THE DISCREPANCY ESTIMATION AND IMPLEMENTATION OF THE LARGE2SCALE MEETING HEAD-ON PROJECT IN LINGLONG GOLD MINE

WANG Chaoyang   

  1. Linglong Gold Mine , Shandong Zhaoyuan 265409 , China
  • Received:2002-05-23 Revised:2002-05-21 Online:2002-08-28 Published:2012-05-30

Abstract:

This thesis points out the urgency of the - 230 large-scale meeting head-on project in Linglong Gold Mine. Int roduces in detail a kind of survey scheme-additnonal surveying of gyrocompassing side in t raversing , as well as discrepancy estimation for the survey scheme. Through explainaiton of the discrepancy estimation ,proves feasibility and superiority of the survey scheme. And also describes the implemtation and achivements of the meeting head-on project under the guidance of the scheme ,stressing the importance of additional surveying of gyrocompassing side in traversing in the large-scale meeting head-on project of mine.

Key words: additional surveying gyrocompassing side, discrepancy estimation, implementation of meeting head-on

CLC Number: 

  • TD863


[1 ]  周立吾,章国良,林家聪. 矿山测量学(第一分册)
[M] . 北京:中国矿业学院出版社,1989.

[2 ]  国家黄金管理局. 岩金矿山地质与测量工作条例. 1989.

[1] LIU Chuan. Technical Measures of Raising the Grade of Withdrawal of Ore in Yunxi Mining Area [J]. J4, 2004, 12(3): 28-31.
[2] ZHANG Bingxu,HAN Hongjiang. EXPERIMENTAL RESEARCH AND ENGINEERING PRACTICE OF MINING METHOD ABOUT DAZHUANGZI GOLD MINE [J]. J4, 2003, 11(1): 28-32.
[3] . [J]. J4, 2001, 9(6): 11-14.
[4] CAI Baoqing,FAN Manhua. COMPRENHENSIVE ASSESSMENTS OF STOPE SUPPORT TECHNIQUES IN GOLD MINE [J]. J4, 2001, 9(6): 30-35.
[5] LI Qiutao,WEI Minghao,LIU Tanzhou,JIANG Yanan,WANG Zhiyuan. Research on Mining Pressure Control Method in Jinqingding Mine [J]. J4, 2011, 19(1): 80-82.
Viewed
Full text


Abstract

Cited

  Shared   
  Discussed   
No Suggested Reading articles found!