img

Wechat

Adv. Search

Gold Science and Technology ›› 2014, Vol. 22 ›› Issue (5): 69-73.doi: 10.11872/j.issn.1005-2518.2014.05.069

Previous Articles     Next Articles

Optimization of the Stope Structural Parameters Based on Empowerment Combination TOPSIS

WAN Xiaoheng,WANG Xinmin,ZHU Yangya,JIANG Zhiliang,CHEN Qiusong   

  1. School of Resources and Safety Engineering,Central South University,Changsha   410083,Hunan,China
  • Received:2014-06-03 Revised:2014-08-10 Online:2014-10-28 Published:2015-01-22

Abstract:

To solve the problem of the difficulty using numerical analysis method to obtain the optimal stope structure parameters of the weight,we propose a technique for order preference by similarity to ideal solution(TOPSIS) based on combination of empowerment comprehensive evaluation method.Considering influence of stope structure parameters of the three categories of factors,such as economy,technology and safety.We establish the evaluation system of a stope structure parameters by the principle of analytic hierarchy process,determine  combination and weights of each indicator using the entropy weight method and analytic hierarchy process (AHP),and calculate the superior degrees of schemes based on the comprehensive evaluation index,finally,realizing,optimization of stope structure parameters.Taking the example of a mine in Hunan Province,nine schemes,fitting an orthogonal model,were tested,five of the nine schemes were assessed by empowerment combination TOPSIS evaluation model.The synthetic superior degrees of schemes are 40.8%,70.2%,26.8%,52.9% and 4.7% for the second,third,fifth,sixth and eighth ones,respectively,and the third scheme becomes the best.

Key words: stope structural parameters, evaluation index, empowerment combination, analytic hierarchy process(AHP), entropy weigh method(EM), TOPSIS method

CLC Number: 

  • TD85

[1] 董蕾.采动结构参数优化设计及可靠度分析[D].长沙:中南大学, 2010.
[2] 李启月,陈亮,潭勇,等.基于ANSYS的二步采场分段开挖过程模拟及稳定性分析[J].科技导报,2013,31 (22):44-49.
[3] ZHU Shuyun,JIAN Zhenquan,HOU Hongliang,et al.Analytical model and application of stress distribution on  mining coal floor[J].Journal of China University of Mining & Technology,2008,18 (1):13-17.
[4] Saaty T L,Rogers P C,Pell R.Portfolio selection through hierarchies[J].The Journal of Portfolio Management,1980,6(3):16-21.
[5] 李俊芳,吴小萍.基于AHP-FUZZY多层次评判的城市轨道交通线网规划方案综合评价[J].武汉理工大学报,2007,4(2):205-208.
[6] 刘星魁,朱红青,张圣柱,等.基于折衷权重的多层次安全性评价方法研究[J].中国安全生产科学技术,2010,6(5):92-96.
[7] Saaty T L.Fundamentals of Decision Making and Priority Theory with the Analytic Hierarchy Process[M].Pittsburgh,PA:RWS,1994.
[8] 王新民,李洁慧,张钦礼,等.基于FAHP的采场结构参数优化研究[J].中国矿业大学学报,2012,39 (2):163-168.
[9] 谢本贤,陈沅江,史秀志.深部岩体工程围岩质量评价的IRMR法研究[J].中南大学学报:自然科学版,2007,38(5):987-992.
[10] 周科平,翟建波,高峰,等.缓倾斜薄矿体采场伪倾斜布置及参数优化研究[J].广西大学学报:自然科学版,2012,2(37):376-381.

[1] YANG Mingcai, SHENG Jianlong, YE Zuyang, DONG Shu. Analysis of Sensitivity Factors of Open-pit Mine Slope Stability and Impact Based on FlAC3D [J]. Gold Science and Technology, 2018, 26(2): 179-186.
[2] SHI Caixing, GUO Lijie, LI Wenchen, ZHANG Dan. Study on Filling Cementitious Materials Based on Lead-Zinc Smelting Slag and Its Application [J]. Gold Science and Technology, 2018, 26(2): 160-169.
[3] LIU Dingyi, WANG Liguan, CHEN Xin, ZHONG Deyun, XU Zhiqiang. Study on Multi Objective Optimization and Application of Medium and Long Term Plan for Underground Mine [J]. Gold Science and Technology, 2018, 26(2): 228-233.
[4] LIN Ge, GONG Fengqiang. Research on Evaluation Index of Red Sandstone Instability Under Different Stress [J]. Gold Science and Technology, 2018, 26(2): 195-202.
[5] CAO Shirong,HAN Jianwen,LI Yongxin,WANG Xiaojun,FENG Xiao,ZHUO Yulong. Damage Analysis of Solid Waste Rock Cemented Filling Body Based on Acoustic Emission Probability Density Function [J]. Gold Science and Technology, 2017, 25(6): 92-98.
[6] DENG Gao,YANG Shan. Analysis of Mineral Resources Utilization Based on Grey Cluster and Grey Prediction Combined Model [J]. Gold Science and Technology, 2017, 25(5): 85-92.
[7] DING Jianfeng. Research on the Ore Bunker Treatment of a Gold Mine [J]. Gold Science and Technology, 2017, 25(4): 52-57.
[8] LI Zongnan,GUO Lijie,YU Bin,SHI Caixing. Shearing Thinning Behavior of High Concentration Slurry Based on Bingham Model [J]. Gold Science and Technology, 2017, 25(4): 33-38.
[9] BAI Zhaoyang,WANG Guowei,ZHANG Peng,LIU Shuanping. Research on Pillaring Blasting Location Under Level Gob Group Conditions [J]. Gold Science and Technology, 2017, 25(4): 81-86.
[10] XU Huaihao,LI Jinyou. Application Practice of Increasing Production and Reducing Consumption in Grinding System of Dayingezhuang Gold Mine [J]. Gold Science and Technology, 2017, 25(3): 116-120.
[11] WANG Xinmin,RONG Shuai,ZHAO Maoyang,ZHANG Qinli . Concentration Equipment Optimization Based on Variable Weight Theory and TOPSIS [J]. Gold Science and Technology, 2017, 25(3): 77-83.
[12] HU Jianhua,YANG Chun,ZHOU Bingren,ZHOU Keping,ZHANG Shaoguo. Simulation of Fracture Propagation and Optimization of Parameters for Smooth Blasting of Coping in Roadway [J]. Gold Science and Technology, 2017, 25(2): 45-53.
[13] DENG Hongwei,YANG Yiquan,DENG Junren,LIU Chuanju,ZHOU Yanlong. Study on Mining Sequence of Deep Orebody Under High Stress Environment Below Goaf [J]. Gold Science and Technology, 2017, 25(2): 62-69.
[14] JIA Mintao,WANG Qunfang,WU Lengjun. Research Status and Prospect of Thermal Environmental Control Technology Under Deep Mining [J]. Gold Science and Technology, 2017, 25(2): 83-88.
[15] LIU Liansheng,LAN Depei,ZHANG Shenghui,PAN Rongsen,CAI Jiande. Research on Application of Frequency Division Multiple Access Misfire Detection Technology and System in Deep Hole Blasting [J]. Gold Science and Technology, 2017, 25(2): 54-61.
Viewed
Full text


Abstract

Cited

  Shared   
  Discussed   
No Suggested Reading articles found!