Intelligent Optimization Method for Slope Morphology and Stability of Phos-phogypsum Stack Based on LM-LSO Algorithm
Received date: 2024-05-20
Revised date: 2024-07-09
Online published: 2024-09-19
Mining operations and engineering projects frequently produce numerous unstable artificial waste slopes,which pose significant hindrances to human activities.Consequently,the implementation of effective slope morphology optimization is essential for ensuring engineering safety and maximizing landfill capacity.The development of an efficient,accurate,and scientifically robust method for slope morphology optimization holds substantial theoretical and practical importance for the management of unstable artificial slope projects.Consequently,we propose an advanced slope morphology optimization method,termed LM-LSO,which integrates the levenberg-marquardt (LM) algorithm with the light spectrum optimizer (LSO).Initially,stability coefficients for various slope configurations were computed utilizing the limit equilibrium method,with cut and fill volumes estimated based on the differences in two-dimensional profiles,thereby generating the sample data.Subsequently,cross-product terms among variables were incorporated to capture nonlinear relationships,and the LM algorithm was applied for the nonlinear fitting of the sample data.In conclusion,an infeasible solution rejection method was employed to address stability coefficient constraints,optimizing the solution using the LSO algorithm and benchmarking it against four other algorithms.This approach was implemented to optimize the terrace height,width,and slope angle of a gypsum stack slope in Sichuan Province.The objective was to minimize the excavation volume while ensuring adherence to stability regulations.The final optimized design parameters include terrace heights(h) of 6.38 m,step widths(l) of 4 m,step inclinations(α) of 25.11°,and a minimal excavation volume(Vmin) of 298.92 m2.The method comprehensively considers the economic feasibility and stability of slope optimization,ensuring both landfill capacity and safety.
Yaoyi LI , Guoqing CHEN , Minghan SHI , Yuxin ZHOU , Wen NIE , Cheng ZHENG . Intelligent Optimization Method for Slope Morphology and Stability of Phos-phogypsum Stack Based on LM-LSO Algorithm[J]. Gold Science and Technology, 2024 , 32(5) : 882 -893 . DOI: 10.11872/j.issn.1005-518.2024.05.134
null | Abdel-Basset M, Mohamed R, Sallam K M,et al,2022.Light spectrum optimizer:A novel physics-inspired metaheuristic optimization algorithm[J].Mathematics,10(19):3466. |
null | Askari F, Totonchi A, Farzaneh O,2012.3D stability analysis of convex slopes in plan view using lower bound linear finite element[J].International Journal of Civil Engineering,10(2):112-123. |
null | Cao Lanzhu, Huang Haoxuan, Wang Dong,et al,2018a.On the optimum layout of the soil and rock composite slope in an open pit mine[J].Journal of Safety and Environment,18(3):957-962. |
null | Cao Lanzhu, Li Guanghe, Wang Dong,et al,2018b.Optimization on spatial morphology slope of in pit dumping site at inclined weak-basement of surface mine[J].Coal Science and Technology,46(2):163-167. |
null | Chen Changfu, Li Wei, Zhang Jiarui,et al,2022.State-of-the-art of intelligent analysis and design in slope engineering of highways in mountainous areas[J].Journal of Hunan University(Natural Sciences),49(7):15-31. |
null | Cheng X, Li D, Zhao L,et al,2024.Optimal stability analysis of homogenous soil slopes with an irregular geometric morphology[J].Geomorphology,446:109005. |
null | Fang Qinghong, Hu Bin, Li Jing,et al,2021.Optimization model of slope control parameters based on SR-BP neural network[J].The Chinese Journal of Nonferrous Metals,31(9):2573-2582. |
null | Huang Shuang, Jia Mingtao, Lu Fang,2023.Optimization model of underground stope working plan based on heuristic genetic algorithm[J].Gold Science and Technology,31(4):669-679. |
