Intelligent Mine Master Plan for Underground Metal Mine
Received date: 2019-06-28
Revised date: 2019-11-10
Online published: 2020-05-07
Low integration,poor sharing,lack of cooperation are the issue in intelligent mine construct of underground metal mine.“1145” construction idea was put forward to intelligent mine construct.Business flow and data flow as clues,construction content which cover all elements and thought-out whole flow is planed based on production technology,production management,process control,safety and environmental protection.Planning content contain information basic platform,production technology collaboration platform,intelligent mining equipment and systems,safety and environmental protection management platform,3D-visualization intelligent control platform.Industrial control network from surface to underground,wireless telecom network and data center are main construction content of information basic platform.The data of other platform and equipment operation are transmitted,stored and shared by information basic platform.Technical operation data and business flow are standardized in the production technology collaboration platform base on 3D mining software.All types technicians can use the same data on the flow.Production technology collaboration platform promotes working procedure and standardization.Production management platform takes the production process management as the core,carries out the whole process management with the production plan,plan execution and result feedback.Material consumption,assay,equipment operation are managed in the same time.Production management platform ensures betimes and sharing,it also provides basic information to manager decision.Intelligent mining equipment and systems can reduce the number of people going down the underground by introducing unmanned equipment.Intelligent mining equipment and systems can reduce the access of construction personnel to dangerous working areas by equipment reformation.Intelligent mining equipment and systems guarantee operator safe and equipment trace scheduling.Virtual simulation training technology and management system introduced in safety and environmental protection management platform.Virtual simulation training technology can effectively reduce the cost of training and improve the safety of operation training.Mobile terminal was used to record site security risk and assign people to deal with the risk in management system.The system can increase efficiency and decrease accident rate on site.The manage process was queried by system.3D digital mine model was established by GIS technology and virtual reality technology on 3D-visualization intelligent control platform.Production management data,safety and environment management data,intelligent equipment operation data was introduced in 3D-visualization intelligent control platform. 3D-visualization intelligent control platform is used to production management and Scheduling.Master plan can provide guidance for the intelligent mine construction of underground metal mine.
Xiaoming LIU , Lei DENG , Liguan WANG , Shunhua DENG , Xinfeng YANG , You WAN , Yanjun HE . Intelligent Mine Master Plan for Underground Metal Mine[J]. Gold Science and Technology, 2020 , 28(2) : 309 -316 . DOI: 10.11872/j.issn.1005-2518.2020.02.135
1 | 王金华,汪有刚,傅俊皓.数字矿山关键技术研究与示范[J].煤炭学报,2016,41(6):1323-1331. |
1 | Wang Jinhua,Wang Yougang,Fu Junhao.Crucial technology research and demonstration of digital mines[J].Journal of China Coal Society,2016,41(6):1323-1331. |
2 | 吴立新,殷作如,邓智毅,等.论21世纪的矿山——数字矿山[J].煤炭学报,2000,25(4):337-342. |
2 | Wu Lixin,Yin Zuoru,Deng Zhiyi,et al. Research to the mine in the 21st century:Digital mine[J].Journal of China Coal Society,2000,25(4):337-342. |
3 | 王李管,陈鑫.数字矿山技术进展[J].中国有色金属学报,2016,26(8):1693-1710. |
3 | Wang Liguan,Chen Xin.Advancing technologies for digital mine[J].The Chinese Journal of Nonferrous Metals,2016,26(8):1693-1710. |
4 | 王继生,潘涛.数字矿山建设实践探索[J].工矿自动化,2014,40(3):32-35. |
