[an error occurred while processing this directive]Method for Repairing Collapse of Orepass Wall Based on Double-Controlled Tension Cable Bundles
Received date: 2018-03-26
Revised date: 2018-08-23
Online published: 2019-01-24
The orepass is an important project to slide ore,its structure is simple and convenient to use,but after long-tern use,because the ore constantly impact and wear the orepass wall,it is easy to occur the phenomenon of orepass wall collapses.For most mines,there are some difficulties in the maintenance and repair of chute,so it is necessary to choose a safe,effective and reliable technical scheme for chute reinforcement.Aiming at of the disadvantage of existing support methods that occupying the chute with long construction time,a technical proposal for the integrated reinforcement using double-controlled tension cable bundles from the periphery of ore pass to the inside of it was proposed,and the principle of its action is also described.By establishing the mechanical model of double-controlled tension cable bundles,the design method of cable load that satisfied the safety factor was analyzed.Combined with field engineering practice and monitoring data analysis,it’s proved that the double-controlled tension cable bundles can make the collapsed wall stable for a long time after being reinforced,and can save plenty of repairing time by reducing the occupancy of the ore pass.The method for repairing collapse of ore pass wall based on double-controlled tension cable bundles provides a feasible way to solve the problem of repairing large-scale collapse of the ore pass wall in a safe and efficient way.
Xiushan QIN , Hui CAO , Ye YUAN , Zhijie ZHENG . Method for Repairing Collapse of Orepass Wall Based on Double-Controlled Tension Cable Bundles[J]. Gold Science and Technology, 2018 , 26(6) : 744 -749 . DOI: 10.11872/j.issn.1005-2518.2018.06.744
| 1 |
王青,任凤玉 .采矿学[M].北京:冶金工业出版社,2011.
|
| 2 |
周昌达 .井巷工程[M].北京:冶金工业出版社,1994:62-90.
|
| 3 |
张生,马海涛,王虎 .安徽开发矿业有限公司3#主溜井治理方案研究[J].中国安全生产科学技术,2014,10(增):276-281.
|
| 4 |
明世祥 .地下金属矿山主溜井变形破坏机理分析[J].金属矿山,2004,34(1):5-8.
|
| 5 |
高义军,吕力行 .溜井破坏因素及防治加固措施[J].矿冶,2013,22(2):44-48.
|
| 6 |
宋卫东,王洪永,王欣,等 .采区溜井卸矿冲击载荷作用的理论分析与验证[J].岩土力学,2011,32(2):328-332.
|
| 7 |
宋学杰,张平 .主溜井坍塌后的恢复治理及防治措施[J].黄金,2014,35(6):43-46.
|
| 8 |
康武雄 .锰钢板在矿山溜井支护中的应用效果[J].甘肃冶金,2011,33(3):38-42.
|
| 9 |
高永涛,王金安,宋卫东,等 .一种治理主溜井特大塌方的新方法——托斗法[J].岩石力学与工程学报,2002,21(4):540-545.
|
| 10 |
付常鹏,黄永庆,戚克辉,等 .新城金矿盲竖井矿石溜井塌方段快速修复施工技术与实践[J].矿业工程,2015,13(4):18-20.
|
| 11 |
李长洪,蔡美峰,乔兰,等 .某矿主溜井塌落破坏成因分析及其防治对策[J].中国矿业,1999,8(6):37-39.
|
| 12 |
曹志松 .某矿风井井壁破坏原因分析与修复[J].矿业工程,2014,12(6):65-67.
|
| 13 |
迟兵,吕力行 .大红山铜矿主溜井安全处理措施[J].矿冶,2013,22(1):37-39.
|
| 14 |
|
| 15 |
|
| 16 |
|
| 17 |
高义军,吕力行 .高深溜井反漏斗柔性防护方法[J].矿冶,2012,21(1):8-10.
|
| 18 |
蔡美峰 .岩石力学与工程[M].北京:科学出版社,2002.
|
| 19 |
河南省地质局地质三队 .河南省栾川县三道庄钼矿详细勘探地质报告[R].郑州:河南省地质局地质三队,1980.
Third Geological Survey Team of Henan Bureau of Geology and Mineral Resources .Detailed exploration geological report of Sandaozhuang molybdenum deposit,
|
| 20 |
中华人民共和国水利部 .工程岩体分级标准:GB50218-94[S].北京:中国计划出版社,1995.
The Ministry of Water Resource of the People’s Republic of China .Standard for engineering classification of rock mass:GB50218-94[S].Beijing:China Planning Press,1995.
|
/
| 〈 |
|
〉 |