[an error occurred while processing this directive] [an error occurred while processing this directive]
[an error occurred while processing this directive]Comprehensive Evaluation of Green Mine Construction in Gold Industry Based on DPSIR Model
Received date: 2023-02-02
Revised date: 2023-04-08
Online published: 2023-09-20
At present,the evaluation system and methods of green mine construction in the gold industry are not perfect.On the one hand,in most studies,when establishing the index system,the internal relations between indicators were ignored,and only the influencing factors related to green mine construction in general were listed.On the other hand,most of the models lack completeness when establishing the evaluation model, they only evaluate the construction results at a certain time point without showing the change trend of the construction process.Based on the framework model of driving forces,pressure,state,impact and response,the evaluation index system of green mines in gold industry was constructed to express the internal relationship between indicators more intuitively.In building the evaluation model,the subjective and objective combination weighting method was introduced so as to make the index weight meet the subjective expectations of the decision-makers and the objective judgment requirements of the inconsistency between the indicators.The TOPSIS coupling coordination model was introduced to quantitatively evaluate the space-time evolution process of green mine construction and the coupling coordination among subsystems,and the main obstacle factors affecting the green mine construction of enterprises were analyzed,providing guidance countermeasures for the improvement of green mine construction of enterprises.Through the analysis of an actual case of a gold mine in Shaanxi Province,it is concluded that the green mine construction of the general system of the mine and the coupling and coordination degree between the subsystems are steadily increasing,the construction of each subsystem is fluctuating.The industrial production capacity(C1),the energy consumption(C5),the mine environment(C9),and the mineral processing(C11) are the main obstacles in the construction process,which are consistent with the actual construction of the mine,and the applicability of the model is verified.The evaluation index system established in this paper clarifies the function mechanism of each index of green mine construction,which helps enterprises flexibly respond to a series of related factor changes caused by a certain index change.The established evaluation model improves the defect of subjective influence on the evaluation results in the traditional evaluation,highlights the internal connection and coordination between the evaluation indicators,makes the evaluation process and results more fair and reliable,and provides an effective way to promote the sustainable development of the gold industry mining industry.
Wei YANG , Mengge XUE , Tao LONG , Sha DENG , Bo DENG , Nan FANG . Comprehensive Evaluation of Green Mine Construction in Gold Industry Based on DPSIR Model[J]. Gold Science and Technology, 2023 , 31(4) : 635 -645 . DOI: 10.11872/j.issn.1005-2518.2023.04.018
http://www.goldsci.ac.cn/article/2023/1005-2518/1005-2518-2023-31-4-635.shtml
论文撰写过程中得到了陕西省黄金协会项目和陕西省多家黄金企业的大力支持以及行业专家的积极配合,在此一并表示衷心感谢!
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Ministry of Natural Resources of the People’s Republic of China,2018., Green mine construction specification of gold industry:DZ/T 0314-2018 [S].Beijing:Ministry of Natural Resources of the People’s Republic of China.
|
|
|
|
|
|
|
|
|
|
|
付强,韩冰,侯韩芳,等,2017.基于DEA方法的绿色矿山标准效果评估[J].标准科学,(8):43-46.
|
关锌,2016.我国绿色矿山建设浅析[J].中国矿业,25(6):72-74.
|
郝美英,李亮,赵冠楠,2018.我国黄金行业绿色矿山建设规范解读[J].中国矿业,27(8):80-84,87.
|
黄敬军,倪嘉曾,宋云飞,等,2009.绿色矿山建设考评指标体系的探讨[J].金属矿山,39(11):147-150.
|
金学强,赵震宇,王小龙,等,2020.新形势下绿色矿山建设长效机制问题研究及建议[J].中国锰业,38(6):79-83.
|
赖小莹,2013.绿色矿山建设评价指标与方法研究[J].资源节约与环保,(8):26.
|
栗欣,2017.绿色矿山建设模式的实践与探索[J].中国国土资源经济,30(4):22-25.
|
李杏茹,禚传源,赵祺彬,等,2023.基于标准比较的我国绿色矿山建设国际化水平与质量提升[J].矿业研究与开发,43(4):224-232.
|
刘丽萍,侯华丽,刘建芬,2015.对我国绿色矿山建设与发展的思考[J].中国国土资源经济,28(7):18-21,25.
|
刘亦晴,梁雁茹,刘娜娜,等,2020.基于高质量发展视角的绿色矿山建设评价指标体系研究[J].黄金科学技术,28(2):176-187.
|
罗德江,吴昊,何苏,等,2021.基于犹豫模糊TOPSIS的绿色矿山多属性评价方法[J].矿产综合利用,(4):41-49.
|
马莉,2019.我国绿色矿山发展水平评价及发展模式与长效机制研究[D].徐州:中国矿业大学.
|
马宁,胡乃联,李国清,等,2019.基于模糊层次分析法的高原矿井人机功效评价[J].黄金科学技术,27(6):871-878.
|
彭焕智,周国华,崔树强,等,2022.湘江流域土地利用多功能性评价及障碍因子识别[J].水土保持研究,29(4):308-315.
|
司芗,张应红,刘立,等,2020.新时代我国绿色矿山建设与发展的思考[J].中国矿业,29(2):59-64.
|
宋子岭,范军富,祁文辉,等,2016.露天煤矿绿色开采技术与评价指标体系研究[J].煤炭学报,41(增2):350-358.
|
孙映祥,2020.我国绿色矿山建设研究现状综述与思考[J].中国国土资源经济,33(9):35-40,85.
|
徐先锋,邢鹏飞,王岁红,等,2022.基于博弈论G1-EW-TOPSIS法的岩体质量评价和应用[J].黄金科学技术,30(5):704-712.
|
张小刚,秦绪明,刘永红,等,2021.2019年与2020年全国绿色矿山评价指标及名录对比分析[J].露天采矿技术,36(5):121-124.
|
张英亮,张兄明,2019.绿色矿山建设浅析[J].中国非金属矿工业导刊,(2):64-65,63.
|
中华人民共和国自然资源部,2018. 黄金行业绿色矿山建设规范:DZ/T 0314-2018 [S].北京:中华人民共和国自然资源部.
|
/
〈 |
|
〉 |