[an error occurred while processing this directive] [an error occurred while processing this directive]
[an error occurred while processing this directive]Study on Induced Caving Mechanism and Development Process of Large Area Cemented Backfill
Received date: 2022-05-07
Revised date: 2022-07-16
Online published: 2022-12-10
When the mining method in the West No.2 mining area of Longshou mine was changed from down layered cemented filling mining method to sublevel caving mining method,it is necessary to form a loose overburden by caving or blasting the large area cemented filling.Using the traditional drilling and blasting method to form the loose overburden has a series of disadvantages,such as long period,large input and less output,which can not meet the production needs of the mine.A induced caving technical scheme of forming loose overburden by reserving ore bulk as safety cushion and uniformly expanding goaf was proposed,which combined the formation of overburden with the dual demand of stope productivity.Microseismic monitoring technology was used to monitor the caving process of cemented backfill.The monitoring results show that the caving mechanism of cemented backfill in West No.2 mining area can be divided into three types.The first type is the failure event of cemented backfill caused by the mining stress concentration within 20~45 m behind the goaf,which mainly occurs in the early to middle stage of drifts mining.The second type is that with the expansion of the goaf,the shear stress at the fulcrum of the suspended cemented backfill beam is also increasing,when the shear stress exceeds the shear strength of the cemented backfill,the beam will shear failure at the fulcrum at the rear edge of the goaf,this kind of failure event mainly occurs in the middle to end stage of drifts mining.The third is that when the exposed length of the cemented backfill beam increases to a certain extent,the cemented backfill beam bends and sinks under the ground pressure and its own gravity,resulting in tensile stress in the middle of the rock beam of the filling body,resulting in bending and tensile failure in the middle of the cemented backfill beam,this kind of failure event mainly occurs in the middle to end stage of drifts mining.Based on the comprehensive analysis of the results of microseismic monitoring,theoretical calculation and in-site ore drawing tracking,it can be seen that during 1 595 m sublevel mining,the caving of cemented backfill mainly occurs at the level of 1 610~1 630 m.Therefore,a loose overburden composed of residual ore and caving cemented backfill with a total thickness of about 30 m is formed on the floor of the first mining sublevel.This loose overburden thickness meets the safety requirements of mining and the requirements of relevant safety regulations,which shows that the preset goal of forming loose overburden safely,efficiently and at low cost has been successfully achieved by using induced caving technology in the West No.2 mining area.
