[an error occurred while processing this directive] [an error occurred while processing this directive]
[an error occurred while processing this directive]Investigation and Optimization of Processing Flowsheet for a Luoba Lead-zinc Mine in Gansu Province
Received date: 2018-03-21
Revised date: 2019-04-25
Online published: 2019-11-07
The lead and zinc mineral resources are very abundance in China,but the lead-zinc metal quantity is much short for further mining.The resources are not of natural endowment,with difficulty of utilization.Type of lead-zinc deposit is variety and associated elements are rich.Sulfide minerals have similar interface properties and are difficult to separate.Widespread as the occurrence of resource is,the ores are mostly very low-grade,complexity of multi-components and difficult of separation.All of this up make it difficult to recover such resources efficiently and comprehensively.It is necessary to carry out systematic process optimization and technical research in order to improve the comprehensive utilization.The Luoba lead-zinc deposit in Gansu Province is a mudstone-fine clastic lead-zinc deposit,associated with a small amount of silver and sulfur.With the long-term exploitation and utilization,the valuable metal content of lead and zinc in the ore decreases,while the content of carbonaceous and siliceous minerals increases,which brings great interference to the separation and recovery of lead and zinc.There are some problems in lead and zinc concentrate production,such as lead concentrate grade decrease,zinc concentrate containing excessive silicon.As a result,the present mineral processing technology and reagent system can’t adapt to the change of ore properties well.Therefore,a systematic process optimization and technical research should be carried out to find out the quality decline of concentrate and the possible problems in the process of concentration,and to explore the difficulties and physical factors in the recovery of lead and zinc flotation,so as to improve the comprehensive utilization level of resources.On the basis of detailed understanding of mineral processing technology and production status,an overall processing flowsheet investigation was conducted.It has been studied that the technical parameters and production conditions of each operation of grinding and floating process.Then the distribution of useful and harmful elements was identified.The problems existing in the production process were analyzed,the physical factors concerning the grade and quality of lead and zinc concentrate were proved.Then put forward a specific improvement program in order to optimize the existing process and technical conditions,and to provide a high efficiency foundation for carbolic lead-zinc resources recovery.The results show that the carbonaceous minerals,such as aphanitic graphite,are of high content in the ore.It is easy to be mud in the grinding process,and has good floatability and adsorption performance.Because of the interaction between the carbonaceous minerals and lead-zinc minerals,the adsorbing quantity of collectors for the lead-zinc minerals in slurry system was less than that of collectors without carbonaceous minerals.The carbonaceous minerals,such as aphanitic graphite,finally entered the concentrates,affecting the recovery and quality of lead and zinc minerals.High-alkali speed flotation technology,has solved the concentration recovery of lead and zinc mineral.But the content of silicon and carbon in lead and zinc concentrates is high. So,it needs to search some appropriate inhibitors in the separation process,to strengthening inhibition of zinc-sulfide minerals.At the same time,it is necessary to appropriately optimize the parameters of grinding process,to reduce the degree of argillation of the carbonaceous and siliceous gangue minerals.In order to improve the grade and quality of lead and zinc concentrate,it is necessary to find suitable collectors and reduce the viscosity of flotation foam.Through put forward a specific improvement program in order to optimize the existing process and technical conditions,and to provide a high efficiency foundation for carbolic lead-zinc resources recovery.
Hepeng ZHOU , Jie HU , Chaoyang DUAN , Pan DENG , Zhigang ZHONG , Yongbing ZHANG . Investigation and Optimization of Processing Flowsheet for a Luoba Lead-zinc Mine in Gansu Province[J]. Gold Science and Technology, 2019 , 27(5) : 696 -703 . DOI: 10.11872/j.issn.1005-2518.2019.05.696
| 1 |
文金磊,朱一民,周菁,等.铅锌矿产资源特征及浮选工艺研究现状[J].矿产综合利用,2015(6):1-6.
|
| 2 |
国土资源部.中国矿产资源报告[R].北京:地质出版社,2017:3-4.
