Reliability Evaluation of Pillars System Based on Domino Failure Effect
Received date: 2017-07-12
Revised date: 2017-11-08
Online published: 2019-01-24
周子龙 , 王亦凡 , 柯昌涛 . “多米诺骨牌”破坏现象下的矿柱群系统可靠度评价[J]. 黄金科学技术, 2018 , 26(6) : 729 -735 . DOI: 10.11872/j.issn.1005-2518.2018.06.729
The residual goafs after mining operations is a great threaten to underground work and surface building safe.Stability assessment on goafs system helps to guide normal production and prevent disasters.According to pillars’ domino effect,multiple pillars system was constructed,based on which plliars’ strength was calculated and the limitation state equation was proposed.The system’s stability under criteria with different safety factors was estimated by Monte-Carlo simulation method. In a chromite mine,failure probability of multiple pillars system was much higher than failure criteria,which corresponds to the realistic failure.The stability of pillars system was greatly influenced by both pillar bearing capacity and pillar number.
1 | 于常先,付其锐,刘成鹏,等 .全充填嗣后连续采矿法在缓倾斜薄矿脉矿柱回采中的应用[J].黄金科学技术,2014,22(2):51-54. |
1 | Yu Changxian , Fu Qirui , Liu Chengpeng ,et al .Application of the full filling afterwards continuous mineral method in the recovery process of gently inclined thin veins pillar[J].Gold Science and Technology,2014,22(2):51-54. |
2 | 白朝阳,王国伟,张鹏,等 .水平采空区群条件下矿柱回采爆破位置研究[J].黄金科学技术,2017,25(4):81-86. |
2 | Bai Zhaoyang , Wang Guowei , Zhang Peng ,et al .Research on pillaring blasting location under level gob group conditions[J].Gold Science and Technology,2017,25(4):81-86. |
3 | 牛勇,李克钢 .房柱采矿法采场结构参数优化理论研究及应用[J].黄金科学技术,2015,23(6):75-80. |
3 | Niu Yong , Li Kegang .Study on the theory of room and pillar mining method optimization of stope structure parameters and its application[J].Gold Science and Technology,2015,23(6):75-80. |
4 | 刘学增,翟德元 .矿柱可靠度设计[J].岩石力学与工程学报,2000,19(1):85-88. |
4 | Liu Xuezeng , Zhai Deyuan .The reliability design of pillar[J].Chinese Journal of Rock Mechanics and Engineering,2000,19(1):85-88. |
5 | Griffiths D V , Fenton G A , Lemons C B .Probabilistic analysis of underground pillar stability[J].International Journal for Numerical and Analytical Methods in Geomechanics,2002,26(8):775-791. |
6 | 刘沐宇,徐长佑 .地下采空区矿柱稳定性分析[J].矿冶工程,2000,20(1):19-22. |
6 | Liu Muyu , Xu Changyou .Stability analysis of pillar in mined-out area[J].Mining and Metallurgical Engineering,2000,20(1):19-22. |
7 | Deng J , Yue Z Q , Tham L G ,et al .Pillar design by combining finite element methods,neural networks and reliability:A case study of the Fenghuangshan copper mine,China[J].International Journal of Rock Mechanics and Mining Sciences,2003,40(4):585-599. |
8 | Cauvin M , Verdel T , Salmon R .Modeling uncertainties in mining pillar stability analysis[J].Risk Analysis,2009,29(10):1371-1380. |
9 | Najafi M , Jalali S E , Bafghi A R Y ,et al .Prediction of the confidence interval for stability analysis of chain pillars in coal mines[J].Safety Science,2011,49(5):651-657. |
10 | Wattimena R K , Kramadibrata S , Sidi I D ,et al .Developing coal pillar stability chart using logistic regression[J].International Journal of Rock Mechanics and Mining Sciences,2013,58(1):55-60. |
11 | Wattimena R K .Predicting the stability of hard rock pillars using multinomial logistic regression[J].International Journal of Rock Mechanics and Mining Sciences,2014,71:33-40. |
12 | Idris M A , Saiang D , Nordlund E .Stochastic assessment of pillar stability at Laisvall mine using Artificial Neural Network[J].Tunnelling and Underground Space Technology,2015,49:307-319. |
13 | 张耀平,曹平,袁海平,等 .复杂采空区稳定性数值模拟分析[J].采矿与安全工程学报,2010,27(2):233-238. |
13 | Zhang Yaoping , Cao Ping , Yuan Haiping ,et al .Numerical simulation on stability of complicated goaf[J].Journal of Mining and Safety Engineering,2010,27(2):233-238. |
14 | Dehghan S , Shahriar K , Maarefvand P ,et al .3-D numerical modelling of domino failure of hard rock pillars in Fetr6 Chromite Mine,Iran,and comparison with empirical methods[J].Journal of Central South University,2013,20(2):541-549. |
15 | 周子龙,李夕兵,赵国彦 .民窿空区群级联失稳评价[J].自然灾害学报,2007,16(5):91-95. |
15 | Zhou Zilong , Li Xibing , Zhao Guoyan .Evaluation of cascading collapse for private mined zone groups[J].Journal of Natural Disasters,2007,16(5):91-95. |
16 | Cording E J , Hashash Y M A , Oh J .Analysis of pillar stability of mined gas storage caverns in shale formations[J].Engineering Geology,2015,184:71-80. |
17 | Zhou Z L , Chen L , Zhao Y ,et al .Experimental and numerical investigation on the bearing and failure mechanism of multiple pillars under overburden[J].Rock Mechanics and Rock Engineering,2017,50(4):995-1010. |
18 | 中华人民共和国建设部 .建筑结构可靠度设计统一标准:GB50068-2001[S].北京:中国建筑工业出版社,2002. |
18 | Ministry of Construction of the People’s Republic of China .Unified Standard for Reliability Design of Building Structures:GB50068-2001[S].Beijing:China Building Industry Press,2002. |
19 | Lunder P J , Pakalnis R C .Determanation of the strength of hard-rock mine pillars[J].CIM Bulletin,1997,90:51-55. |
20 | Pytel W .Rock mass-mine workings interaction model for Polish copper mine conditions[J].International Journal of Rock Mechanics and Mining Sciences,2003,40(4):497-526. |
/
〈 | 〉 |