null | Levenberg K,1944.A method for the solution of certain non-linear problems in least squares[J].Quarterly of Applied Mathematics,2(2):164-168. |
null | Li H,2021.Stability rating of mine rock slope based on artificial intelligence[J].Advances in Civil Engineering,(1):1-12. |
null | Liu Kaiyun, Qiao Chunsheng, Tian Shengfeng,et al,2005.Research on model construction of support vector machine and precision-influencing factors of slope angle design[J].Chinese Journal of Rock Mechanics and Engineering,(2):328-335. |
null | Lu Mingming, Huang Zaizhi, Sun Kan,2024.Optimization of ecological restoration design parameters of mine quarry slope based on multi-objective decision-making[J].Safety and Environmental Engineering,31(1):282-290. |
null | Marquardt D W,1963.An algorithm for least-squares estimation of nonlinear parameters[J].Journal of the society for Industrial and Applied Mathematics,11(2):431-441. |
null | Ministry of Housing and Urban-Rural Development of the People’s Republic of China,2014. Code for design of soil and water conservation engineering: [S].Beijing:China Planning Publishing House. |
null | Qiao Mu, Hu Bi, Li Jing,et al,2023.Research on sensitivity of slope control parameters considering mine slope stability and economic benefit[J].The Chinese Journal of Nonferrous Metals,33(8):2742-2752. |
null | Rong Guangxu, Li Zongyang,2023.Application of CNN-LSTM model in slope reliability analysis[J].Gold Science and Technology,31(4):613-623. |
null | Xu Chong, Liu Baoguo, Liu Kaiyun,et al,2010.Slope angle intelligent design based on Gaussian process with combinatorial kernel function[J].Rock and Soil Mechanics,31(3):821-826. |
null | Zevgolis I E, Deliveris A V, Koukouzas N C,2018.Probabilistic design optimization and simplified geotechnical risk analysis for large open pit excavations[J].Computers and Geotechnics,103:153-164. |
null | Zhang Huajin, Wu Shunchuan, Zhang Zhongxin,et al,2023.Research on automatic machine learning prediction method of slope stability[J].Journal of Safety Science and Technology,19(1):35-40. |
null | Zhang Xiaolong, Hu Jun, Zhao Tianyi,et al,2017.Geometric parameters optimization of dump slope based on BP neural network-genetic algorithm[J].Mining and Metallurgical Engineering,37(2):16-19. |
null | Zheng Kexin, Wu Yiping, Li Jiang,et al,2023.Prediction model of joint roughness coefficient based on Gaussian process regression[J].Bulletin of Geological Science and Technology,43(4):252-261. |
null | Zhou Changwei, Xie Xianping, Du Xidong,2024.Research on the prediction of CO concentration in single-head roadway based on curve fitting and neural network[J].Gold Science and Technology,32(1):75-81. |
null | Zhou Yongli, Huang Haoxuan, Zhai Zhengjiang,et al,2019.Optimization design of slope shape during stacking process of inner dump in open pit mine[J].Safety in Coal Mines,50(6):263-265,271. |
null | 曹兰柱,黄浩轩,王东,等,2018a.露天矿土—岩复合边坡形态优化设计[J].安全与环境学报,18(3):957-962. |
null | 曹兰柱,李广贺,王东,等,2018b.露天矿顺倾软弱基底内排土场边坡空间形态优化[J].煤炭科学技术,46(2):163-167. |
null | 陈昌富,李伟,张嘉睿,等,2022.山区公路边坡工程智能分析与设计研究进展[J].湖南大学学报(自然科学版),49(7):15-31. |
null | 方庆红,胡斌,李京,等,2021.SR-BP神经网络融合的坡态控制参数优化模型[J].中国有色金属学报,31(9):2573-2582. |
null | 黄爽,贾明涛,鲁芳,2023.基于启发式遗传算法的地下采场作业计划优化模型[J].黄金科学技术,31(4):669-679. |
null | 刘开云,乔春生,田盛丰,等,2005.边坡角设计的支持向量机建模与精度影响因素研究[J].岩石力学与工程学报,(2):328-335. |
null | 卢明明,黄在智,孙侃,2024.基于多目标决策的矿山采石场边坡生态修复设计参数优选[J].安全与环境工程,31(1):282-290. |
null | 乔木,胡斌,李京,等,2023.考虑矿山边坡稳定性和经济效益的坡态控制参数敏感性研究[J].中国有色金属学报,33(8):2742-2752. |
null | 荣光旭,李宗洋,2023.CNN-LSTM模型在边坡可靠度分析中的应用[J].黄金科学技术,31(4):613-623. |
null | 徐冲,刘保国,刘开云,等,2010.基于组合核函数的高斯过程边坡角智能设计[J].岩土力学,31(3):821-826. |
null | 张化进,吴顺川,张中信,等,2023.边坡稳定性自动机器学习预测方法研究[J].中国安全生产科学技术,19(1):35-40. |
null | 张晓龙,胡军,赵天毅,2017.基于BP—遗传算法的排土场边坡几何参数优化[J].矿冶工程,37(2):16-19. |
null | 郑可馨,吴益平,李江,等,2023.基于高斯过程回归的岩体结构面粗糙度系数预测模型[J].地质科技通报,43(4):252-261. |
null | 中华人民共和国住房和城乡建设部,2014. 水土保持工程设计规范: [S].北京:中国计划出版社. |
null | 周昌微,谢贤平,都喜东,2024.基于曲线拟合和神经网络的独头巷道CO浓度预测研究[J].黄金科学技术,32(1):75-81. |
null | 周永利,黄浩轩,翟正江,等,2019.露天矿内排土场堆叠过程中边坡形态优化[J].煤矿安全,50(6):263-265,271. |
/
〈 | 〉 |