[an error occurred while processing this directive] [an error occurred while processing this directive] [an error occurred while processing this directive]
[an error occurred while processing this directive]
采选技术与矿山管理

基于博弈论的主客观组合权重TOPSIS采矿方法优选

  • 邓龙鑫 ,
  • 陈建宏
展开
  • 中南大学资源与安全工程学院,湖南 长沙 410083
陈建宏(1963-),男,江苏苏州人,教授,从事矿业经济和采矿系统工程研究工作。

邓龙鑫(1997-),男,江西赣州人,硕士研究生,从事矿业经济和采矿系统工程研究工作。

收稿日期: 2021-06-20

  修回日期: 2021-09-22

  网络出版日期: 2022-06-17

基金资助

国家自然科学基金青年基金项目“基于人工智能的矿山技术经济指标动态优化”(51404305)

Optimization of Mining Method with Subjective and Objective Combination Weight TOPSIS Based on Game Theory

  • Longxin DENG ,
  • Jianhong CHEN
Expand
  • School of Resources and Safety Engineering,Central South University,Changsha 410083,Hunan,China

Received date: 2021-06-20

  Revised date: 2021-09-22

  Online published: 2022-06-17

本文亮点

针对当前采矿方法优选过程中,权重计算时主观权重信息丢失较多且占比过大的问题,将主客观权重相结合,计算出综合权重,并运用于采矿方法优选体系。首先,利用模糊扩展层次分析法(FEAHP)计算主观权重,最大程度地保存主观信息;然后,利用CRITIC客观赋权法计算客观权重,并运用博弈论原理将主客观权重相结合,得到综合权重;最后,结合逼近理想解的排序方法(TOPSIS),建立基于博弈论的主客观组合权重TOPSIS采矿方法优选模型。将所建立的基于博弈论的主客观组合权重TOPSIS采矿方法优选模型运用于工程实例中,对姑山露天铁矿驻留矿体的采矿方法进行优选,计算出4种备选方案(上向进路胶结充填法、浅孔留矿嗣后充填法、上向水平分层充填法和下向水平分层充填法)的相对贴近度分别为0.4547、0.4441、0.5872和0.4072,得出上向水平分层充填法为最优方案。研究结果与矿山工程实例相符,证明基于博弈论组合的主客观权重值比以往单一的赋权法得到的权重值更加合理,建立的模型更科学。

本文引用格式

邓龙鑫 , 陈建宏 . 基于博弈论的主客观组合权重TOPSIS采矿方法优选[J]. 黄金科学技术, 2022 , 30(2) : 282 -290 . DOI: 10.11872/j.issn.1005-2518.2022.02.078

Highlights

In the current optimization of mining methods, subjective components lead to more information loss, and the relative importance of evaluation indicators is unreasonable.This paper fully considered the results of the combination of comprehensive degree analysis method and fuzzy analytic hierarchy process-fuzzy extended analytic hierarchy process (FEAHP) and objective weight method CRITIC,used FEAHP to determine the subjective weight of each index in the optimization system of mining method.CRITIC algorithm was used to calculate the conflict between various indicators,so as to calculate the objective weight.Then,the principles of game theory was used to compromise the subjective and objective weights,and find their consistency to obtain a reasonable combination weight.Finally,combined with the real data of the alternatives,the distance between the four alternatives and the positive and negative ideal solutions is obtained by the distance measurement method in TOPSIS,and the relative patching progress of the four alternatives was calculated.The options of the upward approach cement filling method (Scheme 1), the shallow hole retention and subsequent filling method (Scheme 2), the upward horizontal layered filling method (Scheme 3) and the downward horizontal layered filling method (Scheme 4).The relative patching progress of the four alternatives are 0.4547,0.4441,0.5872,0.4072 respectively.It is concluded that the third scheme (upward horizontal stratified filling method) is the best,and the relative paste progress of 0.5872 also fully demonstrates that the upward horizontal stratified filling method has formed a strong contrast with the other three schemes,showing that the scheme meets the requirements of modern mining engineering for safety,low cost,and high profit,highlights its own advantages,and is consistent with mine examples and other experts’ research, indicating that the model is scientific and effective for mining optimization.

[an error occurred while processing this directive]

脚注

http://www.goldsci.ac.cn/article/2022/1005-2518/1005-2518-2022-30-2-282.shtml

Chamoli S2015. Hybrid FAHP (fuzzy analytical hierarchy process)-FTOPSIS (fuzzy technique for order preference by similarity of an ideal solution) approach for performance evaluation of the V down perforated baffle roughened rectangular channel[J].Energy,84:432-442.

Chen Boyu Song Weidong Jiang Guojian,et al,2015.Optimization of mining methods in Dayingezhuang gold mine based on AHP-CTODIM evaluation model[J].Gold,(10): 35-39.

Chen Jianhong Liu Lang Zhou Zhiyong,et al,2010.Optimization of mining methods based on principal component analysis and neural network[J].Journal of Central South University(Natural Science Edition)41(5):1967-1972.

Chen Yi Chen Jianhong2017.Optimization of mining methods based on game theory and relative entropy TOPSIS[J].Gold Science and Technology25(6):75-82.

Deng Jian2015.Multi-attribute Decision-making Method Ba-sed on Improved VIKOR Method and Its Application in Water Conservancy Projects[D].Tianjin:Tianjin University.

