采选技术与矿山管理

基于主成分分析和PSO-ELM算法的排土场稳定性预测模型

  • 高峰 ,
  • 吴晓东 ,
  • 周科平
展开
  • 中南大学资源与安全工程学院,湖南 长沙 410083
高峰(1981-),男,湖南怀化人,副教授,从事金属矿开采和矿山工程灾害机理相关研究工作。csugaofeng@126.com

收稿日期: 2020-09-21

  修回日期: 2021-04-13

  网络出版日期: 2021-12-17

基金资助

国家自然科学基金项目“高寒冻融区露天矿岩质边坡裂隙网络扩展行为多尺度时空演化机制”(51774323);“十三五”国家重点研发计划课题“硼镁铁矿资源清洁高效利用与固废源头减量关键技术及示范”(2020YFC1909801);校级自主探索基金项目“高原寒区排土场基底软层冻融特性及边坡稳定性分析”(2019zzts984)

Prediction Model of Soil Dump Stability Based on Principal Component Analysis and PSO-ELM Algorithm

  • Feng GAO ,
  • Xiaodong WU ,
  • Keping ZHOU
Expand
  • School of Resources and Safety Engineering,Central South University,Changsha 410083,Hunan,China

Received date: 2020-09-21

  Revised date: 2021-04-13

  Online published: 2021-12-17

摘要

针对排土场边坡稳定性分析,提出了一种利用主成分分析法降低数据冗余性、粒子群算法优化极限学习机权值阈值的PCA-PSO-ELM排土场边坡稳定性预测模型。确定了土壤黏聚力、内摩擦角、排土场斜角、地基承载力、地震烈度、降雨和降雪条件、排土工艺以及乱采乱挖状况8个排土场稳定性预测指标,针对100组相应排土场数据,采用训练时间、RMSE值和决定系数R2来评价和对比PCA-PSO-ELM模型与BP神经网络模型、ELM模型和PSO-ELM模型预测结果的有效性。研究结果表明:利用经PCA降维处理过的排土场稳定性样本数据作为输入变量去训练和测试PSO-ELM网络模型,预测值与真实值非常接近,其预测精度和效率不仅高于ELM算法,而且远远优于传统BP神经网络算法。经过PCA法优化的PSO-ELM模型与未经PCA处理过的PSO-ELM模型相比,前者在效率相差甚微的基础上大幅缩短了计算时间,证明了该方法具有一定的实用价值。

本文引用格式

高峰 , 吴晓东 , 周科平 . 基于主成分分析和PSO-ELM算法的排土场稳定性预测模型[J]. 黄金科学技术, 2021 , 29(5) : 658 -668 . DOI: 10.11872/j.issn.1005-2518.2021.05.168

Abstract

Aiming at the stability analysis of dump slope,a PCA-PSO-ELM dump slope stability prediction model is proposed in this paper,which uses principal component analysis method to reduce data redundancy and particle swarm optimization algorithm to optimize the weight threshold of extreme learning machine. Eight prediction indexes of dump stability were determined in this model,including soil cohesion,internal friction angle,dump slope angle,foundation bearing capacity,seismic intensity,rainfall and snowfall conditions,dumping technology and random mining and digging conditions.According to 100 groups of corresponding dump data,training time,RMSE value and determination coefficient R2 were used to evaluate and compare the validity of prediction results of PCA-PSO-ELM model,BP neural network model,ELM model and PSO-ELM model.The research results show that as the input variable to train and test the PSO-ELM network model,the dump stability sample data processed by PCA dimensionality reduction,made predicted value very close to the real value.The prediction accuracy and efficiency are not only higher than the ELM algorithm,but also far better than the traditional BP neural network algorithm.Compared with the PSO-ELM model without PCA treatment,the PSO-ELM model optimized by PCA method can significantly shorten the calculation time on the basis of little difference in efficiency,which proves that the method has certain practical value.

