img

Wechat

Adv. Search

Gold Science and Technology ›› 2013, Vol. 21 ›› Issue (2): 69-72.

Previous Articles     Next Articles

The Application of Multi Mining Area Filling Systems Integration and Improving the Efficiency of Production Mode in Jiaojia Gold Mine

YANG Jiguang,WANG Haitao,LIU Wenzhong   

  1. Jiaojia Gold Mine,Shandong Gold Group(Laizhou) Co.,Ltd.,Laizhou   261441,Shandong,China
  • Received:2012-09-22 Revised:2013-02-04 Online:2013-04-28 Published:2013-09-17

Abstract:

At present,because the surface of a plurality of small mine which surround around the Jiaojia gold main mining area is not allowed to collapse,there are a series of problems,such as filling preparation difficult,low efficiency and high production costs,etc.This paper expounds the mode that use the mature cemented filling system of the main mining area for the main mining area and surrounding small mining area filling service.At the same time,by focusing for sand,sand storage,centralized filling,completely solve the disadvantage of the surrounding small mine filling preparation system.The successful application of the model provides protection for mining enterprises making full use of resources and exploitation of resources,improves the economic and social benefits,and provides a reference for other mines.This model has a good application prospect.The effect is significant.

Key words: Multi mining area, Filling system, Integration efficiency

CLC Number: 

  • TD863

[1] 辛洪波,邓军,王建国,等.山东焦家金矿新、老Ⅲ号脉数学地质分析[J].黄金科学技术,2005,13(3):1-6.
[2] 丁式江,翟裕生,邓军.胶东焦家金矿蚀变岩石元素的质量迁移[J].地质与勘探,2000,36(4):28-31.
[3] 杨纪光.下向进路假底胶结充填采矿法在焦家金矿的应用[J].黄金科学技术,2011,19(5):33-36.
[4] 冶金部矿冶研究总院采矿室充填组.焦家金矿立式砂仓充填系统和采矿方法的研究[J].有色金属(矿山部分),1982,(2):13-16,25.
[5] 李秀琴.山东焦家金矿Ⅲ号矿脉群地质特征及赋存规律[J].西安工程学院学报,2000,22(1):38-41.
[6] 庞绪成,王玉平,郑广玉,等.焦家金矿床成矿元素富集及成因分析[J].黄金科学技术,2003,11(2):15-19.
[7] 张锐,曾庆栋.焦家矿3#脉动成矿规律探讨[J].黄金科学技术,2004,12(2):16-21.
[8] 赵鹏沄,顾雪祥,邓小华.山东焦家金矿矿床成因及成矿模式[J].地质与勘探,2007,43(4):29-35.
[9] 周爱民.矿山废料胶结充填(第2版)[M].北京:冶金工业出版社,2007.
[10] 曹英莉,秦秀合,张瑞忠,等.夏甸金矿水平分层进路式尾砂充填采矿法的研究与应用[J].黄金科学技术,2012,20(2):62-66.
[11] 谢振华,宋存义.工程流体力学(第3版)[M].北京:冶金工业出版社, 2007.
[12] 《采矿手册》编辑委员会.采矿手册(第4卷)[M].北京:冶金工业出版社,1990.
[13] 国家安全生产监督管理总局.GB16423-2006金属非金属矿山安全规程[S].北京:中国标准出版社,2006.
[14] 孙恒虎,刘文永,杨宝贵,等.充填采矿新模式——高水固结充填采矿法 [J].有色金属(矿山部分),1996,(3):5-8.

[1] LI Cong,CHEN Jianhong. Risk Evaluation Research of Uranium Resources Overseas Investment Projects Based on VIKOR Algorithm [J]. Gold Science and Technology, 2014, 22(6): 60-64.
[2] LI Xiangwen,ZHANG Hengzhi,SHI Yongwen,YAN Yongsheng. Study on the Problems of Environmental Engineering Geology in Shabaosi Gold Deposit,Heilongjiang Province [J]. J4, 2011, 19(6): 75-78.
[3] LIU Chuan. Technical Measures of Raising the Grade of Withdrawal of Ore in Yunxi Mining Area [J]. J4, 2004, 12(3): 28-31.
[4] XIONG Gang. THE USEFUL OF TETHNOLOGY OF ELECTRIC CONTROL IN MIES RAISED SYSTEM XIONG GANG [J]. J4, 2003, 11(4): 35-37.
[5] LI Yong,SONG Weidong,YUE Faqiang,ZHANG Rui,ZHANG Pingshun. APPLICATION OF FUZZY AND COMPREHENSIVE EVALUATION IN THE OPTIMIZATION OF MINE OUTPUT [J]. J4, 2003, 11(3): 35-38.
[6] ZHANG Bingxu,HAN Hongjiang. EXPERIMENTAL RESEARCH AND ENGINEERING PRACTICE OF MINING METHOD ABOUT DAZHUANGZI GOLD MINE [J]. J4, 2003, 11(1): 28-32.
[7] WANG Chaoyang. THE DISCREPANCY ESTIMATION AND IMPLEMENTATION OF THE LARGE2SCALE MEETING HEAD-ON PROJECT IN LINGLONG GOLD MINE [J]. J4, 2002, 10(4): 17-21.
[8] . [J]. J4, 2001, 9(6): 11-14.
[9] CAI Baoqing,FAN Manhua. COMPRENHENSIVE ASSESSMENTS OF STOPE SUPPORT TECHNIQUES IN GOLD MINE [J]. J4, 2001, 9(6): 30-35.
[10] LI Qiutao,WEI Minghao,LIU Tanzhou,JIANG Yanan,WANG Zhiyuan. Research on Mining Pressure Control Method in Jinqingding Mine [J]. J4, 2011, 19(1): 80-82.
Viewed
Full text


Abstract

Cited

  Shared   
  Discussed   
No Suggested Reading articles found!