Huayou SU , Yongding WANG , Baohui TAN , Weiguo LONG , Ning YANG , Zhigui ZHANG , Xingming CHEN . Study on Induced Caving Mechanism and Development Process of Large Area Cemented Backfill[J]. Gold Science and Technology, 2022 , 30(5) : 713 -723 . DOI: 10.11872/j.issn.1005-2518.2022.05.062
新疆:打造战略性矿产安全保障核心区
日前,《新疆维吾尔自治区矿产资源总体规划(2021—2025年)》(以下简称《规划》)正式发布实施。根据《规划》,新疆将着力打造战略性矿产安全保障核心区。
据了解,新疆矿产资源丰富,具有资源优势突出、矿种齐全、分布广、配套程度高、部分矿种资源储量大和质量好等特点,是我国重要的能源资源开发区,目前已发现矿种152个,占全国已发现矿种的87.9%。在查明有资源储量的矿种中,有12种居全国首位,20种居全国第二位,10种居全国第三位。
《规划》提出,到2025年,新疆矿产资源勘查开发科技创新能力不断增强,矿产资源勘查开发与保护格局更加优化,支撑保障国家“三基地一通道”和能源资源接替基地建设更加有力。矿业发展质量显著提升,矿业权市场更加健全、更加活跃,矿山生态环境质量持续提升,矿山安全根基稳固,初步形成资源、经济、环境、社会效益协调统一的矿业高质量发展新格局。到2035年,矿产资源勘查开发支撑经济社会发展更加有力,矿产资源结构布局稳定成型,大中型矿山比例提高至50%以上,矿业开发集聚效应、规模效应进一步显现,矿业高质量发展与经济社会发展协调一致,绿色勘查开采方式基本普及,矿山智能化水平全面提升,矿产资源管理和矿业权市场监管制度更趋完善,新疆矿业参与国内国际竞争新优势有效凸显,绿色、安全、创新、协调的矿产资源保障体系基本建立。
《规划》明确,根据区域地质背景、成矿地质条件、资源分布特点,立足“两环八带十六基地”勘查开发空间格局,统筹全疆矿产资源调查、勘查开发与保护,优化勘查开发区域布局,支撑“三基地一通道”建设。依据矿产资源分布特点及勘查开发利用现状,按照“深化北疆东疆,加快南疆勘查开发”的总体思路,划分环准噶尔、环塔里木、阿尔泰、东准噶尔、西准噶尔、东天山、西天山、西南天山、西昆仑、东昆仑—阿尔金等“两环八带”10个勘查开发区;落实《全国矿产资源规划(2021—2025年)》中的16个能源资源基地、58个国家规划矿区,打造战略性矿产安全保障核心区;结合自治区勘查开发实际,划定5个战略性矿产资源储备区、60个重点勘查区、75个重点开采区。
为落实国家能源资源安全战略,结合新疆实际,《规划》合理确定了重点、限制、禁止勘查开采矿种。此外,对矿产资源调查评价与勘查、矿产资源开发利用与保护、矿业绿色发展、矿产资源市场化改革与管理以及矿业开放合作等方面也提出了明确要求。
据悉,新疆矿产资源总体规划由自然资源部审批,自治区人民政府发布实施。《规划》要求,自治区有关部门和各地政府要加强组织领导,明确职责分工,认真履行职责,加强协调配合,做好政策衔接,各级自然资源主管部门是矿产资源总体规划实施的主责部门,及时组织研究解决规划实施过程中的重大问题,全面落实规划目标任务。
人民网)
http://www.goldsci.ac.cn/article/2022/1005-2518/1005-2518-2022-30-5-713.shtml
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
曹建立,2017.多空区菱镁矿矿岩冒落规律及其应用研究[D].沈阳:东北大学.
|
|
付建新,朱鹏瑞,宋卫东,等,2020.基于时滞非线性MGM模型的崩落法开采冒落高度预测研究[J].采矿与安全工程学报,37(4):741-749.
|
|
谷拴成,樊琦,王建文,等,2012.层状岩体巷道顶板冒落拱高度计算方法研究[J].煤炭工程,44(12):73-76.
|
|
何荣兴,任凤玉,曹建立,等,2015.基于RG井下电视系统的空区冒落监测[J].金属矿山,44(8):120-124.
|
|
侯公羽,胡涛,李子祥,等,2020.基于分布式光纤技术的采动影响下覆岩变形演化规律试验研究[J].岩土力学,41(3):970-979.
|
|
黄琪嵩,程久龙,丁厚成,等,2019.大范围顶板岩体垮落冲击动载对采场底板破坏的影响研究[J].采矿与安全工程学报,36(6):1228-1233,1239.
|
|
李海英,任凤玉,赵云峰,等,2020.金属矿空区冒落诱发地表塌陷范围的计算模型探讨[J].矿冶工程,40(5):5-8.
|
|
李楠,常帅,任凤玉,2016.崩落法纵向分区开采冒落危害防治技术[J].金属矿山,45(9):62-65.
|
|
刘建坡,魏登铖,师宏旭,等,2021.深部金属矿采场顶板滑移冒落微震时空演化规律[J].金属矿山,50(11):13-18.
|
|
任凤玉,韩智勇,赵恩平,等,2007.诱导冒落技术及其在北洺河铁矿的应用[J].矿业研究与开发,27(1):17-19.
|
|
武拴军,张志贵,王永定,等,2021.诱导冒落在龙首矿崩落法覆盖层形成中的应用[J].矿业研究与开发,41(10):14-21.
|
/
| 〈 |
|
〉 |