Stability Analysis and Evaluation of Filling Cantilever Structure in Longshou Mine
Received date: 2021-09-22
Revised date: 2022-03-11
Online published: 2022-06-17
安全是矿山生产中极其重要的一环,充填体悬臂结构是龙首矿进路回采中十分常见的安全隐患形式,由于自重和深部地应力的作用,容易发生崩塌破坏现象。根据龙首矿实际情况,其充填体悬臂结构失稳破坏主要有崩落式和拉裂—坠落式2种形式。基于悬臂梁理论,建立进路人工假顶悬臂和充填围岩悬臂力学计算模型,通过理论计算悬臂极限长度、数值模拟验证和稳定性系数K并进行综合评价,以保障矿山安全生产。结果表明:充填体悬臂的稳定性受顶部裂缝深度比和实际长度的影响,其极限长度与数值模拟结果基本一致。同时,稳定性系数K能够有效统计不同裂缝条件下充填体悬臂状态,判断充填体悬臂顶部裂缝深度比情况。因此,悬臂极限长度和稳定性系数K能够有效评价龙首矿充填体悬臂的稳定性,实际应用简单,计算结果与现场调查情况基本吻合,对于潜在的充填体悬臂结构安全隐患能起到及时预警的效果。
张钦礼 , 余一波 , 王道林 . 龙首矿充填体悬臂结构的稳定性分析与评价[J]. 黄金科学技术, 2022 , 30(2) : 254 -262 . DOI: 10.11872/j.issn.1005-2518.2022.02.133
Safety is an extremely important part of mine production. The cantilever structure of filling body is common form of potential safety hazard in drift stoping of Longshou mine. Collapse is easy to occur due to self weight and deep in-situ stress. Longshou mine is the only large underground mine in China that successfully adopts panel area mechanized downward hexagonal drift cemented filling mining method,its artificial false roof cantilever and filling cantilever surrounding rock often collapse by itself. At the same time,the deep filling body has large deformation,which brings great instability and hidden dangers to the safety production of the mining area. In order to effectively deal with and comprehensively evaluate the cantilever stability of backfill,based on the cantilever beam theory and combined with the experience of geotechnical dangerous rock mass,this paper established the mechanical models of artificial false roof cantilever and surrounding rock filling cantilever in Longshou mine,and studied the calculation methods of collapse and tension crack fall deformation and failure modes. Thus,the limit cantilever length and stability coefficient K of filling body were proposed. The limit length of cantilever was calculated theoretically,verified by numerical simulation and stability coefficient K. The results show that the stability of the filling cantilever is negatively correlated not only with the limit length of the cantilever,but also with the development of the overlying crack. Through the simulation,the tensile strength of the failure condition is basically the same between the theoretical limit length and the simulated length. It shows that the theoretical limit length is suitable for the actual geological conditions of Longshou mine. At the same time,the stability coefficient K can effectively count the cantilever state of the filling body under different crack conditions,and judge the crack depth ratio at the top of the cantilever of the filling body according to the actual state of the cantilever on site and in combination with the stability evaluation grade classification table. Therefore,the cantilever limit length and stability coefficient K can effectively evaluate the stability of the filling cantilever in Longshou mine. The practical application is simple,and the calculation results are basically consistent with the field investigation results. It can play a timely early warning effect for the danger caused by the excessive cantilever and the further development of cracks. It has guiding significance for the safety production of drift mining in Longshou mine.
Key words: fracture; ore rock mining; filling body; stability analysis; cantilever beam; mine safety; Longshou mine
null | Chen Hongkai, Qin Xin,2018.Status quo and trend of unstable rock stability analysis[J].Journal of Chongqing Jiaotong Uni-versity(Natural Sciences),37(10):49-60. |
null | Guo Rui,2021.Application analysis of safety management in mining engineering[J].Modern Chemical Research,12:52-53. |
null | He Siming, Wu Yong, Li Xinpo,2010.Collapse mechanism of danger rock triggered by earthquake[J].Chinese Journal of Rock Mechanics and Engineering,29(Supp.1):3359-3363. |
null | Hu Houtian,2005.Research on the collapse and falling stone[J].Journal of Railway Engineering Society,(Supp.1):387-391. |
null | Li Hongye,2019.Blasting experiment of large section approach with hexagonal shape[J].Blasting,36(4):49-55,125. |
null | Niu Xiaoren,2021.Analysis of the safety production supervision and management method in mining enterprises under the background of informatization[J].Management & Te-chnology of SME,(20):5-6. |
null | Shen Shifa,2021.Analysis of influence of crack propagation on the change of instability mode of dangerous rock[J].China Highway,(1):102-103. |
