[an error occurred while processing this directive] [an error occurred while processing this directive] [an error occurred while processing this directive]
[an error occurred while processing this directive]
Mining Technology and Mine Management

Research on Safety Roof Span in Continuous Mining of Gold Vein Group Under Synergistic Concept

  • Xingxin NIE ,
  • Quan GAN ,
  • Jian GAO ,
  • Shanshan FENG
Expand
  • School of Resources Engineering,Xi’an University of Architecture and Technology,Xi’an 710055,Shaanxi,China

Received date: 2019-11-04

  Revised date: 2020-02-27

  Online published: 2020-07-01

Highlights

In order to mine strip cluster veins efficiently and safely,based on the concept of collaborative mining,the concept of cluster continuous mining and the continuous horizontal layered filling continuous mining method were proposed.First and foremost,the theoretical calculation methods of slab beam,Platts pressure arch method,thick-span ratio method,load transfer intersection line method and structural mechanics beam theory method were used,and the safety factor was introduced to calculate the roof span under different safety factors.The roof safety problem of the continuous mining method is studied.Furthermore,through the analysis,the safe stoping span of cluster continuous mining method is ranged from 23.0 m to 18.6 m. When the safety factor was 2.0,the number of roof span was modeled by ANSYS and verified by Flac3D. For one thing,the numerical simulation results show that the maximum principal stress is 2.84 MPa,and the maximum displacement is 9.7 mm.There is only a small shear stress failure in the middle chamber.For another,the engineering example shows that: when the stope span is 18 m (rounding 18.6 m),there is rock block falling in a small local area of the roof,and the ratio of the length of the falling block to the roof span is 1.67%.The numerical simulation and engineering example results are alike.Finally,the concept of collaborative mining has strong coupling and inclusiveness.Besides,the new concept plays a guiding role for mining complex ore bodies in China,which can better meet the mining requirements.

Cite this article

Xingxin NIE , Quan GAN , Jian GAO , Shanshan FENG . Research on Safety Roof Span in Continuous Mining of Gold Vein Group Under Synergistic Concept[J]. Gold Science and Technology, 2020 , 28(3) : 337 -344 . DOI: 10.11872/j.issn.1005-2518.2020.03.176

[an error occurred while processing this directive]

http://www.goldsci.ac.cn/article/2020/1005-2518/1005-2518-2020-28-3-337.shtml

1
陈庆发.协同采矿方法的发展及类组归属[J].金属矿山201847(10):1-6.

Chen Qingfa.Development and classification of collaborative mining methods[J].Metal Mine,201847(10):1-6.

2
陈庆发,苏家红.协同开采及其技术体系[J].中南大学学报(自然科学版)201344(2):732-736.

Chen Qingfa Su Jiahong.Synergetic mining and its technology system[J].Journal of Central South University(Science and Technology),201344(2):732-736.

3
金家聪,陈庆发.协同采矿方法的创新思维与创新技法[J].黄金科学技术201927(5):712-721.

Jin Jiacong Chen Qingfa.Innovative mindsets and innovative techniques of synergetic mining methods[J].Gold Science and Technology,201927(5):712-721.

4
罗业民,蒋文利,吴永强,等.垂直深孔阶段崩矿嗣后充填采矿法凿岩硐室结构研究[J].矿冶工程201737(1):29-30.

Luo Yemin Jiang Wenli Wu Yongqiang,et al.Structure of drilling chamber for sublevel caving with vertical deep-hole plus cut-and fill mining method[J].Mining and Metallurgical Engineering,201737(1):29-30.

5
李俊平,叶浩然,李宗利,等.二里河铅锌矿采场结构参数及巷道布置研究[J].地下空间与工程学报201915(3):902-910.

Li Junping Ye Haoran Li Zhongli,et al.Study on stope structure parameters and roadway layout of Erlihe lead-zinc mine[J].Chinese Journal of Underground Space and Engineering,201915(3):902-910.

6
胡建华,任启帆,黄仁东,等.地下矿山采场结构参数的核主成分分析法优化[J].矿冶工程201838(2):25-29,33.

Hu Jianhua Ren Qifan Huang Rendong,et al.Optimization of structural parameters of stope in underground mine with kernel principal component analysis[J].Mining and Metallurgical Engineering,201838(2):25-29,33.

7
邓红卫,杨懿全,邓畯仁,等.采空区下方高应力环境下深部矿体回采时序研究[J].黄金科学技术201725(2):62-69.

Deng Hongwei Yang Yiquan Deng Junren,et al.Study on mining sequence of deep orebody under high stress environment below goaf[J].Gold Science and Technology,201725(2):62-69.

8
白二虎,郭文兵,谭毅,等.浅埋厚煤层条带充填保水开采分析研究[J].地下空间与工程学报201915(4):1225-1231.

