[an error occurred while processing this directive]Study on Ground Stress Characteristics and Its Influence on Roadway De-formation Failure in Jinchuan No.2 Mining Area
Received date: 2021-08-31
Revised date: 2021-10-03
Online published: 2022-03-07
With the development of underground engineering construction to the deeper earth,high ground stress has become a key factor affecting the stability of deep roadway surrounding rock.Under the action of high in-situ stress,the mechanical behavior characteristics and microstructure of deep rock mass change significantly compared with shallow rock mass,which is the cause of frequent mining accidents in deep underground engineering,and also the research focus in the field of rock mechanics.Taking Jinchuan No.2 mining area,a typical high in-situ stress mining area,as the background,this paper summarizes the in-situ stress distribution characteristics of the study area according to the previous measured data.On this basis,the discrete element numerical simulation method was used to calibrate the rock mechanical parameters based on the laboratory test of rock samples in the study area,and the tunnel models under three different in-situ stress conditions were established.According to the simulation results,the development process of roadway surrounding rock deformation under different conditions was described,the deformation failure characteristics of roadway in each model were compared,the influence of ground stress on roadway deformation failure was analyzed,and the corresponding control methods were proposed.The main conclusions of the study include:(1)Due to the influence of complex geological background,the distribution of ground stress in Jinchuan No.2 mining area is highly discrete.In the measured data,there are more than 80% of the measure points show that maximum horizontal principal stress is greater than the vertical principal stress,and the stress of primary rock is mostly horizontal.In shallow mining areas,the growth rate of horizontal stress is greater than that of vertical stress.With the increase of buried depth,the increment speed of horizontal stress gradually decreases,and the vertical principal stress gradually approaches the maximum horizontal principal stress.(2)Without the influence of structural planes,the deformation mode of homogeneous surrounding rock roadway is mainly roof subsidence and floor heave,and the deformation is mainly dependent on plastic flow.With the continuous increasing of in-situ stress,the total deformation and deformation velocity of roadway are increasing.Ground stress does not change the deformation mode of roadway surrounding rock,but intensifies its failure degree.(3)When roadway excavation is carried out under geological conditions dominated by horizontal ground stress,support of roof and floor should be adopted to maintain the overall stability of roadway.In addition,because of the significant time effect of plastic deformation,the cracking caused by the compression of roadway lining also has a certain lag.Thus,the deformation of roadway should be regularly monitored in the construction in case of the dangerous deformation.The research results can provide theoretical reference for safe and efficient deep mining in Jinchuan No.2 mining area.
Guang LI , Fengshan MA , Jie GUO , Long ZOU , Yongyuan KOU . Study on Ground Stress Characteristics and Its Influence on Roadway De-formation Failure in Jinchuan No.2 Mining Area[J]. Gold Science and Technology, 2021 , 29(6) : 817 -825 . DOI: 10.11872/j.issn.1005-2518.2021.06.120
全国人大代表满慎刚:潜心尾矿综合利用
“胶东地区黄金企业年产浮选尾矿近2 700万吨,其中用于井下充填不足50%。全国非煤地下矿山资源赋存条件普遍不佳,凿岩机械化作业率不足20%,支护机械化作业率不足10%。”这组数据来自全国人大代表满慎刚履职期间撰写的调研报告。半年里,他先后调研20多个地市的近30家企业与高校,既找问题也寻答案。
“仅胶东一个地区就有近1 500万吨尾矿无法利用,这要占用多少土地,这是土地与资源的双重浪费。”这位干了30多年的“老矿山”下决心要解决多年来制约黄金矿山发展的顽疾。
作为山东黄金集团党委书记、董事长,满慎刚算过一笔账,综合利用一吨尾矿,就能少挖千斤河沙。目前,全国尾矿堆存量为195亿吨,82%为铁矿、铜矿、金矿和磷矿采选产生的尾矿和废石。而国内尾矿综合利用率只有37%(同年比值),远低于矿业发达国家62%的水平,如果能够达到同等水平,不仅能够形成一个千亿元产业,提高资源利用率,更能保护环境,建立生态良性循环机制。
2021年10月,由满慎刚牵头东北大学等4家科研院所和9家企业单位近百名专业技术人员,参与“黄金尾渣资源化利用联合创新研究基地”建设,集中优势科技资源,攻克浮选尾矿、氰化尾渣资源化利用关键技术,建设尾渣生态化利用示范工程。科研团队通过组织开展浮选尾矿增值化综合回收试验、重介质分选建筑用砂、氰渣悬浮热解及回转窑热解工艺等探索实验,粗尾矿用作优质建筑砂,长石等用作陶瓷原料,资源利用效率得到大幅提高。目前,部分科研成果已在矿山应用。
迈入2022年,满慎刚依然奔波在路上,在他的直接推动下,渤海湾畔正在建设尾矿综合利用基地。如今,在山东黄金所属矿山企业,5G、大数据、人工智能、物联网等新技术在矿山推广应用,传统矿业走上数字化转型升级之路,一幅幅智慧矿山图景徐徐展开。
http://www.goldsci.ac.cn/article/2021/1005-2518/1005-2518-2021-29-6-817.shtml
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
陈菲,何川,邓建辉,2015.高地应力定义及其定性定量判据[J].岩土力学,4:971-980.
|
|
何满潮,王琦,吴群英,等,2020.采矿未来——智能化5GN00矿井建设思考[J].中国煤炭,46(11):1-9.
|
|
江权,史应恩,蔡美峰,等,2019.深部岩体大变形规律:金川二矿巷道变形与破坏现场综合观测研究[J].煤炭学报,44(5):1337-1348.
|
|
康红普,林健,张晓,等,2010.潞安矿区井下地应力测量及分布规律研究[J].岩土力学,31(3):827-831.
|
|
李光,马凤山,郭捷,等,2017.U钢管混凝土支架支护技术在金川矿山的应用[J].黄金科学技术,25(5):57-66.
|
|
李光,马凤山,郭捷,等,2020.高地应力破碎围岩巷道变形破坏特征及支护方式研究[J].黄金科学技术,28(2):1-8.
|
|
李光,马凤山,刘港,等,2018.金川矿区深部巷道支护效果评价及参数优化研究[J].黄金科学技术,26(5):605-614.
|
|
马凤山,卢蓉,郭捷,等,2019.金川二矿区大体积充填体变形的三维数值模拟[J].工程地质学报,27(1):14-20.
|
|
钱七虎,2012.地下工程建设安全面临的挑战与对策[J].岩石力学与工程学报,31(10):1945-1956.
|
|
孙广忠,1993.工程地质与地质工程[M].北京:地震出版社.
|
|
孙鹏,2019.金川二矿区深部地应力测量及其应力状态分析[D].西安:长安大学.
|
|
陶连金,蒯本秋,张波,2010.松散软岩巷道破坏的颗粒离散元模拟分析[J].地下空间与工程学报,6(2):318-322.
|
|
王明洋,李杰,李凯锐,2015.深部岩体非线性力学能量作用原理与应用[J].岩石力学与工程学报,34(4):659-667.
|
|
吴满路,马宇,廖椿庭,等,2008.金川二矿深部1 000 m中段地应力测量及应力状态研究[J].岩石力学与工程学报,27(增2):3785-3790.
|
|
谢和平,2017.“深部岩体力学与开采理论”研究构想与预期成果展望[J].工程科学与技术,49(2):1-16.
|
/
| 〈 |
|
〉 |