黄金矿山格子型球磨机节能降耗应用研究

孙浩杰1(),杨俊彦1(),李雪林2,徐忠敏2,谷建国1,游世辉1   

  1. 1.枣庄学院机电工程学院,山东 枣庄 277160
    2.招金矿业股份有限公司金翅岭金矿,山东 烟台 265403
  • 收稿日期:2022-12-01 修回日期:2023-09-08 出版日期:2023-12-31 发布日期:2024-01-26
  • 通讯作者: 杨俊彦 E-mail:2838796761@qq.com;yang8865139@163.com
  • 作者简介:孙浩杰(2002-),男,山东烟台人,本科生,从事矿山机械与分选研究工作。2838796761@qq.com
  • 基金资助:
    枣庄学院博士科研启动基金项目“球磨机节能降耗关键技术开发与应用”(BS1020717);枣庄学院高层次人才团队建设经费项目“智能制造中的拓扑数据分析”(5010207);枣庄市科技发展计划项目“球磨机节能降耗关键技术开发与应用”(2020GX11)

Application Research on Energy Saving and Consumption Reduction of Grid Ball Mill in Gold Mine

Haojie SUN1(),Junyan YANG1(),Xuelin LI2,Zhongmin XU2,Jianguo GU1,Shihui YOU1   

  1. 1.College of Mechanical and Electrical Engineering, Zaozhuang University, Zaozhuang 277160, Shandong, China
    2.Jinchiling Gold Mine, Zhaojin Mining Industry Co. , Ltd. , Yantai 265403, Shandong, China
  • Received:2022-12-01 Revised:2023-09-08 Online:2023-12-31 Published:2024-01-26
  • Contact: Junyan YANG E-mail:2838796761@qq.com;yang8865139@163.com

摘要:

格子型球磨机是黄金矿山选矿厂的常用设备,磨矿作业是整个选矿厂耗能最高的工段。为了降低球磨机的能耗,针对球磨机充填率低以及补装球钢球尺寸不合理等因素导致球磨机能耗高的问题,采用精确化补装球技术对金翅岭金矿选矿厂中的球磨机能耗和效率进行了研究。根据矿石力学性能,采用段氏球径半理论公式精确计算了初装球方案,并在此基础上提出了精确化补装球方案。试验结果表明:球磨机的台时产量提高了2.60 t/h,磨矿细度提高了11.90%,电耗和球耗分别下降了2.17 kW·h/t和0.21 kg/t。由此可见,精确化补装球技术能够有效降低大型黄金矿山中格子型球磨机的能耗,具有良好的推广应用价值。

关键词: 精确化补装球, 磨矿细度, 电耗, 球耗, 球磨机, 黄金矿山

Abstract:

The lattice ball mill is a common equipment in concentrator of gold mine,and the grinding operation is the highest energy-consumption section of the whole concentrator.In order to reduce the energy consumption of the ball mill,aiming at the problem of high energy consumption of the ball mill caused by the low filling rate of the ball mill and the unreasonable size of the ball steel ball,the ball mill in the concentrator of Jinchiling gold mine was studied by using the accurate filling technology. According to the mechanical properties of the ore,the initial ball loading scheme was accurately calculated by using the semi-theoretical formula of Duan’s ball size,and on the basis of this,a accurate ball replenishment scheme was proposed.The results of industrial experi-ments show that the output of the ball mill is increased by 2.6 t/h,the grinding fineness is increased by 11.90%,the power consumption and ball consumption are decreased by 2.17 kW·h/t and 0.21 kg/t,respectively. Therefore,it can be seen that the precise filling ball technology can effectively reduce the energy consumption of the lattice ball mill in large gold mine,and it has good promotion value.

Key words: accurate filling ball, grinding fineness, power consumption, ball consumption, ball mill, gold mine

中图分类号: 

  • TD453

表1

矿石力学性质测试结果"

样品编号单轴抗压强度/(kg·cm-2泊松比μ50样品编号单轴抗压强度/(kg·cm-2泊松比μ50
11 802.410.16671 426.570.169
21 780.020.30281 432.140.253
31 720.350.16291 463.250.274
平均值1 767.590.210平均值1 440.650.232
41 320.560.21510680.520.235
51 356.210.26411670.260.231
61 358.240.18912642.670.217
平均值1 345.000.223平均值664.480.228

表2

球磨工作部分参数"

