蚀变带内矿体开采中人工假底的应用研究 |
| 宋恩祥,李强,张静,彭康 |
|
Research and Application of Artificial False Bottom in Mining of Orebody in Alteration Zone |
| Enxiang SONG,Qiang LI,Jing ZHANG,Kang PENG |
| 图2 薄“板”承受层受力分析图 |
| Fig.2 Force analysis of the thin “plate” bearing layer |
|