[an error occurred while processing this directive]Control Technology of High Stress Broken Surrounding Rock in Kilometer Deep Shaft
Received date: 2020-06-14
Revised date: 2020-07-29
Online published: 2021-01-29
The deep mining has become an inevitable trend of the world’s metal deposit mining with the depletion of shallow metal mineral resources.The surrounding rocks in deep stopes and roadways are often in a complex stress environment of “three highs and one disturbance”.The surrounding rocks in deep roadways often suffer from collapsed,rock bursts and other damages,which causing ore loss and depletion,equipment damage and casualties,and seriously hindering the production of mines.The Sanshandao gold deposit is the earliest discovered large-scale gold deposit of altered rock in the broken zone.The structure faulted is the mainly faulted in the area.The Xinli fault zone located in the northeast of the Sanshandao-Cangshang fault zone is an ore-controlling faulted structure in the mining area.The rock mass in the fault zone is subject to strong weathering and tectonic movement.The cracks are very developed and the surrounding rock strength is low.The roof collapse often occured during tunneling.Therefore,it is necessary to take timely and effective support measures for deep high-stress fractured surrounding rocks.In this paper,the deep roadway of Sanshandao gold mine is used as the engineering background.Through field engineering geological surver,and the discontinuity information of surrounding rock at -1 005 m level in Sanshandao gold mine was obtained.The surrounding rock is mainly distributed with three sets of joints,and one set is nearly parallel to the axial direction of the roadway and the inclination angle is about 90°.The laboratory studies were carried out.Rock mass classfication were estimated,accordingly.Q=1.5,RMR=40.25,GSI=35.The quality of the rock mass is poor.Roclab software was used to estimate the mechanical parameters of the rock mass,and the compressive strength and tensile strength of the rock mass are 3.477 MPa and 0.003 MPa,respectively.The rock mass strength is low.Based on the support charts with RMR and Q,the shotcrete + anchor + reinforcement mesh + double bars support method was adopted in the study area.The RS2 and Unwedge software were used to analyze the change characteristics of surrounding rock plastic zone,displacement and potential wedge safety factor before and after roadway support.The results show that after the roadway is supported,the vertical displacement of the roadway roof is reduced from 2.2 cm to 0.76 cm.The plastic zone of the roadway roof is reduced from 4.481 m to 1.634 m,the leftwall plastic zone is reduced from 1.760 m to 0.859 m,and the rightwall plastic zone is reduced from 1.830 m to 0.860 m,the safety factor of the potential wedge of the roadway roof increased from 1.5 to 22.7.The plastic zone and displacement of the surrounding rock are significantly reduced,and the potential wedge safety factor is significantly increased.The proposed support scheme can ensure the stability of the roadway.Therefore,the comprehensive research method of combining the empirical method and numerical simulation can accurately to analyze the stability of the roadway and determine a more reliable support scheme.It provides a reliable guarantee for the mine safety production.
Chenglong WANG , Chenglu HOU , Shanghuan YANG , Xingdong ZHAO . Control Technology of High Stress Broken Surrounding Rock in Kilometer Deep Shaft[J]. Gold Science and Technology, 2020 , 28(6) : 885 -893 . DOI: 10.11872/j.issn.1005-2518.2020.06.112
http://www.goldsci.ac.cn/article/2020/1005-2518/1005-2518-2020-28-6-885.shtml
| 1 |
赵兴东.高应力破裂岩体条件下锚网支护研究[J].岩土力学,2006,10(增2):918-920.
|
| 2 |
赵兴东.超深竖井建设基础理论与发展趋势[J].金属矿山,2018(4):1-10.
|
| 3 |
李秋涛,赵兴东,张洪山,等.山东金青顶矿区深部高应力急倾斜矿体开采方法研究[J].采矿技术,2019,19(2):1-4.
|
| 4 |
|
| 5 |
|
| 6 |
赵兴东,朱乾坤,赵一凡.板庙子金矿深部开采留设隔离矿柱控制地压数值优化[J].采矿技术,2019,19(1):61-66.
|
| 7 |
赵兴东,杨晓明,牛佳安,等.岩爆动力冲击作用下释能支护技术及其发展动态[J].采矿技术,2018,18(3):23-28.
|
| 8 |
|
| 9 |
李庶林.深井硬岩岩爆倾向性与岩层控制技术研究[D].沈阳:东北大学,2000.
|
| 10 |
侯朝炯.深部巷道围岩控制的关键技术研究[J].中国矿业大学学报,2017,46(5):970-978.
|
| 11 |
侯朝炯.深部巷道围岩控制的有效途径[J].中国矿业大学学报,2017,46(3):467-473.
|
| 12 |
柏建彪,侯朝炯.深部巷道围岩控制原理与应用研究[J].中国矿业大学学报,2006,35(2):145-148.
|
| 13 |
|
| 14 |
崔耀,张俊儒.硬质破碎岩体中隧道锚肋组合支护体系的构想[J].路基工程,2018(4):54-60.
|
| 15 |
徐青云,高明仕,谭云,等.深部厚松散层破碎围岩大巷支护参数优化研究[J].煤炭科学技术,2015,43(4):39-42,114.
|
| 16 |
郭建伟,刘泉声,杨战标,等.平顶山矿区深部大规模松软围岩巷道支护技术[J].岩石力学与工程学报,2012,31(增2):3904-3910.
|
| 17 |
|
| 18 |
杨亚平,杨有林,穆玉生,等.金川矿区深部高应力破碎岩体巷道支护技术研究及应用[J].中国矿业,2018,27(11):99-103.
|
| 19 |
袁亮,薛俊华,刘泉声,等.煤矿深部岩巷围岩控制理论与支护技术[J].煤炭学报,2011,36(4):535-543.
|
| 20 |
|
| 21 |
|
/
| 〈 |
|
〉 |