参数数值
转速率Ψ/%76
钢球有效密度ρe/(kg·cm-35.94
缩聚层直径D0/m2.38
抗压强度σ/(kg·cm-21 767.59

表3

精确化初装球计算结果"

级别/mmdf/cm修正系数Kc级别产率λ/%

球径

/mm

各组球比/%
合计100.00100100
-16+141.61.2021.216020
-14+101.41.1932.475030
-10+0.91.01.0038.213040
-0.9+0.30.093.448.112010

表4

精确化补装球前返砂筛分结果粒级分布"

粒级/mm个别产率/%筛上累计产率/%筛下累计产率/%
合计100.00
+65.035.03100.00
-6+42.097.1294.97
-4+23.3610.4892.88
-2+0.9008.4718.9589.52
-0.900+0.45030.9749.9281.05
-0.450+0.18028.0777.9950.08
-0.180+0.1258.9086.8922.01
-0.125+0.0745.1091.9913.11
-0.074+0.0382.9694.958.01
-0.0385.05100.005.05

表5

精确化补装球后返砂筛分结果粒级分布"

粒级/mm个别产率/%筛上累计产率/%筛下累计产率/%
合计100.00
+69.289.28100.00
-6+42.3711.6590.72
-4+23.2914.9488.34
-2+0.9008.3123.2585.06
-0.900+0.45026.8050.0576.74
-0.450+0.18030.8180.8649.94
-0.180+0.12510.5591.4119.14
-0.125+0.0744.3295.738.59
-0.074+0.0382.5698.294.26
-0.0381.71100.001.71

表6

精确化补装球前溢流筛分结果粒级分布"

粒级/mm个别产率/%筛上累计产率/%筛下累计产率/%

金品位

/(g·t-1

分布率
合计100.001.96100.00
-0.900+0.4501.061.06100.000.230.12
-0.450+0.18018.3719.4398.940.302.80
-0.180+0.12517.3836.8180.570.736.45
-0.125+0.07418.8455.6563.192.4423.36
-0.074+0.03814.2669.9144.354.8735.31
-0.03830.08100.0030.082.0931.96

表7

精确化补装球后溢流筛分结果粒级分布"

粒级/mm个别产率/%筛上累计产率/%筛下累计产率/%

金品位

/(g·t-1

分布率
合计100.001.31100.00
-0.900+0.4500.170.17100.00--
-0.450+0.1809.8810.0599.830.080.60
-0.180+0.12517.0527.1089.950.7810.10
-0.125+0.07421.3948.4972.901.5224.69
-0.074+0.03815.4263.9151.511.9622.95
-0.03836.10100.0036.101.5241.67

表8

精确化补装球前后生产指标对比"

月份

原矿品位

/(g·t-1

精矿品位

/(g·t-1

回收率

/%

台时产量

/(t·h-1

磨矿细度(-0.074 mm占比)