Ministry of Land and Resources.China mineral resources report[R].Beijing:Geological Publishing House,2017:3-4.
|
| 3 |
薛亚洲,王海军.我国铅锌矿资源综合利用现状[J].中国矿业,2005,14(8):41-42.
|
| 4 |
磨学诗,黄伟中,张雁生,等.提高多金属硫化铅锌矿浮选指标的研究[J].有色金属(选矿部分),2007(1):9-12.
|
| 5 |
|
| 6 |
姜美光,刘全军,杨俊龙,等.新疆某硫化铅锌矿选矿试验研究[J].矿冶,2014,23(1):26-30.
|
| 7 |
丘学民,陈国宝,张勤,等.从超细粒高铅锌氰化尾渣中浮选回收有价金属的试验研究[J].黄金科学技术,2017,25(6):61-67.
|
| 8 |
邱廷省,何元卿,余文,等.硫化铅锌矿浮选分离技术的研究现状及进展[J].金属矿山,2016,45(3):1-9.
|
| 9 |
焦学尧,樊小龙,余平辉,等.甘肃厂坝铅锌矿床黄铁矿流体包裹体He-Ar同位素体系[J].黄金科学技术,2016,24(4):47-53.
|
| 10 |
张培鼎,严维良.白石嶂钼矿3 kt/d选厂选矿工艺流程的分析[J].有色金属工程,2011,1(4):24-28.
|
| 11 |
焦科诚.云南羊拉某低品位细粒级难选铜矿选矿试验研究[J].有色矿冶,2013,29(1):23-26.
|
| 12 |
|
| 13 |
方夕辉,曾怀远,陈文亮,等.新疆某复杂低品位氧化铅锌矿选矿工艺[J].有色金属工程,2014,4(2):49-53.
|
| 14 |
陈启如,孙广周,黄斌,等.云南某地硫化铅锌矿优先浮选分离试验研究[J].矿产综合利用,2018(4):62-66.
|
| 15 |
雷阿丽,吴彩斌,江领培.某低品位伴生银铅锌多金属矿选矿工艺试验研究[J].黄金科学技术,2018,26(2):212-218.
|
| 16 |
罗仙平,王金庆,曹志明,等.浮选粒度及浓度对铅锌硫化矿浮选分离的影响[J].稀有金属,2018,42(3):307-314.
|
| 17 |
于涛.一段闭路磨矿分级旋流器与分级机的工业实践[C]//全国矿山采选技术进展报告会.呼和浩特:全国冶金矿山信息网,2006.
|
| 18 |
沈同喜,余新阳.江西某铅锌多金属硫化矿石选矿试验研究[J].有色金属科学与工程,2012,3(2):71-75.
|
| 19 |
魏宗武,陈建华,艾光华,等.硫化铅锌矿无氰浮选工艺流程及技术进展[J].矿产保护与利用,2007(4):39-44.
|
| 20 |
肖骏,陈代雄,杨建文,等.凡口铅锌矿铅锌硫混合精矿分离试验研究[J].有色金属科学与工程,2015,6(2):104-110.
|
| 21 |
余新阳,王浩林,王强强,等.江西某伴生银难选铅锌矿浮选分离[J].有色金属工程,2016,6(5):49-54.
|
| 22 |
常富强,段德华,宋龑.生产中提高球磨机磨矿效率的方法[J].现代矿业,2011(3):81-84.
|
| 23 |
周贺鹏,雷梅芬,罗礼英,等.广西某铜铋硫化矿选矿新工艺研究[J].矿业研究与开发,2013,33(1):52-55.
|
| 24 |
贺国帅,陈代雄,杨建文,等.湖南鲁塘隐晶质石墨矿选矿试验研究[J].矿产保护与利用,2018(5):63-67.
|
/
| 〈 |
|
〉 |