img

Wechat

Adv. Search

Gold Science and Technology ›› 2021, Vol. 29 ›› Issue (3): 449-456.doi: 10.11872/j.issn.1005-2518.2021.03.200

• Mining Technology and Mine Management • Previous Articles    

Development and Application of Collaborative Platform for Mine Production Technology

Xin CHEN1(),Feng GAO2,Xionghui XIE3,Du MAO1,Tianyi MA1   

  1. 1.Changsha Digital Mine Co. ,Ltd. ,Changsha 410083,Hunan,China
    2.Xinjiang Habahe Ashele Copper Industry Co. ,Ltd. ,Habahe 836700,Xinjiang,China
    3.Zijin Mining Group Co. ,Ltd. ,Shanghang 364200,Fujian,China
  • Received:2020-11-21 Revised:2021-01-29 Online:2021-06-30 Published:2021-07-14

Abstract:

With the widely application of CAD and various mining softwares,new problems have arisen in mine production technology management and teamwork.Most mines now have accumulated data with TB magnitude and all kinds of data are not effectively digitized,which bring difficulties to information search and limite the flowing and sharing of data.In addition,with the continuous acceleration of mine informatization and intelligentization,many mining enterprises have gradually established various systems.Data between different systems is not fully and efficiently utilized.In the process of production management,data between each operation and technical link need to be submitted,sorted,summarized and approved manually,which result in low efficiency of technical cooperation.By analyzing the status of mine production technology,the concept of mining production technology collaboration was put forward.The key problems to be solved in mine production technology collaboration were clarified,and the system structure,main functions and construction value of mine production technology collaboration platform were expounded in detail.Mine production technology collabora-tion platform provides functions such as work flow,to-do list prompting,data submitting and updating,online previewing and approving.The platform have been successfully applied in an underground copper mine in Xinjiang,which contains 133 standardization of business data and 39 normalization of business processes.After the platform came into effect,business data was stored and accessed from data center.Business approval was transformed from manual to process-driven,and the data preparation time of technical personnel before processing business was greatly reduced.It made efficiently flowing and sharing of mine production technical data came true,and improved technical management and teamwork efficiency,and as a bridge to realize the seamless docking and deep integration between mining tool software,production execution system and 3D visualization control system.It can provide a reference for full life cycle business process collaboration,big data analysis and intelligent control system construction.

Key words: production technology collaboration, data standardization, flow normalization, double drive, central database, working environment, deep integration

CLC Number: 

  • TD672

Fig.1

Overall architecture of cooperative platform for mine production technology"

Table 1

Standardize business data"

业务类别业务数据
测量(共8个)地形等高线
道路边线
地表测点
地质(共21个)探矿孔轨迹线
探矿巷设计中心线
探矿巷设计模型
采矿(共10个)采场模型
开拓巷道设计中心线
开拓巷道设计模型

Table 2

Normalized business flow"

业务类别业务流程
测量(共33个)地形测量
井巷工程实测
空区测量
地质(共68个)巷道编录
地质业务模型建模
储量升级估算
采矿(共32个)开拓设计
单体设计
布孔爆破设计

Fig.2

Business flow definition"

Fig.3

To-do business list prompting"

Fig.4

Automatic loading of business data"

Fig.5

Online preview and approval"