/%

磨矿电耗

/(kW·h·t-1

球耗

/(kg·t-1

11.4118.4394.4753.2644.3511.121.12
21.5616.7393.4153.2644.3511.151.26
31.2218.1593.9453.2644.3514.231.28
前3月平均1.3917.7793.9453.2644.3512.171.22
41.4319.1696.1960.9353.6512.470.94
51.4019.0096.7455.8658.008.361.03
61.4521.2992.9250.8057.099.161.07
后3月平均1.4319.8295.2855.8656.2510.001.01
变化+0.04+2.05+1.34+2.60+11.90-2.17-0.21
Duan Xixiang,1989.Theoretical calculation of steel ball size of ball mill[J].Science in China (Series A),(8):856-863.
Duan Xixiang,1998.Study on improving the dissociation degree of mineral monomers and improving the quality of grinding products in the grinding process[J].Nonferrous Metals(Mi-neral Processing Section),(3):33-38,43.
Duan Xixiang, Cao Yijun,1999.Theory and Practice of Ball Mill Media Work[M].Beijing:Metallurgical Industry Press.
Duan Xixiang, Zhou Ping, Pan Xinchao,2004.Precision filling method of ball mill[J].Nonferrous Metals,(3):75-78.
Gao Ruizhuo, Zhou Haitao, Zhang Zhibin,et al,2023.Experimental study on grinding optimization of a gold mine based on accurate ball loading theory[J].Nonferrous Metals(Mi-neral Processing Section),(4):52-58,106.
Hu Haiyang, Wang Shengyou, Fan Zuopeng,et al,2015.Design and experimental study of a new type of grinding medium[J].Nonferrous Metals Science and Engineering,(1):85-89.
Kuang Jincai,2003.Research and practice on the relationship between grinding and flotation conditions and flotation index[J].Nonferrous Metals(Mineral Processing Section),(2):14-17,27.
Li Tongqing,2018.Dynamic Behavior of Ore Mill in Ball Mill[D].Xuzhou:China University of Mining and Technology.
Liu Zhiwei,2018.Analysis of influencing factors of mill grinding efficiency[J].Nonferrous Metals(Mineral Processing Section),(4):66-69.
Luo Chunmei,2009.Research on the Mechanism and Application of New Ways to Save Energy and Reduce Consumption of Ball Mill[D].Kunming:Kunming University of Science and Technology.
Qi Yongxin,1996.Development and application of new ball mill liner[J].Angang Mine,(3):33-36.
Ren Xiangjun,2016.Measures to increase production and reduce energy consumption of ball mill in a gold mine concentrator plant[J].Nonferrous Metallurgy Energy Conservation,32(5):34-36.
Wang Hairui,1998.Characteristics and application of high efficiency and energy saving ball mill[J].Xinjiang Nonferrous Metals,(1):20-24.
Wu Caibin,2002.Research on the Application of the Principle of Crushing Statistical Mechanics and Transfer Probability in the Filling Ball System[D].Kunming:Kunming University of Science and Technology.
Xu Huaibing, Wang Ting, Zou Wenjie,et al,2022.Ball mill load status identification method based on the convolutional neural network,optimized support vector machine model,and intelligent grinding media[J].Chinese Journal of Engineering,44(11):1821-1831.
Yang Linlin, Wen Shuming, Cheng Kun,2006.Analysis of dissociation behavior of minerals in grinding process and method for improving dissociation degree of monomers[J].Minesmetallurgy,15(2):13-16.
Yang Songrong, Jiang Zhongya,2013.Crushing Process and Application[M].Beijing:Metallurgical Industry Press.