参考文献

null Bishop A W,1955.The use of the slip circle in the stability analysis of slopes[J].Geotechnique,5(1):7-17.
null Cao Lanzhu,Wang Zhen,Wang Dong,al et,2017.Numerical simulation of stability during dumping of soft soil dump site[J].Journal of Disaster Prevention and Mitigation Engineering,37(5):776-781.
null Castano A,Fernandez-Navarre F,Hervas-Martinez C,2013.PCA-ELM:A robust and pruned extreme learning machine approach based on principal component analysis[J].Neural Processing Letters,37(3):377-392.
null Chen Peng,Chen Pengfei,2010.Slope stability analysis of open-pit mine dump[J].Journal of Liaoning Technical University(Natural Science Edition),29(6):1028-1031.
null Cho S E,2009.Probabilistic stability analyses of slopes using the ANN-based response surface[J].Computers & Geotechnics,36(5):787-797.
null Gordan B,Armaghani D J,Hajihassani M,al et,2016.Prediction of seismic slope stability through combination of particle swarm optimization and neural network[J].Engineering with Computers,32(1):85-97.
null He Tingting,Shang Yuequan,Qing Lü,al et,2013.Support vector machine method for slope reliability analysis[J].Rock and Soil Mechanics,34(11):3269-3276.
null Hong W P,Song Y S,Lim S G,2005.Stability evaluation of the cut slope using artificial neural network model[J].Journal of the Korean Society of Civil Engineers,25(4C):15-21.
null Janbu N,1975.Slope stability computations:In embankment-dam engineering.Textbook.Eds.R.C.Hirschfeld and S.J.Poulos.John Wiley and Sons Inc.Pub.NY,1973,40P[J].International Journal of Rock Mechanics and Mining sciences & Geomechanics Abstracts,12(4):67.
null Jolliffe I T,Cadima J,2016.Principal component analysis:A review and recent developments[J].Philosophical Transactions of the Royal Society Mathematical Physical & Engineering Sciences,374(2065):20150202.
null Kang F,Li J J,2016.Artificial bee colony algorithm optimized support vector regression for system reliability analysis of slopes[J].Journal of Computing in Civil Engineering,30(3):04015040.
null Li Wei,2014.Slope stability analysis and treatment technology of open-pit coal mine dump site[J].Coal Science and Technology,42(10):37-40,5.
null Liu D J,Han L S,Hu J,al et,2015.DCPSO-BP model of slope stability research[C] //International Conference on Mechanics,Building Material and Civil Engineering.Pennsylvania:DEStech Publication. Inc.
null Liu Z B,Shao J F,Xu W Y,al et,2014.An extreme learning machine approach for slope stability evaluation and prediction[J].Natural Hazards,73(2):787-804.
null Lu H J,Du B J,Liu J Y,al et,2017.A kernel extreme learning machine algorithm based on improved particle swam optimization[J].Memetic Computing,9(2):121-128.
null Luan Tingting,2015.Research and Application of Early Warning Method of Open-pit Mine Dump Landslide[D].Beijing:University of Science and Technology Beijing.
null Morgenstern N R,Price V E,1967.A numerical method for solving the equations of stability of general slip surfaces[J].The Computer Journal,9(4):388-393.
null Shao Liangshan,Ma Han,Wen Tingxin,2015.Prediction of slope stability based on RF-ELM model[J].China Safety Science and Technology,11(3):93-98.
null Shi L,Yang Y L,Lü J H,2015.PCA-PSO-BP neural network application in IDS[C]// International Power,Electronics & Materials Engineering Conference.Paris:Atlantis Press,145-150.DOI:https://doi.org/10.2991/ipemec-15.2015.29.
