[an error occurred while processing this directive] [an error occurred while processing this directive] [an error occurred while processing this directive]
[an error occurred while processing this directive]
Mining Technology and Mine Management

Determination of Blasting Parameters for Excavation and Cutting of Small Section Roadways Based on Orthogonal Experiments

  • Yifeng ZHANG , 1 ,
  • Hongchao LI , 1, 2 ,
  • Zhiyu ZHANG 3 ,
  • Heng LI 1
Expand
  • 1. Faculty of Public Security and Emergency Management, Kunming University of Science and Technology, Kun -ming 650093, Yunnan, China
  • 2. City College, Kunming University of Science and Technology, Kunming 650093, Yunnan, China
  • 3. Faculty of Land Resources Engineering, Kunming University of Science and Technology, Kunming 650093, Yunnan, China

Received date: 2022-07-13

  Revised date: 2022-10-28

  Online published: 2023-04-27

Highlights

In order to improve the utilization rate of blastholes in small section tunnels in a tin mine in Yunnan Province and reduce the unit consumption of explosives,after analysis,it is determined that the four factors of the charge amount,the distance between the charge hole and the empty hole,the hole diameter and the filling length are the test factors.The blast hole utilization rate and the cavity volume are the test indicators,and each factor takes 3 levels.Using the method of repeated orthogonal experiments,the effects of four different factors,namely,the charge amount,the distance between the charge hole and the empty hole,the hole diameter and the packing length,on the blasting hole utilization rate and the cavity volume were studied through the range analysis and variance analysis.The significance of the influence of each test index determine the optimal com-bination of test factors.The research results show that in the range analysis,the distance between the charge hole and the empty hole has the greatest influence on the utilization rate of the undercut blasting hole,followed by the hole diameter,the charge amount is smaller,and the filling length has the least influence. The hole diameter has the largest impact on the groove volume,the distance between the charging hole and the empty hole is second,the packing length is smaller,and the charging amount has the smallest influence.In the variance analysis,the distance between the charge hole and the empty hole has a very significant effect on the blast hole utilization rate,the hole diameter has a significant effect on the blast hole utilization rate,and the charge amount and packing length have no significant effect on the blast hole utilization rate.The hole diameter has a very significant influence on the volume of the cavity,the distance between the charging hole and the empty hole has a significant effect on the volume of the cavity,and the significant effect of the packing length on the volume of the cavity is slightly weaker than the distance between the charging hole and the empty hole.The amount has the least significant effect on the cavity volume.Therefore,for small section roadway excavation,when the hole diameter is 70 mm,the distance between the charge hole and the empty hole is 10 cm,the charge amount is 3 kg,and the mud filling length is 20 cm,the undercut can achieve excellent blasting effect.After several on-site roadway excavation tests,the blasthole utilization rate can be increased from 80% to more than 93%.

Cite this article

Yifeng ZHANG , Hongchao LI , Zhiyu ZHANG , Heng LI . Determination of Blasting Parameters for Excavation and Cutting of Small Section Roadways Based on Orthogonal Experiments[J]. Gold Science and Technology, 2023 , 31(2) : 331 -339 . DOI: 10.11872/j.issn.1005-2518.2023.02.091

[an error occurred while processing this directive]

http://www.goldsci.ac.cn/article/2023/1005-2518/1005-2518-2023-31-2-331.shtml

Cao Xiaofan Tang Yichuan Deng Niandong,et al,2020.Aeolian sand paste filling material ratio based on repeated orthogonal test[J].Safety in Coal Mines51(9):65-70.

Dai Jun Yang Qiang Li Chuanjing,et al,2018.Application of analytic hierarchy process to tunnel cutting blasting [J].Journal of Henan University of Science and Technology(Natural Science)39(4):67-72.

Du Lian Zhao Mingsheng Qi Puyan,et al,2020.Application of blasting funnel theory in slopeing forming control of slope[J].Mining Research and Development40(9):18-22.

Hu Gang Guo Zhiyu Li Qingwen2018.Study on factors affecting the explosibility of the coal gangue with orthogonal test[J].Non-Metallic Mines41(5):31-33.

Jiang Fuliang Zhang Shuai Li Xiangyang,et al,2018.Experimental study on materials blending proportion for preparation of simulated uranium ore based on orthogonal design[J].Mining and Metallurgical Engineering38(2):20-24.

Li Heng Zhang Zhiyu Li Xianglong,et al,2022.Sensitivity analysis of punching effect of water-bearing blast hole in open air based on orthogonal design[J].Nonferrous Metals Engineering12(4):91-99.

Li Xianglong Yang Changhui Wang Jianguo,et al,2022.Parameter optimization of presplitting blasting based on model test[J].Chinese Journal of High Pressure Physics36(2):190-196.

Liu Zhigang Cao Anye Jing Guangcheng2018.Research on parameters optimization of stress relief blasting in coal roadway using orthogonal experiment [J].Journal of Mining and Safety Engineering35(5):931-939.

Shan Renliang Huang Baolong Wei Zhenting,et al,2012.Model test of quasi-parallel cut blasting in rock drivage[J].Chinese Journal of Rock Mechanics and Engineering31(2):256-264.