Zeng Guizhong,2009.Research on Ball Mill Filling Method System and Precision Makeup Ball Software Development[D].Kunming:Kunming University of Science and Technology.
Zhang Jiangguo, Feng Gan, Wang Xiaochuan,et al,2022.Mechanical properties of fine-grained dense granite affected by thermal cycling[J].Engineering Science and Technology,(5):19-28.
Zhang Wei, Fang Qijia, Zhang Haiwang,2011.Analysis of factors affecting the grinding effect of ball mill[J].Shandong Metallurgy,33(5):189-190.
Zhang Zhicheng, Xiao Dingjun,XiaoYigai,2021.Mining Machinery Mining Technology and Environmental Protection[M].Chengdu:Southwest Jiaotong University Press.
Zhu Jisheng, Zhang Zhiyuan,2003.Research and application of micro-stage grinding technology[J].Metal Mine,32(3):24-26.
段希祥,1989.球磨机钢球尺寸的理论计算研究[J].中国科学(A辑),(8):856-863.
段希祥,1998.提高磨矿过程矿物单体解离度及改善磨矿产品质量研究[J].有色金属(选矿部分),(3):33-38,43.
段希祥,曹亦俊,1999.球磨机介质工作理论与实践[M].北京:冶金工业出版社.
段希祥,周平,潘新潮,2004.球磨机精确化装补球方法[J].有色金属,(3):75-78.
高瑞琢,周海涛,张智斌,等,2023.基于精确化装球理论的某金矿磨矿优化试验研究[J].有色金属(选矿部分),(4):52-58,106.
胡海祥,王盛有,范作鹏,等,2015.一种新型磨矿介质设计与磨矿试验研究[J].有色金属科学与工程,(1):85-89.
邝金才,2003.磨浮条件与浮选指标的关系研究及实践[J].有色金属(选矿部分),(2):14-17,27.
李同清,2018.球磨机矿磨介质动力学行为研究[D].徐州:中国矿业大学.
刘志伟,2018.磨机磨矿效率影响因素分析[J].有色金属(选矿部分),(4):66-69.
罗春梅,2009.球磨机节能降耗新途径机理及应用研究[D].昆明:昆明理工大学.
齐永新,1996.新型球磨机衬板的研制与应用[J].鞍钢矿山,(3):33-36.
任向军,2016.某金矿选矿厂球磨机增产节能降耗的措施[J].有色冶金节能,32(5):34-36.
王海瑞,1998.高效节能球磨机的特点及应用[J].新疆有色金属,(1):20-24.
吴彩斌,2002.破碎统计力学原理及转移概率在装补球制度中的应用研究[D].昆明:昆明理工大学.
徐怀兵,王廷,邹文杰,等,2022.基于智能磨矿介质及CNN和优化SVM模型的球磨机负荷识别方法[J].工程科学学报,44(11):1821-1831.
杨琳琳,文书明,程坤,2006.磨矿过程中矿物的解离行为分析及提高单体解离度的方法[J].矿冶,15(2):13-16.
杨松荣,蒋仲亚,2013.碎磨工艺及应用[M].北京:冶金工业出版社.
曾桂忠,2009.球磨机装补球方法体系研究与精确化装补球软件开发[D].昆明:昆明理工大学.
张建国,冯淦,王晓川,等,2022.热循环影响的细粒致密花岗岩力学特性试验[J].工程科学与技术,(5):19-28.
张伟,房启家,张海旺,2011.影响球磨机磨矿效果的因素分析[J].山东冶金,33(5):189-190.
张志呈,肖定军,肖益盖,2021.矿山机械采掘技术与环境保护[M].成都:西南交通大学出版社.
朱继生,张治元,2003.微阶段化磨矿技术研究与应用[J].金属矿山,32(3):24-26.
[1] 杨应宝,伏彦雄,裴英杰,周强,肖庆飞. 易门铜业Φ2.4×3.6 m球磨机磨矿介质配比优化研究[J]. 黄金科学技术, 2023, 31(1): 163-170.
[2] 王旭东, 肖庆飞, 张谦, 杨森, 马帅. 球磨机细磨阶段钢段与钢球磨矿效果对比[J]. 黄金科学技术, 2020, 28(5): 771-777.
[3] 李付博, 肖庆飞, 黄胤淇, 张谦, 王旭东. 江西某铜矿大型球磨机介质制度优化试验研究[J]. 黄金科学技术, 2020, 28(4): 603-609.
[4] 周海林,杨珊,陈建宏*. 黄金矿山清洁生产评价指标体系研究与应用[J]. 黄金科学技术, 2017, 25(5): 93-100.
[5] 王泽,李国清,胡乃联. 黄金矿山劳保护品标准化管理系统开发[J]. 黄金科学技术, 2016, 24(6): 78-83.
[6] 王文军,肖庆飞,康怀斌,詹信顺,吴启明,肖珲. 某金矿MQG3660格子型球磨机球荷特性优化试验研究[J]. 黄金科学技术, 2016, 24(2): 90-94.
[7] 雷小莉,李金泉,徐忠敏,段希祥. 精确化装补球技术在金翅岭金矿选矿厂的应用[J]. 黄金科学技术, 2015, 23(6): 87-91.
[8] 林鸿汉. 某含金铜废石资源化利用试验研究[J]. 黄金科学技术, 2014, 22(3): 77-81.
[9] 曹成超. 新疆某矿山浮选试验研究[J]. 黄金科学技术, 2014, 22(3): 70-76.
[10] 杨建,王建平. 氰化系统阶段提高金精矿磨矿细度的生产实践[J]. 黄金科学技术, 2013, 21(4): 91-94.
[11] 谢敏雄,李政要,林属勇,迟晓鹏,亓传铎. 提高选矿厂磨矿系统效能的技术改造及应用研究[J]. 黄金科学技术, 2012, 20(6): 65-68.
[12] 拜鹏程,何烨,陈芳芳,李科科. 磨矿细度和二浸二洗对氰化浸出率影响的试验研究[J]. 黄金科学技术, 2012, 20(5): 71-73.
[13] 孙素英,崔志勇. 扩大选矿系统生产能力的改造实践[J]. J4, 2012, 20(2): 79-81.
[14] 李威,王芳. 黄金矿山企业生产成本模块化管理及控制研究[J]. J4, 2010, 18(5): 90-92.
[15] 李炜,王宝胜,高永生. 球磨机换型及安装的方法与应用[J]. J4, 2008, 16(6): 55-57.
Viewed
Full text


Abstract

Cited

  Shared   
  Discussed   
No Suggested Reading articles found!