Ganesh A H Shobana A H Ramesh R2021.Identification of critical path for the analysis of bituminous road transport network using integrated FAHP-FTOPSIS method[J].Materialstoday:Proceedings37(2):193-206.

Hu Wei Wang Weiping Lou Guangwen2016.Application of grey analytic hierarchy process in optimizing mining methods of Zhaoanzhuang iron mine[J].Modern Mining,(1):6-7,16.

Khashei-Siuki A Keshavarz A Sharifan H2020.Comparison of AHP and FAHP methods in determining suitable areas for drinking water harvesting in Birjand aquifer.Iran[J].Groundwater for Sustainable Development,100328.

Kilincci O Onal S A2011.Fuzzy AHP approach for supplier selection in a washing machine company[J].Expert Systems with Applications38(8):9656-9664.

Kwong C K Bai H2003.Determining the importance weights for the customer requirements in QFD using a fuzzy AHP with an extent analysis approch[J].IIE Transactions35(7):619-626.

Liu Wenqing Wang Yingming2017.Intuitionistic fuzzy TOPSIS multi-attribute decision-making method based on rough set[J].Computer Systems Applications26(11):277-281.

Liu Xiaoyue Yang Wei Zhang Xuemei2021.Multidimensional cloud model rockburst prediction based on improved hierarchy method and CRITIC method[J].Journal of Hunan University(Natural Science Edition)48(2):118-124.

Luo Jia Shi Xiuzhi Zhang Shu,et al,2013.Optimization of trolley tunneling cutting scheme based on AHP and improved TOPSIS method[J].Blasting30(4):54-59.

Seren B Haruna Y2017.Integrating FAHP and TOPSIS to evaluate mobile learning applications for mathematics[J].Procedia Computer Science,120:91-98.

Thapar S S Sarangal H2020.Quantifying reusability of software components using hybrid fuzzy analytical hierarchy process (FAHP)-Metrics approach [J]. Applied Soft Computing88(7):105997.

Wang Xinmin Ke Yuxian Zhang Qinli,et al,2012.Optimal selection of open-pit to underground mining based on AHP-TOPSIS[J].Journal of Guangxi University(Natural Science Edition)37(6):1273-1279.

Wang Xinmin Qin Jianchun Zhang Qinli,et al,2013.Optimization of Gushan resident mine mining method based on AHP-TOPSIS evaluation model[J].Journal of Central So-uth University(Natural Science Edition)44(3):1131-1137.

Wang Xinmin Zhao Bin Zhang Qinli2008.Selection of mining methods based on analytic hierarchy process and fuzzy mathematics[J].Journal of Central South University(Natural Science Edition)39(5):875-880.

Yang Rihui Wang Shouxu2006.Fuzzy comprehensive evaluation of environmental impact in post-evaluation of highway network based on new AHP method[J].Journal of Chong-qing Jiaotong University25(2):93-95.

Zhang Qinli Zhao Yufei Rong Shuai,et al,2019.Optimization of gently inclined thin vein mining method based on variable weight theory and TOPSIS[J].Gold Science and Technology27(6):844-850.

Zhu K J Chang D Y1999.A discussion on extent analysis method and applications of fuzzy AHP[J].European Journal of Operational Research,116:450-456.

陈博宇,宋卫东,江国建,2015.基于 AHP-CTODIM评判模型的大尹格庄金矿采矿方法优选[J].黄金,(10):35-39.

陈建宏,刘浪,周智勇,2010.基于主成分分析与神经网络的采矿方法优选[J].中南大学学报(自然科学版)41(5):1967-1972.

陈毅,陈建宏,2017.基于博弈论与相对熵TOPSIS的采矿方法优选[J].黄金科学技术25(6):75-82.

邓剑,2015.基于改进VIKOR法的多属性决策方法及其在水利工程中的应用[D].天津:天津大学.

胡崴,汪为平,娄广文,2016.灰色层次分析法在赵案庄铁矿采矿方法优选中的应用[J].现代矿业,(1):6-7,16.

刘文清,王应明,2017.基于粗糙集的直觉模糊TOPSIS多属性决策方法[J].计算机系统应用26(11):277-281.

刘晓悦,杨伟,张雪梅,2021.基于改进层次法与CRITIC法的多维云模型岩爆预测[J].湖南大学学报(自然科学版)48(2):118-124.

罗佳,史秀志,张舒,2013.基于AHP和改进TOPSIS法的台车掘进掏槽方案优选[J].爆破30(4):54-59.

王新民,柯愈贤,张钦礼,2012.基于AHP-TOPSIS的露天转地下采矿方案优选[J].广西大学学报(自然科学版)37(6):1273-1279.

王新民,秦健春,张钦礼,等,2013.基于AHP- TOPSIS 评判模型的姑山驻留矿采矿方法优选[J].中南大学学报(自然科学版)44(3):1131-1137.

王新民,赵彬,张钦礼,2008.基于层次分析和模糊数学的采矿方法选择[J].中南大学学报(自然科学版)39(5):875-880.

杨日辉,王首绪,2006.基于新AHP法的公路路网后评价中环境影响的模糊综合评价[J].重庆交通学院学报25(2):93-95.

张钦礼,赵宇飞,荣帅,2019.基于变权重理论和TOPSIS的缓倾斜薄矿脉采矿方法优选[J].黄金科学技术27(6):844-850.

文章导航

/

[an error occurred while processing this directive]