Bai Erhu Guo Wenbing Tan Yi,et al.Analysis on strip-filling in water preserved mining under shallow buried thick coal seam[J].Chinese Journal of Underground Space and Engineering,201915(4):1225-1231.

9
孙杨,罗黎明,邓红卫.金属矿山深部采场稳定性分析与结构参数优化[J].黄金科学技术201725(1):99-105.

Sun Yang Luo Liming Deng Hongwei.Stability analysis and parameter optimization of stope in deep metal mines[J].Gold Science and Technology,201725(1):99-105.

10
杨伟,刘长友,黄炳香,等.近距离煤层联合开采条件下工作面合理错距确定[J].采矿与安全工程学报201229(1):101-105.

Yang Wei Liu Changyou Huang Bingxiang,et al.Determination on reasonable malposition of combined mining in close-distance coal seams[J].Journal of Mining and Safety Engineering,201229(1):101-105.

11
张敏思,朱万成,侯召松,等.空区顶板安全厚度和临界跨度确定的数值模拟[J].采矿与安全工程学报201229(4):543-548.

Zhang Minsi Zhu Wancheng Hou Zhaosong,et al.Numerical simulation for determining the safe roof thickness and critical goaf span[J].Journal of Mining and Safety Engineering,201229(4):543-548.

12
张海波,宋卫东,付建新.大跨度空区顶板失稳临界参数及稳定性分析[J].采矿与安全工程学报201431(1):66-71.

Zhang Haibo Song Weidong Fu Jianxin.Analysis of large-span goaf roof instability critical parameters and stability[J].Journal of Mining and Safety Engineering,201431(1):66-71.

13
马振乾,刘勇,刘勤志,等.巷道特厚泥质顶板失稳因素分析及控制技术[J].中国安全科学学报201828(5):147-152.

Ma Zhenqian Liu Yong Liu Qinzhi,et al.Instability factors and control technology for roadway with extra thick mudstone roof[J].China Safety Science Journal,201828(5):147-152.

14
韩进仕,杨鹏帅,何佳峰,等.大理石地下开采顶板合理厚度研究[J].中国矿业201928(2):101-106.

Han Jinshi Yang Pengshuai He Jiafeng,et al.Study on reasonable thickness of roof for marble underground mining[J].China Mining Magazine,201928(2):101-106.

15
张淑坤,王树达,王来贵,等.结构面局部弱化影响下巷道围岩稳定性研究[J].中国安全科学学报201828(7):116-121.

Zhang Shukun Wang Shuda Wang Laigui,et al.Stability study of roadway surrounding rock under influence of local weakening of structural plane[J].China Safety Science Journal,201828(7):116-121.

16
陈玉民,李夕兵.海底大型金属矿床安全高效开采技术[M].北京:冶金工业出版社,2013.

Chen Yumin Li Xibing.Safe and Efficient Mining Technology for Large Metal Deposits on the Sea Floor[M].Beijing:Metallurgical Industry Press,2013.

17
钱学森.一个科学新领域——开放的复杂巨系统及其方法论[J].上海理工大学学报201133(6):526-532.

Qian Xuesen.A new field of science—An open complex giant system and its methodology[J].Journal of University of Shanghai for Science and Technology,201133(6):526-532.

18
陈祖爱,唐雯,张冬丽.系统运行绩效评价研究[M].北京:科学出版社,2009.

Chen Zu’ai Tang Wen Zhang Dongli.System Operation Performance Evaluation Research[M].Beijing:Science Press,2009.

19
聂兴信,甘泉,娄一博,等.基于协同开采理念的急倾斜薄矿脉群集群连续化回采工艺研究[J].金属矿山2019,48(9):28-33.

Nie Xingxin Gan Quan Lou Yibo,et al.Study of cluster continuous mining method with steeply inclined thin ore groups based on synergistic mining theory[J].Metal Mine,2019,48(9):28-33.

20
中华人民共和国建设部.岩土工程勘察规范:GB50021-2001[S].北京:中国建筑工业出版社,2009.

Ministry of Construction of the People’s Republic of China.Code for investigation of geotechnical engineering: GB50021-2001[S].Beijing: China Architecture & Building Press,2009.

21
中华人民共和国水利部.工程岩体分级标准:GB50 218-2014[S].北京:中国计划出版社,2014.

Ministry of Water Resources of the People’s Republic of China.Standard for engineering classification of rock mass:GB50218-2014[S].Beijing:China Planning Press, 2014.

22
《采矿设计手册》编辑委员会.采矿设计手册(井巷工程卷)[M].北京:中国建筑工业出版社,1989.

Editorial Committee of Mining Design Handbook.Mining Design Handbook(Sinking and Driving Engineering)[M].Beijing:China Architecture & Building Press,1989.

Outlines

/

[an error occurred while processing this directive]