Baram A,Fogel E,Halperin D,al et,2018.Exact Minkowski sums of polygons with holes[J].Computational Geometry:Theory and Applications,73:46-56. .
Bi Lin,Wang Jinmiao,2019.Construction target,task and method of digital mine[J].Metal Mine,38(6):148-156.
Bi Lin,Zhao Hui,Jia Mingtao,2016.Database-oriented storage based on LMDB and linear octree for massive block model[J].Transactions of Nonferrous Metals Society of China,26(9):2462-2468.
Cao Yingli,2019.Application of 3D laser scanning technology in mine survey[J].World Nonferrous Metals,(21):14-15.
Chen Xin,Wang Liguan,2016.3D laser equidistant scanning method from single station and efficient modeling algorithm for mine goaf [J].Journal of China University of Mining & Technology,45(4):836-842.
Duan Ping,Li Jia,Li Haikun,al et,2020.3D modeling method of UAV image point cloud and ground laser point cloud registration[J].Engineering of Surveying and Mapping,29(4):44-47.
Gu Q H,Lu C W,Li F B,al et,2008.Monitoring dispatch information system of trucks and shovels in an open pit based on GIS/GPS/GPRS[J].Journal of China University of Mining & Technology,(2):288-292.
James H,Ajith K P,Jennifer S,2019.A building information modelling approach to the alignment of organisational objectives to Asset Information Requirements[J].Automation in Construction,104(3):14-26.
Kong K H,Chong W T,Koh V L,2019.Human behaviour-dependent and variable-flow-reversible mechanical ventilation system design in an underground parking facility[J].Indoor and Built Environment,28(10):1324-1340.
Liu Siquan,2019.Application of GPS-RTK technology in mine survey[J].World Nonferrous Metals,(20):56-58.
Liu Zhanning,Song Yuchen,Meng Haidong,al et,2018.The influences of block size and estimation methods on the valuation of ore grade[J].Mining Research and Development,38(6):89-93.
Luo Yao,Mo Wenbo,Yan Zike,2020.Research on fusion technology of tile photogrammetry and BIM 3D modeling[J].Journal of Geomatics,45(4):40-45,126.
Pan Y,Liang C J,Dong L,2019.A two-stage model for an urban underground container transportation plan problem[J].Computers & Industrial Engineering,138:106113.
Pu Hao,Song Zhanfeng,Zhan Zhenyan,2005.3D-modelling for roads based on constrained Delaunay triangulation[J].Journal of Huazhong University of Science and Technology (Nature Science Edition),(6):111-113.
Radrigo M,Enrico Z,Fredy K,2013.Availability-based simulation and optimization modeling framework for open-pit mine truck allocation under dynamic constrains[J].International Journal of Mining Science and Technology,23:113-119.
Sun Jiakun,Wang Pingfan,Fang Huijuan,2020.Design and implementation of the production logistics collaboration platform for a compressor enterprise[J].Journal of Shandong Jianzhu University,35(4):94-102.
Sun Ka,Weng Zhengping,Zhang Zhiting,al et,2007.3D roadway modeling method based on restrained triangulation[J].Mining Research and Development,(5):64-71.
Wang Liguan,Chen Xin,2016.Advancing technologies for digital mine[J].The Chinese Journal of Nonferrous Metals,26(8):1693-1710.
Wang M,Liu K,Yang G L,al et,2017.Three-dimensional slope stability analysis using laser scanning and numerical simulation[J].Geomatics,Natural Hazards and Risk,8(2):129-136.
Wang Rongbang,Tian Zhongjie,Li Qingyao,2012.Application of intersection surveying in surface coal mine based on total station[J].Science & Technology Information,(3):44-46.
Wang Weicai,Peng Chengshan,Yang Chenhui,al et,2020.Monitoring accuracy estimation and verification analysis of automatic total station[J].Construction & Design for Engineering,(12):237-240.
Yang Zhen,Guo Changfang,Wang Jingyi,al et,2019.Research on construction of intelligent mine driven by data[J].China Coal,45(11):41-48.
Zeng Xiangkai,2020.Accuracy analysis of mine topographic survey based on lidar mapping technology[J].World Nonferrous Metals,(1):31-32.
Zhao Z P,Cheng C T,Jin X Y,al et,2020.A MILP model for hydro unit commitment with irregular vibration zones based on the constrained Delaunay triangulation method[J].International Journal of Electrical Power and Energy Systems,123:106241.
毕林,王晋淼,2019.数字矿山建设目标、任务与方法[J].金属矿山,38(6):148-156.
毕林,赵辉,贾明涛,2016.面向数据库特征的基于LMDB与线性八叉树海量块段模型存储技术[J].有色金属学报,26(9):2462-2468.
曹英莉,2019.三维激光扫描技术在矿山测量中的应用[J].世界有色金属,(21):14-15.
陈鑫,王李管,2016.采空区单站激光等距扫描与高效三维重建方法[J].中国矿业大学学报,45(4):836-842.
段平,李佳,李海昆,等,2020.无人机影像点云与地面激光点云配准的三维建模方法[J].测绘工程,9(4):44-47.
刘思铨,2019.GPS-RTK技术在矿山测量中的应用探析[J].世界有色金属,(20):56-58.
刘占宁,宋宇辰,孟海东,等,2018.块体尺寸和估值方法对矿石品位估值的影响[J].矿业研究与开发,38(6):89-93.
罗瑶,莫文波,颜紫科,2020.倾斜摄影测量与BIM三维建模集成技术的研究与应用[J].测绘地理信息,45(4):40-45,126.
蒲浩,宋占峰,詹振炎,2005.基于约束Delaunay三角剖分的道路三维建模方法[J].华中科技大学学报(自然科学版),(6):111-113.
孙家坤,王平凡,房慧娟,2020.压缩机企业生产物流协同平台的设计与实现[J].山东建筑大学学报,35(4):94-102.
孙卡,翁正平,张志庭,等,2007.基于带约束三角剖分的三维巷道建模方法[J].矿业研究与开发,(5):64-71.
王李管,陈鑫,2016.数字矿山技术进展[J].中国有色金属学报,26(8):1693-1710.
王荣榜,田忠杰,李庆尧,2012.基于全站仪的交会法测量在露天矿山的应用[J].露天采矿技术,(3):44-46.
王伟才,彭成山,杨晨辉,等,2020.自动全站仪的监测精度估算及验证分析[J].工程建设与设计,(12):237-240.
杨真,郭昌放,王静宜,等,2019.由数据驱动的智慧矿山建设研究[J].中国煤炭,45(11):41-48.
曾祥凯,2020.基于激光雷达测绘技术在矿山地形测量中的精度分析[J].世界有色金属,(1):31-32.
[1] Xin CHEN,Liguan WANG,Jinling LI. Grade Model Constructing and Reclaiming Grade Predicting of Ore Yard [J]. Gold Science and Technology, 2021, 29(2): 287-295.
[2] . Complex Blasting Network Detonation Simulation and Effect Prediction for Open Pit Mine [J]. Gold Science and Technology, 2017, 25(4): 87-92.
[3] TAN Zhenghua,TAN Jiaoyue,PAN Mei,WANG Liguan. A Method for High Quality Orebody Surface 3D Reconstruction Based on Space Contours [J]. Gold Science and Technology, 2017, 25(2): 96-103.
[4] LI Jinling,WANG Liguan,CHEN Xin. Ore Loss and Dilution Control System at Ore-rock Border for Open Pit Bench Blasting [J]. Gold Science and Technology, 2016, 24(3): 14-20.
Viewed
Full text


Abstract

Cited

  Shared   
  Discussed   
No Suggested Reading articles found!