Sun Fei Zhou Xiangyang Jiang Xinzhong,et al,2016.Optimal design of shaped charge cutter used in blasting demolition of steel chimney[J].Engineering Blasting22(6):48-54.

Sun Longhua Yang Shuangsuo Li Dachang,et al,2013.Research of the reasonable cutting method and blasting parameter in limestone drift excavation[J].Metal Mine42(9):26-29.

Wen Tao Tan Hai2011.The empty hole effect numerical computation analysis during rock blasting[J].Blasting28(3):58-61.

Wu Qinzheng Li Runran Li Guilin,et al,2021.Optimization of millisecond delay blasting time in open pit mine based on JKSimBlast software[J].Gold Science and Technology29(6):854-862.

Yang J X Liu C Y2017.Experimental study and engineering practice of pressured water coupling blasting[J].Shock and Vibration,(1):1-12.

Yang R S Gao X T Liu G Q,et al,2012.The structure design of slit-charge for directional fracture controlled blasting in stone drifting [J].Advanced Materials Research,619:388-392.DOI:10.4028/www.scientific.net/AMR.619.388 .

Yin Yuejiang Li Ruize Chen Ming,et al,2019.Sensitivity analysis of influencing factors of blasting fragmentation distribution based on orthogonal experiment method[J].Blasting36(4):37-42.

Yu Bingbing Wang Yanbing Wang Baozhu2021.Experimental study on over-slotting blasting of rock roadway in Gubei coal mine[J].Coal Engineering53(11):113-119.

Yuan W Su X B Wang W E,et al,2019.Numerical study of the contributions of shock wave and detonation gas to crack generation in deep rock without free surfaces[J].Journal of Petroleum Science and Engineering,177:699-710.

Yuan Wenhua Ma Qinyong Huang Wei2012.Model experiment and analysis of wedge-shaped cutting millisecond blasting[J].Chinese Journal of Rock Mechanics and Engineering31(Supp.1):3352-3356.

Zhang H Li T Wu S,et al,2022.A study of innovative cut blasting for rock roadway excavation based on numerical simulation and field tests[J].Tunnelling and Underground Space Technology,119:104233.

Zhang Yufei2018.Model Test Study on Confining Pressure Effect of Cut Blasting in High Geo-stress Rock Lane[D].Beijing:China University of Mining and Technology.

Zou B Xu Z Wang J,et al,2020.Numerical investigation on influential factors for quality of smooth blasting in rock tunnels[J].Advances in Civil Engineering,(4):1-17.

曹晓凡,唐亦川,邓念东,等,2020.基于重复正交试验的风积砂膏体充填材料配比[J].煤矿安全51(9):65-70.

戴俊,杨强,李传净,等,2018.层次分析法在隧道掏槽爆破中的应用[J].河南科技大学学报(自然科学版)39(4):67-72.

杜炼,赵明生,齐普衍,等,2020.爆破漏斗理论在边坡坡面成型控制中的应用[J].矿业研究与开发40(9):18-22.

胡刚,国志雨,李庆文,2018.煤矸石混凝土可爆性影响因素的正交试验研究[J].非金属矿41(5):31-33.

蒋复量,张帅,李向阳,等,2018.基于正交设计的类铀矿岩相似材料配合比试验研究[J].矿冶工程38(2):20-24.

李恒,张智宇,李祥龙,等,2022.基于正交设计的露天含水炮孔冲孔效应敏感度分析[J].有色金属工程12(4):91-99.

李祥龙,杨长辉,王建国,等,2022.基于模型试验的预裂孔爆破参数优选[J].高压物理学报36(2):190-196.

刘志刚,曹安业,井广成,2018.煤体卸压爆破参数正交试验优化设计研究[J].采矿与安全工程学报35(5):931-939.

单仁亮,黄宝龙,蔚振廷,等,2012.岩巷掘进准直眼掏槽爆破模型试验研究[J].岩石力学与工程学报31(2):256-264.

孙飞,周向阳,蒋新忠,等,2016.线型聚能切割器爆破拆除钢结构烟囱的优化设计[J].工程爆破22(6):48-54.

孙龙华,杨双锁,李达昌,等,2013.石灰岩平巷合理掏槽方法和爆破参数的研究[J].金属矿山42(9):26-29.

文梼,谭海,2011.岩石爆破中的空孔效应数值计算分析[J].爆破28(3):58-61.

吴钦正,李润然,李桂林,等,2021.基于JKSimBlast软件的露天矿爆破毫秒延期时间优化[J].黄金科学技术29(6):854-862.

尹岳降,李瑞泽,陈明,等,2019.基于正交试验法的爆破块度分布影响因素敏感性分析[J].爆破36(4):37-42.

于冰冰,王雁冰,王宝珠,2021.顾北煤矿岩巷掏槽超深爆破试验研究[J].煤炭工程53(11):113-119.

袁文华,马芹永,黄伟,2012.楔形掏槽微差爆破模型试验与分析[J].岩石力学与工程学报31(增1):3352-3356.

张宇菲,2018.高地应力岩巷掏槽爆破围压效应模型试验研究[D].北京:中国矿业大学.

Outlines

/

[an error occurred while processing this directive]