Optimization of Three-underground Mining Technology and Disaster Prevention in Sanshandao Gold Mine
Received date: 2020-07-02
Revised date: 2020-08-28
Online published: 2020-11-05
以“三下”开采矿山的工艺技术与灾害防控措施优化为目的,通过数值模拟的方法对三山岛金矿“三下”开采案例进行剖析,采用调查、模拟和监测等方法分析了“三下”矿山矿床的开采技术条件,结合充填法开采的相关参数分析“三下”开采对地表的影响。针对护顶矿柱与开采顺序进行分析,通过对比不同开采顺序方案的效果选取最优顺序方案。结果表明:房柱交替开采方法按隔二采一的开采方案进行开采对于矿山更为安全有效,房柱交替上升式充填采矿法使得矿石损失率由13%降为4%。结合分析结果,针对断层和地表水体等因素制定了严密的开采方案与防控措施,并对矿区地表进行沉降岩移监测,确保“三下”开采的安全和高效。
王善飞 , 王康 , 马凤山 , 卢蓉 . 三山岛金矿“三下”开采工艺优化与灾害防治[J]. 黄金科学技术, 2020 , 28(5) : 734 -742 . DOI: 10.11872/j.issn.1005-2518.2020.05.117
Sanshandao gold mine,belonging to Shandong gold mining (Laizhou) Co.,Ltd.,is located at Laizhou Bay of the northwest of Jiaodong Peninsula,Shandong Province.The surface of gold mine is covered by river,sea,roads and village,so Sanshandao gold mine is a typical three-underground mine.The purpose of this paper is to optimize the technology and control measures of the “three-underground” mining mine.Through analysis of “three-under” mining case of Sanshandao gold mine, the mining technical conditions was analyzed through investigation, simulation and monitoring methods, and the impact of “three under” mining on the surface was analyzed combined with the relevant parameters of the filling method.The main research objects are protected top pillar and mining sequence.The method of room and pillar alternately raised mining with backfill could reduce rate of ore loss.The rate of ore loss was reduced from 13% to 4%,which demonstrated the suitability of the method.Mining sequence is another object that influence mining safety and stability.Four mining plans were conducted by simulation models:Mining sequence of plan-1 was mining from one side to another;Mining sequence of plan-2 was mining from center to sides;Mining sequence of plan-3 was mining one every the other two panels;Mining sequence of plan-4 was mining from sides to center.Finally,the optimized mining sequence is plan-3.Fault was the major factor in mining safety,and F3 fault in Sanshandao gold mine have leaded to several water inrush accidents,so roadway engineering should keep away from F3 fault.But some roadways have to go through the F3 fault in reality.The first measure was reinforced the fracture zones by advance grouting.And put some pipes into the fracture zones in order to improve the engineering geological condition.For surface water body,the patrol system and emergency plan were set for prevent intrusion.In Sanshandao gold mine,345 GPS monitoring points were set to monitor surface deformation.The cover range of monitoring was 8.5 km2.The mining engineering influence was minimized to surface subsidence which showed the technology and measures were effective.In underground mining,IMS micro-seismic monitoring system was set in Sanshandao gold mine in 2012.A set of system of working in real time,dynamically,automatically was built for ground pressure monitoring.This system provided support for mining engineering safety and efficient.The mining engineering was also implemented based on principle of production-learning-research combination.Appropriate mining technical scheme and controlling measures are the guarantee of mining stability and sustainability.
http://www.goldsci.ac.cn/article/2020/1005-2518/1005-2518-2020-28-5-734.shtml
| 1 |
连达军,汪云甲.“三下”开采综合评价体系研究[J].中国矿业大学学报,2005,34(1): 97-101.
|
| 2 |
刘秀锋.煤矿三下开采煤柱留设研究与应用[J].能源与节能,2015(12):164-166.
|
| 3 |
程立年,李晓刚,叶振华,等.某金矿“三下”开采移动带内地表稳定性分析[J].金属矿山,2019,48(3):56-61.
|
| 4 |
席燕敏,李洁慧,李敏.金属矿山河流下矿体安全开采技术研究[J].湖南有色金属,2018,34(1):5-7,11.
|
| 5 |
陈于恒,孙建明,章毛平.“三下”采煤优化决策系统的探讨[J].技术经济,1991(12):56-57.
|
| 6 |
蔡宝金.浅谈“三下”采煤技术[J].煤炭技术,2003,22(6):45-47.
|
| 7 |
姚金蕊,李夕兵,周子龙.“三下”矿体开采研究[J].地下空间与工程学报,2005,1(7):1073-1075.
|
| 8 |
彭康,李夕兵,彭述权,等.海底下框架式分层充填法开采中矿岩稳定性分析[J].中南大学学报(自然科学版),2011,42(11):3452-3458.
|
| 9 |
彭康,李夕兵,彭述权,等.海下点柱式开采的有限元动态模拟分析[J].金属矿山,2009,39(10):59-62.
|
| 10 |
彭康,李夕兵,彭述权,等.基于响应面法的海下框架式采场结构优化选择[J].中南大学学报(自然科学版),2011,42(8):2417-2422.
|
| 11 |
郭文兵,白二虎,杨达明.煤矿厚煤层高强度开采技术特征及指标研究[J].煤炭学报,2018,43(8):2117-2125.
GuoWenbing,
|
| 12 |
刘建兴,陈晃,王建法.金属矿山绿色开采综合评价方法及其应用研究[J].有色金属(矿山部分),2018,70(1):86-89.
|
| 13 |
王建法.金属矿山绿色开采指标体系的构建与评价方法研究[D].福州:福州大学,2017.
|
| 14 |
郭文兵,王云广.基于绿色开采的高强度开采定义及其指标体系研究[J].采矿与安全工程学报,2017,34(4):616-623.
|
| 15 |
赵威,李威,黄树魏,等.三山岛金矿智能绿色矿山建设实践[J].黄金科学技术,2018,26(2):219-227.
|
| 16 |
|
| 17 |
钱鸣高.绿色开采的概念与技术体系[J].煤炭科技,2003(4):1-3.
|
| 18 |
钱鸣高,缪协兴,许家林.资源与环境协调(绿色)开采及其技术体系[J].采矿与安全工程学报,2006,23(1):1-5.
|
| 19 |
姚宝魁,刘竹华.矿山地下开采稳定性研究[M].北京:中国科学技术出版社,1994.
|
| 20 |
王运敏.现代采矿手册[M].北京:冶金工业出版社,2012.
|
| 21 |
赵洋,付其锐,邱云胜.三山岛金矿充填采矿工艺研究[J].现代矿业,2012(2):1-4.
|