling and medium length hole blasting,respectively,the field experiments of the specific mine were carried out under the condition of completing the same length (30 m) tunnel excavation.Some of data indicators were produced by three different methods.Namely,drilling and blasting such as drilling time consuming for each meter,drilling and blasting cost of per meter roadway and average cyclic footage were obtained in the experiments.The results showed that the developed technique can not only reduce the drilling and blasting cost,but also improved the average cyclic footage effectively by adopting DF20-2BD drill jumbo drilling and medium length hole blasting technique,which proved to be an efficiency and economical method of tunnel excavation.

Key words: tunnel excavation, medium length hole blasting, compound barrel straight cutting, blasting parameters, average cyclic footage

CLC Number: 

  • TD803

[1]郝飞.坚硬岩石巷道中深孔掘进爆破实践[J].煤炭科学技术,2009,37(9):24-30.
[2]姚建,田冬梅.煤矿岩巷中深孔掘进爆破试验研究[J].华北科技学院学报,2011,8(1):26-29.
[3]江西省冶金设计院有限责任公司.福建省清流县方坑夹矿区萤石矿改扩建初步设计[R].南昌:江西省冶金设计院有限责任公司,2014.
[4]陈士海,魏海霞,薛爱芝.坚硬岩石巷道中深孔掏槽爆破试验研究[J].岩石力学与工程学报,2007,26(增):3498-3502.
[5]林大能.平巷掏槽爆破空孔尺寸效应及围岩频繁震动损伤累积特性研究[D].长沙:中南大学,2006.
[6]戴俊.柱状装药爆破的岩石压碎圈与裂隙圈计算[J].辽宁        工程技术大学学报(自然科学版),2001,20(2):144-147.
[7]Digby P J,Nilsson L,Oldenburg M.Finite element simulation            of time dependent fracture and fragmentation processes in rock blasting[J].International Journal for Numerical and Analytical Methods in Geomechanics,1985,9(4):317-329.
[8]Cho S H,Kaneko K.Rock fragmentation control in blasting[J].Journal of the Japan Institute of Metals,2004,45(5):1722-1730.
[9]李夕兵.凿岩爆破工程[M].长沙:中南大学出版社,2011:160-161.
[10]杨秀敏.爆炸冲击现象数值模拟[M].合肥:中国科学技术大学出版社,2010:113.
[11]李萍.渐进式大直径空孔螺旋掏槽爆破参数的研究[D].武汉:武汉理工大学,2010.
[12]傅菊根,徐颖,郝飞,等.硬岩巷道掘进的中深孔爆破试验研究[J].安徽理工大学学报(自然科学版),2004,24(4):24-27,36.
[13]白忠胜,潘长春,李清,等.中深孔爆破技术在邢东矿大断面岩巷掘进中的应用[J].中国矿业,2010,19(6):79-81.
[14]杨享衢.关于非电毫秒雷管名义延期时间的讨论[J].工程爆破,2003,9(3):58-61.
[15]卢义玉,康勇,夏彬伟.井巷工程设计与施工[M].北京:科学出版社,2010:89-98.