[an error occurred while processing this directive] [an error occurred while processing this directive]
[an error occurred while processing this directive]Simulation and Evaluation of Engineering Response Under the Mining of Overlapping-Orebody
Received date: 2017-07-10
Revised date: 2017-10-31
Online published: 2019-01-24
The interaction and response law of overlapping-orebody mining are important factors that have significant influence on mining safety.The overlapping-orebody of Huashugou copper mine in Jingtieshan area where the upper iron orebody adjoins the under copper orebody was chosen as the research objects.Based on the coupled 3D Mine-Midas-FLAC3Dtechnology,combined with practical mining and filling process of the mine,a numerical analysis model for the response of FeV orebody engineering under the condition of copper orebody in the filling section was established.Then the data including displacement and stress of stoping tunnel of FeV orebody were obtained and were used to analyze the mining process of FeV orebody.Results show that maximum excavating perturbation during mining and filling process of research area occurs in 2 865 m stoping tunnel,and the maximum displacement is 2.3 cm,the maximum amplitude of stress is 11.34% and the maximum shear stress is 1.27 MPa,respectively.TheZaxis stress in the center of cavity roof remains decreasing,and it transfers to all round.The shear stress in the center of cavity roof keeps unchanged while it around the edge of cavity changes drastically.During the mining process of test stope,2 880 m and 2 895 m stoping tunnel above FeV orebody are in steady state.Consequently,stoping process can be accelerated to boost productivity,so as to improve the recovery rate of ore.
Jianhua HU , Chen GAO , Chun YANG . Simulation and Evaluation of Engineering Response Under the Mining of Overlapping-Orebody[J]. Gold Science and Technology, 2018 , 26(6) : 736 -743 . DOI: 10.11872/j.issn.1005-2518.2018.06.736
| 1 |
胡建华,雷涛,周科平,等 .基于采矿环境再造的开采顺序时变优化研究[J].岩土力学,2011,32(8):2517-2522.
|
| 2 |
胡建华,苏家红,周科平,等 .顶板诱导崩落模式选择时变数值分析[J].岩土力学,2008,29(4):931-936.
|
| 3 |
王永年,殷世华 .岩土工程安全监测手册[M].北京:中国水利水电出版社,1999.
|
| 4 |
周科平 .采矿过程模拟与仿真[M].长沙:中南大学出版社,2012.
|
| 5 |
张向东,黄宇,谷文军 .隧道围岩施工监测及位移动态模拟分析[J].世界科技研究与发展,2011,33(6):952-954.
|
| 6 |
张春刚 .桩锚支护深基坑监测数据分析及FLAC数值模拟[D].北京:中国地质大学,2011.
|
| 7 |
马凤山,郭捷,李克蓬,等 .三山岛海底金矿开采充填体与顶板岩层的变形监测研究[J].黄金科学技术,2016,24(4):66-72.
|
| 8 |
李克蓬,马凤山,郭捷,等 .三山岛海底金矿开采充填体与围岩变形规律的数值模拟[J].黄金科学技术,2016,24(4):73-80.
|
| 9 |
吴意谦,朱彦鹏 .兰州市湿陷性黄土地区地铁车站深基坑变形规律监测与数值模拟研究[J].岩土工程学报,2014,36(增2):404-411.
|
| 10 |
李四维,高华东,杨铁灯 .深基坑开挖现场监测与数值模拟分析[J].岩土工程学报,2011,33(增1):291-298.
|
| 11 |
吴姗,宋卫东,杜建华,等 .高陡边坡下充填法开采挂帮矿稳定性数值模拟与安全监测[J].采矿与安全工程学报,2013,30(6):874-879.
|
| 12 |
白永健,郑万模,邓国仕,等 .四川丹巴甲居滑坡动态变形过程三维系统监测及数值模拟分析[J].岩石力学与工程学报,2011,30(5):974-981.
|
| 13 |
|
| 14 |
|
| 15 |
|
| 16 |
周科平,杜相会 .基于3DMINE-MIDAS/GTS-FLAC3D耦合的残矿回采稳定性研究[J].中国安全科学学报,2011,21(5):17-22.
|
| 17 |
曾庆田,刘科伟,严体,等 .基于多数值模拟方法联合的自然崩落法开采研究[J].黄金科学技术,2015,23(1):66-73.
|
| 18 |
邓红卫,郭旺,周科平,等 .基于FLAC3D稳定性分析的残矿回采方案研究[J].金属矿山,2011,40(12):18-21.
|
| 19 |
邓红卫,杨懿全,邓畯仁,等 .采空区下方高应力环境下深部矿体回采时序研究[J].黄金科学技术,2017,25(2):62-69.
|
| 20 |
闫长斌,徐国元,李夕兵 .爆破震动对采空区稳定性影响的FLAC3D分析[J].岩石力学与工程学报,2005,24(16):2894-2899.
|
/
| 〈 |
|
〉 |