null Spencer E,1967.A method of analysis of the stability of embankments assuming parallel inter-slice forces[J].Geotechnique,17(1):11-26.
null Su Guoshao,Zhao Wei,Peng Lifeng,al et,2014.Gaussian dynamic response surface method for slope failure probability estimation[J].Rock and Soil Mechanics,35(12):3592-3601.
null Su Yonghua,Luo Zhengdong,Zhang Panfeng,al et,2013.Active search method of slope stability reliability based on Kriging[J].Chinese Journal of Geotechnical Engineering,35(10):1863-1869.
null Su Yonghua,Yang Hongbo,2012.Slope stability reliability algorithm based on proxy model[J].Chinese Journal of Applied Mechanics,29(6):705-710,776.
null Tan Xiaohui,Hu Xiaojun,Chu Chengfu,al et,2011.Fuzzy response surface method and its application in the reliability analysis of slope stability[J].Journal of University of Science and Technology of China,41(3):233-237,243.
null Wang Biaolong,Meng Fanli,Zeng Chao,al et,2019.Landslide reliability evaluation method of PSO-BP neural network based on natural selection strategy[J].China & Foreign Highway,39(3):1-9.
null Wang Yu,Wang Chunlei,Wang Can,al et,2011.Research and application of vector projection response surface for slope reliability evaluation[J].Chinese Journal of Geotechnical Engineering,33(9):1434-1439.
null Wen Tingxin,Zhu Jing,2018.Slope stability prediction based on SAPSO-ELM[J].Journal of Safety and Environment,18(6):2146-2150.
null Xue X H,2016.Prediction of slope stability based on hybrid PSO and LSSVM[J].Journal of Computing in Civil Engineering,31(1):04016041.
null Yi P,Wei K T,Kong X,al et,2015.Cumulative PSO-Kriging model for slope reliability analysis[J].Probabilistic Engineering Mechanics,39:39-45.
null Zhai Wenlong,Zhou Hanmin,2015.Application of simplified bishop method and co-thrust method to stability calculation of high step dumping site[J].Modern Mining,31(8):168-170.
null Zhang Lijun,Mu Chuanwei,He Fangwei,2015.Stability analysis of dump site slope based on strength reduction finite element method[J].Modern Mining,31(8):159-160.
null Zhang Qiwei,Ma Shuzhi,Jia Hongbiao,2015.Comparative analysis of FLAC 3D method and rigid body limit equilibrium method for stability evaluation of mine dumps[J].Mining Research and Development,35(6):45-48.
null 曹兰柱,王珍,王东,等,2017.软弱基底排土场堆载过程中稳定性数值模拟[J].防灾减灾工程学报,37(5):776-781.
null 陈鹏,陈鹏飞,2010.露天矿排土场边坡稳定性分析[J].辽宁工程技术大学学报(自然科学版),29(6):1028-1031.
null 翟文龙,周汉民,2015.简化Bishop法和余推力法在高台阶排土场稳定性计算中的应用[J].现代矿业,31(8):168-170.
null 何婷婷,尚岳全,吕庆,等,2013.边坡可靠度分析的支持向量机法[J].岩土力学,34(11):3269-3276.
null 李伟,2014.露天煤矿排土场边坡稳定性分析与治理技术[J].煤炭科学技术,42(10):37-40,5.
null 栾婷婷,2015.露天矿排土场滑坡预警方法的研究及应用[D].北京:北京科技大学.
null 邵良杉,马寒,温廷新,2015.基于RF-ELM模型的边坡稳定性预测研究[J].中国安全生产科学技术,11(3):93-98.
null 苏国韶,赵伟,彭立锋,等,2014.边坡失效概率估计的高斯过程动态响应面法[J].岩土力学,35(12):3592-3601.
null 苏永华,罗正东,张盼凤,等,2013.基于Kriging的边坡稳定可靠度主动搜索法[J].岩土工程学报,35(10):1863-1869.
null 苏永华,杨红波,2012.基于代理模型的边坡稳定可靠度算法[J].应用力学学报,29(6):705-710,776.
null 谭晓慧,胡晓军,储诚富,等,2011.模糊响应面法及其在边坡稳定可靠度分析中的应用[J].中国科学技术大学学报,41(3):233-237,243.
null 王彪龙,孟凡利,曾超,等,2019.基于自然选择策略的PSO-BP神经网络的滑坡可靠性评价方法[J].中外公路,39(3):1-9.
null 王宇,王春磊,汪灿,等,2011.边坡可靠性评价的向量投影响应面研究及应用[J].岩土工程学报,33(9):1434-1439.
null 温廷新,朱静,2018.基于SAPSO-ELM的边坡稳定性预测[J].安全与环境学报,18(6):2146-2150.
null 张利军,母传伟,何方维,2015.基于强度折减有限元法的排土场边坡稳定性分析[J].现代矿业,31(8):159-160.
null 张其唯,马淑芝,贾洪彪,2015.矿山排土场稳定性评价的FLAC 3D方法和刚体极限平衡法对比分析[J].矿业研究与开发,35(6):45-48.