4 | Wang Jisheng,Pan Tao.Practical exploration on construction of digital mine[J].Industry and Mine Automation,2014,40(3):32-35. |
5 | 吴立新,汪云甲,丁恩杰,等.三论数字矿山——借力物联网保障矿山安全与智能采矿[J].煤炭学报,2012,37(3):357-365. |
5 | Wu Lixin,Wang Yunjia,Ding Enjie,et al.Thirdly study on digital mine:Serve for mine safety and intellimine with support from IoT[J].Journal of China Coal Society, 2012,37(3):357-365. |
6 | 王青,吴惠城,牛京考.数字矿山的功能内涵及系统构成[J].中国矿业,2004,13(1):7-10. |
6 | Wang Qing,Wu Huicheng,Niu Jingkao.Functions and components of a digital mine operation system[J].China Mining Magazine,2004,13(1):7-10. |
7 | 熊书敏,王李管,黄俊歆,等.地下矿可视化生产管控系统参数化数据模型[J].中南大学学报(自然科学版),2012,43(1):272-277. |
7 | Xiong Shumin,Wang Liguan,Huang Junxin,et al.Parametric data model for underground mine 3D visual production management and control system[J].Journal of Central South University Science and Technology,2012,43(1):272-277. |
8 | 张申,丁恩杰,徐钊,等.物联网与感知矿山专题讲座之二——感知矿山与数字矿山、矿山综合自动化[J].工矿自动化,2010,36(11):129-132. |
8 | Zhang Shen,Ding Enjie,Xu Zhao,et al.Part Ⅱof lecture of internet of things and sensor mine—Sensor mine,digital mine and integrated automation of mine[J].Industry and Mine Automation,2010,36(11):129-132. |
9 | 张申,丁恩杰,赵小虎,等.数字矿山及其两大基础平台建设[J].煤炭学报,2007,32(9):997-1001. |
9 | Zhang Shen,Ding Enjie,Zhao Xiaohu,et al.Digital mine and constructing of its two basic platforms[J].Journal of China Coal Society,2007,32(9):997-1001. |
10 | 王履华,孙在宏,吴长彬,等.基于Unity3D的数字矿山虚拟现实系统建设研究[J].矿业研究与开发,2014,34(1):98-101. |
10 | Wang Lühua,Sun Zaihong,Wu Changbin,et al.Study on the construction of virtual reality system for digital mine base on Unity3D[J].Mining Research and Development,2014,34(1):98-101. |
11 | 崔亚仲,白明亮,李波.智能矿山大数据关键技术与发展研究[J].煤炭科学技术,2019,47(3):66-74. |
11 | Cui Yazhong,Bai Mingliang,Li Bo.Key technology and development research on big data of intelligent mine[J].Coal Science and Technology,2019,47(3):66-74. |
12 | 吕鹏飞,何敏,陈晓晶,等.智慧矿山发展与展望[J].工矿自动化,2018,44(9):84-88. |
12 | Pengfei Lü,He Min,Chen Xiaojing,et al.Development and prospect of wisdom mine[J].Industry and Mine Automation,2018,44(9):84-88. |
13 | Li J.Intelligent mining technology for an underground metal mine based on unmanned equipment[J].Engineering,2018,4(3):381-391. |
14 | 柳波.基于PostgreSQL的智能矿山空间数据集中管理研究[J].化工矿物与加工,2019,48(2):52-56. |
14 | Liu Bo.Research on centralized management of intelligent mine spatial data based on PostgreSQL[J].Industrial Minerals and Processing,2019,48(2):52-56. |
15 | Gustavsson M,S?rnholm E,Stigsson P,et al.Energy Scenario for Sweden 2050 Based on Renewable Energy Technologies and Sources[M].Sweden:IVL Swedish Environmental Research Institute,2011. |
16 | Kagermann H,Wahlster W,Helbig J.Securing the Future of German Manufacturing Industry:Recommendations for Implementing the Strategic Initiative INDUSTRIE4.0[M].Berlin:National Academy of Science and Engineering,2013. |
17 | Wang L H.From intelligence science to intelligent manufacturing[J].Engineering,2019,5(4):615-618. |
18 | 吴澄,孙优贤,王天然,等.信息化与工业化两化融合战略研究:中国工业信息化的回顾、现状及发展预见[M].北京:科学出版社,2013. |
18 | Wu Cheng,Sun Youxian,Wang Tianran,et al.Strategy Research on Integration of Informatization and Industrialization:Review,Status Quo and Development Foresight of China’s Industrial Informatization [M].Beijing:Science Press,2013. |
19 | 周剑.企业两化融合管理体系构建研究[J].现代产业经济,2013(11):16-26. |
19 | Zhou Jian.Research on enterprise management system construction for integration of informatization and industrialization[J].Modern Industrial Economy,2013(11):16-26. |
20 | 周剑.两化融合管理体系构建[J].计算机集成制造系统,2015,21(7):1915-1929. |
20 | Zhou Jian.Management system construction for integration of informatization and industrialization[J].Computer Integrated Manufacturing Systems,2015,21(7):1915-1929. |
21 | 毕林,王晋淼.数字矿山建设目标、任务与方法[J].金属矿山,2019,48(6):148-156. |
21 | Bi Lin,Wang Jinmiao.Construction target,task and method of digital mine[J].Metal Mine,2019,48(6):148-156. |
22 | Kapageridis I.The future of mine planning software - New Tools and Innovations[EB/OL].,2005-01. |
/
〈 | 〉 |