In recent years,due to the impact of Fukushima nuclear leakage accident,the price of natural uranium has continued to decline,and more and more uranium mines have gradually attached importance to the utilization of resources.Muckpile is the smallest mining unit in open-pit mine.Finding out the grade distribution in muckpile is very important for blasting charge,network connection design,ore block design and shoveling operation.At the same time,it is very important to reduce dilution and loss and improve resource utilization. Grade estimation of muckpile is an extremely important routine work in open-pit uranium mines.In order to get the grade estimation results quickly and accurately,the basic principles of the nearest neighbor method,the inverse distance weighted method and the ordinary Kriging method are introduced.Taking a foreign uranium mine as an example,the bench height of the open-pit uranium mine is 7.5 m.The bench is divided into several muckpiles by single bench mining.The blasting hole grid is about 6 m×6 m.Gamma logging is used to obtain the grade information of each blasting hole in the ore-bearing muckpile.The logging interval is 0.1 m,that is,the original sample length is 0.1 m,and Gamma logging is not carried out in the pure waste muckpile.Using three-dimensional mining software,four muckspiles were selected to carry out grade estimation experiments.Based on the estimation results of the ordinary Kriging method,the deviation,statistics and graphical analysis of the estimation results of the nearest neighbor method and the inverse distance weighted method were carried out successively.The results show that the deviation of the inverse distance weighted method is generally smaller than that of the ordinary Kriging method in ore quantity and average grade,the maximum deviation of ore quantity is only 6.19%,while that of the nearest neighbor method is generally larger,and the maximum deviation of ore quantity is 27.6%.The accuracy of the nearest neighbor method is close to that of the ordinary Kriging method,and the accuracy of estimation meets the requirements of actual production of mines.It can be used to estimate the grade of muckpile.However,the nearest neighbor method has a relatively poor estimation accuracy and can not be used to estimate the grade of muckpile.The inverse distance weighted method,as a grade estimation method of muckpile,has a simple operation process and relatively definite parameters,which can save a lot of time while satisfying the requirement of estimation accuracy.The research results can provide guidance and reference for similar open-pit uranium mines to estimate the grade of muckpile.
Qiren TAN , Wenming DONG , Lin BI , Xingqi CAI , Xiaohu MIAO . Study on Optimization of Grade Estimation Method of Muckpile in Open-pit Uranium Mine[J]. Gold Science and Technology, 2019 , 27(4) : 573 -580 . DOI: 10.11872/j.issn.1005-2518.2019.04.573
| 1 |
徐浩,任忠宝,刘鑫扬 .全球铀矿生产成本及供需形势展望[J].矿业研究与开发,2019,39(10):1-5.
|
| 2 |
刘悦,丛卫克 .世界铀资源、生产及需求概况[J].世界核地质科学,2017,34(4):200-206.
|
| 3 |
李强,王建平,徐千琰 .世界铀资源概况及供需形势展望[J].中国矿业,2013,22(11):13-18.
|
| 4 |
刘占宁,宋宇辰,孟海东,等 .块体尺寸和估值方法对矿石品位估值的影响[J].矿业研究与开发,2018,38(6):89-93.
|
| 5 |
谢伟 .三维软件常用品位估值方法介绍[J].科技视界,2016(10):225,240.
|
| 6 |
柯丽华,何扬扬,张光权,等 .乌龙泉矿距离幂次反比法品位估值参数优化[J].金属矿山,2018,47(7):147-151.
|
| 7 |
刘占宁,宋宇辰,孟海东,等 .样本点与距离权重对距离幂次反比法的影响[J].矿业研究与开发,2018,38(9):94-99.
|
| 8 |
赵华杰 .基于地质统计学的采空区储量估算[J].西安科技大学学报,2019,39(3):492-497.
|
| 9 |
田维 .基于距离幂反比法的新疆黄土坡铜锌矿品位估算应用研究[J].中国矿山工程,2018,47(5):14-18.
|
| 10 |
荆永滨,孙光中,毕林 .基于空间结构性的距离幂次反比法品位估值研究[J].地质科技情报,2018,37(2):215-220.
|
| 11 |
崔年生 .泰森多边形法在露天矿爆区矿岩划分中的应用[J].采矿技术,2018,18(2):70-73.
|
| 12 |
周坤,郑立明 .最近距离法在贵金属矿体圈定中的应用——以南非某层状铂矿为例[J].黄金科学技术,2013,21(3):55-58.
|
| 13 |
邓勇,庄世勇,洪求友,等 .基于DIMINE软件的某铁矿地质建模及储量估算[J].地质学刊,2018,42(2):305-311.
|
| 14 |
吴健飞,叶义成,王其虎,等 .某多层复杂矿床开采优化的三维地质建模[J].金属矿山,2012,41(9):124-128.
|
| 15 |
刘佶林,杨忠,王孝东,等 .普通克里格法在铜曼矿区储量估算中的应用[J].有色金属(矿山部分),2019,71(1):48-53.
|
| 16 |
邓丹 .地质统计学在矿床品位估算中的应用研究[J].世界有色金属,2018(13):297-298.
|
| 17 |
杨程 . 基于地质统计学的金堆城钼矿矿床品位分布研究[D].西安建筑科技大学,2010.
|
| 18 |
王瑞,李亮,周大伟,等 .地质统计学在稀土矿储量计算研究应用[J].稀土,2019,40(2):35-41.
|
| 19 |
图雅,巴图德力格尔,阿拉腾图雅,等 .人口分布空间化方法对比分析——以内蒙古东部区为例[J].阴山学刊(自然科学),2012,26(3):45-49.
Tuya,Batudleiger,Alatentoya,et al . A comparative analysis of space to method of population distribution for example eastern region of Inner Mongolia[J]. Yinshan Academic Journal(Natural Science Edition),2012,26(3):45-49.
|
| 20 |
吴炳生 .福建某铜矿床三维地质建模及资源量估算[D].北京:中国地质大学(北京),2014.
|
/
| 〈 |
|
〉 |