null | Sun Lin, Wu Manlu, Zhang Chao,et al,2019.In-situ stress state analysis in the secondary west mining area of Jinchuan Longshou mine[J].Metal Mine,48(4):15-19. |
null | Tang Hongmei, Wang Zhi, Xian Xuefu,et al,2011.Violent-slide rock avalanche and excitation effect of perilous rock[J].Journal of Chongqing University,34(10):39-45. |
null | Wang Genlong, Wu Faquan, Qi Shengwen,2012.Research on failure mechanisms for cantilever and tension crack-type collapse[J].Rock and Soil Mechanics,33(Supp.2):269-274. |
null | Wang Hu,2020.Analysis of the influence of waist width of hexagonal access road on the stability of filling body in Longshou mine[J].Modern Mining,36(4):165-170. |
null | Wang Jian, Wang Genlong, Song Fei,et al,2021.Failure mechanism of cantilever beam in near-horizontal layered sand-mudstone interbedded slope—A case study in Niugouchuan river bank collapse[J].Journal of Catastrophology,36(1):207-211,222. |
null | Xiao Yunliang, Han Bin,2021.Analysis on the drift stability of downward drift filling mining in Longshou mine[J].Mining Research and Development,41(8):36-40. |
null | Xie Quanmin, Xia Yuanyou,2002.Comprehensive assessment method of stability of critical rock-block mass and its application[J].Rock and Soil Mechanics,23(6):775-777,781. |
null | Xu Lulu, Zhang Qinli, Feng Ru,2021.Numerical simulation of backfill strength based on optimization results of stope structural parameters[J].Gold Science and Technology,29(3):421-432. |
null | Yang Lianzhi, Zhang Liangliang, Yu Lianying,et al,2014.Comparison of solutions from different displacement boundary conditions at fixed end of cantilever beams[J].Journal of Zhejiang University(Engineering Science),48(11):1955-1961. |
null | Yang Wei, Li Guoping, Li Xibing,et al,2018.The failure rules and preventive measures of cemented full tailings filling body under blasting load[J].Mining Research and Development,38(3):113-118. |
null | Yuan Wei, Zheng Chuanchang, Wang Wei,et al,2018.Evaluation method of earthquake-induced bending collapse of the upside-down dangerous rock-mass based on cantilever beam theory[J].Journal of Sichuan University(Engineering Science Edition),50(3):233-239. |
null | Zhang Qinli, Jiang Chaoyu, Gao Xiang,et al,2020.Study on optimization of structural parameters of hexagonal mining method with large cross-section[J].Gold Science and Technology,28(1):42-50. |
null | Zhao Shengkui,2021.Application of safety and quality management in mining engineering[J].Modern Chemical Rese-arch,11:53-54. |
null | Zhou Yuntao,2016.A method for calculating the stability of unstable rocks on Three Gorges Reservoir by fracture mechanics[J].Rock and Soil Mechanics,37(Supp.1):495-499. |
null | Zhu Shiqiang,2019.Study on Induced Caving Process of Cemented Backfill and Stope Stability of the Second West Mining Area in Longshou Mine[D].Mianyang:Southwest University of Science and Technology. |
null | 陈洪凯,秦鑫,2018.危岩稳定性分析研究现状及趋势[J].重庆交通大学学报(自然科学版),37(10):49-60. |
null | 郭锐,2021.安全管理在矿山采矿工程中的应用分析[J].当代化工研究,12:52-53. |
null | 何思明,吴永,李新坡,2010.地震诱发岩体崩塌的力学机制[J].岩石力学与工程学报,29(增1):3359-3363. |
null | 胡厚田,2005.崩塌落石研究[J].铁道工程学报,(增1):387-391. |
null | 李宏业,2019.大断面六角形进路爆破试验研究[J].爆破,36(4):49-55,125. |
null | 牛孝仁,2021.信息化背景下矿山企业安全生产监督管理方法探析[J].中小企业管理与科技(中旬刊),(20):5-6. |
null | 孙林,吴满路,张超,等,2019.金川龙首矿西二采地应力状态分析[J].金属矿山,48(4):15-19. |
null | 沈仕发,2021.裂纹扩展对危岩失稳模式变化的影响分析[J].中国公路,(1):102-103. |
null | 唐红梅,王智,鲜学福,等,2011.坠落式危岩剧动式崩落与激振效应[J].重庆大学学报,34(10):39-45. |
null | 王根龙,伍法权,祁生文,2012.悬臂—拉裂式崩塌破坏机制研究[J].岩土力学,33(增2):269-274. |
null | 王虎,2020.龙首矿六角形进路腰宽尺寸对充填体稳定性影响的分析[J].现代矿业,36(4):165-170. |
null | 王健,王根龙,宋飞,等,2021.近水平层状砂泥岩互层边坡悬臂梁崩塌机理研究——以志丹县牛沟川河流塌岸为例[J].灾害学,36(1):207-211,222. |
null | 肖云亮,韩斌,2021.金川龙首矿下向进路充填采矿的进路稳定性分析[J].矿业研究与开发,41(8):36-40. |
null | 谢全敏,夏元友,2002.危岩块体稳定性的综合评价方法分析[J].岩土力学,23(6):775-777,781. |
null | 徐路路,张钦礼,冯如,2021.基于采场结构参数优化后的充填体强度数值模拟[J].黄金科学技术,29(3):421-432. |
null | 杨连枝,张亮亮,余莲英,等,2014.悬臂梁固定端不同位移边界条件下解的对比[J].浙江大学学报(工学版),48(11):1955-1961. |
null | 杨伟,李国平,李夕兵,2018.爆破荷载下全尾砂胶结充填体破坏规律及防治措施[J].矿业研究与开发,38(3):113-118. |
null | 袁维,郑传厂,王伟 等,2018.基于悬臂梁理论的倒悬危岩体地震弯折崩塌评价方法研究[J].工程科学与技术,50(3):233-239. |
null | 张钦礼,蒋超余,高翔,等,2020.大断面六角形进路采矿法结构参数优化研究[J].黄金科学技术,28(1):42-50. |
null | 赵胜奎,2021.安全质量管理在矿山采矿工程中的应用[J].当代化工研究,11:53-54. |
null | 周云涛,2016.三峡库区危岩稳定性断裂力学计算方法[J].岩土力学,37(增1):495-499. |
null | 朱仕强,2019.龙首矿西二采区胶结充填体冒落过程及其采场稳定性研究[D].绵阳:西南科技大学. |
/
〈 | 〉 |