Pillar Recover of Sublevel Drilling Stage Room Stoping and Draw Managing

LIU Dangquan, SUN  Zengpeng   

  1. Hubei sanxin gold-copper limited-liability company,Hubei   Dayeshi  435100, China
  • Received:2004-07-13 Revised:2004-09-02 Published:2011-08-02

摘要:

通过介绍太白金矿利用崩落法回收分段凿岩阶段矿房法的矿柱, 指出了崩落法在回收厚大矿柱过程中的应用特点及存在问题, 提出了通过强化放矿管理来提高回收率。

关键词: 岩金矿山, 崩落法, 矿柱回收, 放矿管理

Abstract:

through introducing of cav ing recover the pillar o f sub level drilling stage room stoping in Ti Bai  Gold Mine, caving apply characterisic and quenst ion existin the process of  recover wide pillar was pointed out measure o f  improve recover rate through intensify draw managing was put  forward。

Key words: rock gold mine, caving, pillar recover, draw managing